<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	xmlns:media="http://search.yahoo.com/mrss/"
	>

<channel>
	<title>Forest Lake News</title>
	<atom:link href="https://forestlakenews.com.au/newsmashuprss1" rel="self" type="application/rss+xml" />
	<link>https://forestlakenews.com.au</link>
	<description>News and other stories about real people, places, and events in Forest Lake and nearby suburbs.</description>
	<lastBuildDate>Mon, 16 Nov 2026 06:29:24 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>	
	<sy:updateFrequency>1</sy:updateFrequency>
		<generator>https://wordpress.org/?v=7.0.8</generator>

<image>
	<url>https://forestlakenews.com.au/wp-content/uploads/2021/04/favicon-150x150.png</url>
	<title>Forest Lake News</title>
	<link>https://forestlakenews.com.au</link>
	<width>32</width>
	<height>32</height>
</image> 
<item>
<title><![CDATA[Inventions]]></title>
<link>https://annerleynews.com.au/inventions</link>
<pubDate>Thu, 12 Nov 2026 19:16:39 +0000</pubDate>
<dc:creator><![CDATA[Annerley News]]></dc:creator>
<guid isPermaLink="true">https://annerleynews.com.au/?page_id=24177</guid>
<description><![CDATA[]]></description>
<content:encoded><![CDATA[]]></content:encoded>
</item><item>
<title><![CDATA[Heavy Rain Floods Brisbane Roads as More Storms Threaten South East Queensland]]></title>
<link>https://annerleynews.com.au/brisbane-roads-flood-more-storms-south-east-queensland/brisbane-roads-flood-more-storms-south-east-queensland</link>
<media:content url="https://annerleynews.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires.png" medium="image"/>
<media:thumbnail url="https://annerleynews.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires.png"/>
<enclosure url="https://annerleynews.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires.png" length="1832827" type="image/png"/>
<pubDate>Thu, 12 Nov 2026 02:03:46 +0000</pubDate>
<dc:creator><![CDATA[Annerley News]]></dc:creator>
<guid isPermaLink="true">https://annerleynews.com.au/brisbane-roads-flood-more-storms-south-east-queensland/</guid>
<description><![CDATA[


Heavy rain has flooded roads across parts of Brisbane as residents in Moreton Bay, Redlands and surrounding South East Queensland communities prepare for another round of potentially severe thunderstorms following Wednesday's destructive weather.



The Bureau of Meteorology has warned that further storms could develop on Thursday, 12 November, bringing damaging winds, large hail and heavy rainfall capable of causing flash flooding.



The renewed threat comes as emergency crews continue clearing fallen trees, repairing damaged powerlines and responding to storm-related property damage. More than 80,000 homes and businesses across South East Queensland lost electricity at the height of Wednesday's storms, with tens of thousands still without power on Thursday morning.



Brisbane, Redlands and Moreton Bay were all affected by intense storm activity, with rainfall observations showing how quickly conditions deteriorated across southern and eastern suburbs.



Intense rainfall floods Brisbane streets



Some of Wednesday's heaviest rainfall was recorded in Brisbane's southern and eastern suburbs, where intense downpours delivered substantial amounts of rain in just half an hour.



Bureau of Meteorology observations recorded 78 millimetres at Wishart in the 30 minutes to 4:39 p.m., while Chandler received 75 millimetres in the 30 minutes to 4:52 p.m. Nearby Burbank recorded 59 millimetres over a similar period.



The short, intense bursts of rainfall created flash-flooding hazards on local roads and placed additional pressure on drainage systems.&nbsp;



In Gumdale, Formosa Road was closed to through traffic between Stanbrough Road and Dairy Swamp Road because of flash flooding. Emergency crews were also called to Gumdale on Wednesday evening after a vehicle became stranded in floodwater. Swiftwater rescue personnel assisted the driver to safety.



Elsewhere in Brisbane, a falling tree struck two vehicles on Logan Road at Eight Mile Plains as severe winds swept through the area.



Brisbane Airport recorded a wind gust of 96 kilometres per hour at 5:03 p.m. on Wednesday, with the severe weather causing flight delays, cancellations and temporary operational disruption.



Motorists are being urged to check road conditions before travelling, particularly in areas affected by heavy rain and fallen trees. Road restrictions may be lifted or introduced as conditions change.




BRISBANE EMERGENCY DASHBOARD








Redlands hit by heavy rain as storms move towards the bay



Redlands also experienced intense rainfall as Wednesday's thunderstorms moved across eastern Brisbane and towards Moreton Bay.



The Bureau recorded 75 millimetres of rain at Leslie Harrison Dam in the 30 minutes to 4:47 p.m., placing the area among the locations that experienced the most intense short-duration rainfall during the event.



At 5:19 p.m., the Bureau issued a severe thunderstorm warning covering parts of Redland City, Brisbane and Moreton Bay. Storms detected around Ormiston and Brisbane Airport were capable of producing damaging winds and heavy rainfall that could lead to flash flooding.



Cleveland, Victoria Point, Ormiston and nearby islands were among the locations identified in warnings as the storms developed during the afternoon.



The State Emergency Service received 16 requests for assistance across Redlands following Wednesday's weather, adding to hundreds of calls received throughout South East Queensland.



Residents in Cleveland, Capalaba, Wellington Point, Victoria Point and surrounding suburbs can check the Redlands Coast Disaster Dashboard for local warnings, road closures, electricity interruptions and emergency information.




REDLANDS COAST DISASTER DASHBOARD








The dashboard also provides evacuation information when relevant. No widespread evacuation order affecting Redlands has been established in the reports reviewed for this article.



Moreton Bay suburbs face further storm threat



Communities across Moreton Bay were also within the path of Wednesday's severe weather, with storm cells developing near Caboolture and Burpengary before moving towards the coast.



The Bureau's afternoon warnings identified conditions capable of producing damaging winds, large hail and intense rainfall across parts of the Moreton Bay region.



By early evening, the warning area extended towards the waters off Redcliffe, with Redcliffe and Scarborough among the locations forecast to be affected as the storms moved north and northeast.



Electricity interruptions were reported across the wider Moreton Bay region during Wednesday's severe weather, although the largest concentration of damage to the Energex network occurred further south in Logan and the Scenic Rim.



For residents in Caboolture, Morayfield, Burpengary, North Lakes, Redcliffe and neighbouring suburbs, the City of Moreton Bay Disaster Dashboard provides a central source of local emergency updates.




CITY OF MORETON BAY DISASTER DASHBOARD








The council's dashboard includes weather warnings, road conditions, power outages and information about emergency facilities and available disaster support services.



Residents should continue checking official updates, particularly where local roads, waterways or properties remain vulnerable to another period of heavy rainfall.



Electricity restoration continues across the south-east



Restoring electricity remains one of the largest recovery operations following Wednesday's storms, with widespread damage to powerlines, poles and other infrastructure.



Energex reported more than 400 sections of powerline brought down across South East Queensland, while more than 120,000 lightning strikes were recorded during the severe weather.



The worst electrical damage was concentrated in Logan and the Scenic Rim, where falling trees and damaged infrastructure left tens of thousands of properties disconnected.



By Thursday morning, approximately 55,000 properties across the region remained without power, according to ABC News reporting based on Energex information. Repair crews were being reinforced as assessments identified damaged poles and lines requiring replacement.



Some customers may face prolonged interruptions, particularly where access is obstructed or major infrastructure repairs are required.



Residents in Brisbane, Redlands and Moreton Bay can use the Energex Outage Finder to check reported power interruptions, affected locations and available restoration estimates.




ENERGEX OUTAGE FINDER








Energex has warned residents to remain clear of fallen electrical wires and to treat damaged powerlines as live. Electrical emergencies can be reported on 13 19 62.



School closures and transport disruption



Wednesday's storms also disrupted education across South East Queensland, with schools in the hardest-hit districts unable to operate normally because of damage and electricity interruptions.



Eleven state schools in the Logan City Council area were reported closed on Thursday morning, including campuses in Marsden, Crestmead, Jimboomba and Yarrabilba. Subsequent reporting placed the number of affected schools in the broader Logan and Jimboomba area at 13.



Within Brisbane, Mansfield State School cancelled a prep orientation session after experiencing telephone and internet disruption.



Parents across Brisbane, Moreton Bay and Redlands can check the Queensland Government's current emergency school closures register for information about affected state, independent and Catholic schools.




QLD SCHOOL CLOSURES








The register should be checked before travelling, as schools may reopen once power, access and safety conditions have been assessed. Families should also consult their school's own communications for local arrangements.



Transport disruption has extended beyond flooded roads. Brisbane Airport experienced delays and cancellations during Wednesday's storms, while local road hazards included fallen branches, damaged traffic infrastructure and standing water.



Drivers can check QLDTraffic or the Transport and Main Roads Road Status Update for restrictions affecting state-controlled roads. Council emergency dashboards provide additional local information.




TMR ROAD STATUS UPDATE








Emergency crews respond to hundreds of calls



The State Emergency Service received more than 320 requests for assistance across South East Queensland after Wednesday's storms.



Logan accounted for the majority of the calls, but emergency crews were also deployed across Brisbane, Redlands and other affected areas.



The requests largely involved fallen trees, damaged roofs, blocked access to properties and other storm-related hazards. Brisbane recorded 41 requests, while Redlands recorded 16.



Emergency workers have been clearing debris, securing damaged structures and helping residents protect properties exposed to further rainfall.



Authorities are also urging residents to avoid floodwater and stay away from fallen electrical infrastructure. Even shallow floodwater can conceal damaged road surfaces, debris and strong currents.



More severe thunderstorms possible



The Bureau of Meteorology has forecast another period of unsettled weather across South East Queensland on Thursday, with severe thunderstorms possible from the Gold Coast through Brisbane and the Sunshine Coast towards Bundaberg.



Forecasters have identified damaging winds, large hail and heavy rainfall leading to flash flooding as the main hazards.



The threat is particularly concerning for communities still dealing with damaged buildings, blocked access and electricity interruptions from Wednesday's storms.



Storm activity may ease in some districts on Friday before increasing again over the weekend as another weather system develops across inland Queensland.



Residents should monitor the Bureau of Meteorology's Queensland warnings and check their local council's emergency information before making travel plans.




BOM QUEENSLAND WARNINGS









  What residents should do
  
    Check weather warnings before travelling
    Avoid flooded roads and never drive through floodwater
    Stay clear of fallen powerlines
    Charge phones and devices while power is available
    Secure loose outdoor items where safe
    Call SES on 132 500 for non-life-threatening storm damage
    Call 000 in a life-threatening emergency
  




Published 12-Nov-2026
]]></description>
<content:encoded><![CDATA[


Heavy rain has flooded roads across parts of Brisbane as residents in Moreton Bay, Redlands and surrounding South East Queensland communities prepare for another round of potentially severe thunderstorms following Wednesday's destructive weather.



The Bureau of Meteorology has warned that further storms could develop on Thursday, 12 November, bringing damaging winds, large hail and heavy rainfall capable of causing flash flooding.



The renewed threat comes as emergency crews continue clearing fallen trees, repairing damaged powerlines and responding to storm-related property damage. More than 80,000 homes and businesses across South East Queensland lost electricity at the height of Wednesday's storms, with tens of thousands still without power on Thursday morning.



Brisbane, Redlands and Moreton Bay were all affected by intense storm activity, with rainfall observations showing how quickly conditions deteriorated across southern and eastern suburbs.



Intense rainfall floods Brisbane streets



Some of Wednesday's heaviest rainfall was recorded in Brisbane's southern and eastern suburbs, where intense downpours delivered substantial amounts of rain in just half an hour.



Bureau of Meteorology observations recorded 78 millimetres at Wishart in the 30 minutes to 4:39 p.m., while Chandler received 75 millimetres in the 30 minutes to 4:52 p.m. Nearby Burbank recorded 59 millimetres over a similar period.



The short, intense bursts of rainfall created flash-flooding hazards on local roads and placed additional pressure on drainage systems.&nbsp;



In Gumdale, Formosa Road was closed to through traffic between Stanbrough Road and Dairy Swamp Road because of flash flooding. Emergency crews were also called to Gumdale on Wednesday evening after a vehicle became stranded in floodwater. Swiftwater rescue personnel assisted the driver to safety.



Elsewhere in Brisbane, a falling tree struck two vehicles on Logan Road at Eight Mile Plains as severe winds swept through the area.



Brisbane Airport recorded a wind gust of 96 kilometres per hour at 5:03 p.m. on Wednesday, with the severe weather causing flight delays, cancellations and temporary operational disruption.



Motorists are being urged to check road conditions before travelling, particularly in areas affected by heavy rain and fallen trees. Road restrictions may be lifted or introduced as conditions change.




BRISBANE EMERGENCY DASHBOARD








Redlands hit by heavy rain as storms move towards the bay



Redlands also experienced intense rainfall as Wednesday's thunderstorms moved across eastern Brisbane and towards Moreton Bay.



The Bureau recorded 75 millimetres of rain at Leslie Harrison Dam in the 30 minutes to 4:47 p.m., placing the area among the locations that experienced the most intense short-duration rainfall during the event.



At 5:19 p.m., the Bureau issued a severe thunderstorm warning covering parts of Redland City, Brisbane and Moreton Bay. Storms detected around Ormiston and Brisbane Airport were capable of producing damaging winds and heavy rainfall that could lead to flash flooding.



Cleveland, Victoria Point, Ormiston and nearby islands were among the locations identified in warnings as the storms developed during the afternoon.



The State Emergency Service received 16 requests for assistance across Redlands following Wednesday's weather, adding to hundreds of calls received throughout South East Queensland.



Residents in Cleveland, Capalaba, Wellington Point, Victoria Point and surrounding suburbs can check the Redlands Coast Disaster Dashboard for local warnings, road closures, electricity interruptions and emergency information.




REDLANDS COAST DISASTER DASHBOARD








The dashboard also provides evacuation information when relevant. No widespread evacuation order affecting Redlands has been established in the reports reviewed for this article.



Moreton Bay suburbs face further storm threat



Communities across Moreton Bay were also within the path of Wednesday's severe weather, with storm cells developing near Caboolture and Burpengary before moving towards the coast.



The Bureau's afternoon warnings identified conditions capable of producing damaging winds, large hail and intense rainfall across parts of the Moreton Bay region.



By early evening, the warning area extended towards the waters off Redcliffe, with Redcliffe and Scarborough among the locations forecast to be affected as the storms moved north and northeast.



Electricity interruptions were reported across the wider Moreton Bay region during Wednesday's severe weather, although the largest concentration of damage to the Energex network occurred further south in Logan and the Scenic Rim.



For residents in Caboolture, Morayfield, Burpengary, North Lakes, Redcliffe and neighbouring suburbs, the City of Moreton Bay Disaster Dashboard provides a central source of local emergency updates.




CITY OF MORETON BAY DISASTER DASHBOARD








The council's dashboard includes weather warnings, road conditions, power outages and information about emergency facilities and available disaster support services.



Residents should continue checking official updates, particularly where local roads, waterways or properties remain vulnerable to another period of heavy rainfall.



Electricity restoration continues across the south-east



Restoring electricity remains one of the largest recovery operations following Wednesday's storms, with widespread damage to powerlines, poles and other infrastructure.



Energex reported more than 400 sections of powerline brought down across South East Queensland, while more than 120,000 lightning strikes were recorded during the severe weather.



The worst electrical damage was concentrated in Logan and the Scenic Rim, where falling trees and damaged infrastructure left tens of thousands of properties disconnected.



By Thursday morning, approximately 55,000 properties across the region remained without power, according to ABC News reporting based on Energex information. Repair crews were being reinforced as assessments identified damaged poles and lines requiring replacement.



Some customers may face prolonged interruptions, particularly where access is obstructed or major infrastructure repairs are required.



Residents in Brisbane, Redlands and Moreton Bay can use the Energex Outage Finder to check reported power interruptions, affected locations and available restoration estimates.




ENERGEX OUTAGE FINDER








Energex has warned residents to remain clear of fallen electrical wires and to treat damaged powerlines as live. Electrical emergencies can be reported on 13 19 62.



School closures and transport disruption



Wednesday's storms also disrupted education across South East Queensland, with schools in the hardest-hit districts unable to operate normally because of damage and electricity interruptions.



Eleven state schools in the Logan City Council area were reported closed on Thursday morning, including campuses in Marsden, Crestmead, Jimboomba and Yarrabilba. Subsequent reporting placed the number of affected schools in the broader Logan and Jimboomba area at 13.



Within Brisbane, Mansfield State School cancelled a prep orientation session after experiencing telephone and internet disruption.



Parents across Brisbane, Moreton Bay and Redlands can check the Queensland Government's current emergency school closures register for information about affected state, independent and Catholic schools.




QLD SCHOOL CLOSURES








The register should be checked before travelling, as schools may reopen once power, access and safety conditions have been assessed. Families should also consult their school's own communications for local arrangements.



Transport disruption has extended beyond flooded roads. Brisbane Airport experienced delays and cancellations during Wednesday's storms, while local road hazards included fallen branches, damaged traffic infrastructure and standing water.



Drivers can check QLDTraffic or the Transport and Main Roads Road Status Update for restrictions affecting state-controlled roads. Council emergency dashboards provide additional local information.




TMR ROAD STATUS UPDATE








Emergency crews respond to hundreds of calls



The State Emergency Service received more than 320 requests for assistance across South East Queensland after Wednesday's storms.



Logan accounted for the majority of the calls, but emergency crews were also deployed across Brisbane, Redlands and other affected areas.



The requests largely involved fallen trees, damaged roofs, blocked access to properties and other storm-related hazards. Brisbane recorded 41 requests, while Redlands recorded 16.



Emergency workers have been clearing debris, securing damaged structures and helping residents protect properties exposed to further rainfall.



Authorities are also urging residents to avoid floodwater and stay away from fallen electrical infrastructure. Even shallow floodwater can conceal damaged road surfaces, debris and strong currents.



More severe thunderstorms possible



The Bureau of Meteorology has forecast another period of unsettled weather across South East Queensland on Thursday, with severe thunderstorms possible from the Gold Coast through Brisbane and the Sunshine Coast towards Bundaberg.



Forecasters have identified damaging winds, large hail and heavy rainfall leading to flash flooding as the main hazards.



The threat is particularly concerning for communities still dealing with damaged buildings, blocked access and electricity interruptions from Wednesday's storms.



Storm activity may ease in some districts on Friday before increasing again over the weekend as another weather system develops across inland Queensland.



Residents should monitor the Bureau of Meteorology's Queensland warnings and check their local council's emergency information before making travel plans.




BOM QUEENSLAND WARNINGS









  What residents should do
  
    Check weather warnings before travelling
    Avoid flooded roads and never drive through floodwater
    Stay clear of fallen powerlines
    Charge phones and devices while power is available
    Secure loose outdoor items where safe
    Call SES on 132 500 for non-life-threatening storm damage
    Call 000 in a life-threatening emergency
  




Published 12-Nov-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Queensland E-Bike Assurance Scheme: What Owners Need to Know]]></title>
<link>https://annerleynews.com.au/queensland-e-bike-assurance-scheme-inspection-centres-2026/queensland-e-bike-assurance-scheme-inspection-centres-2026</link>
<media:content url="https://annerleynews.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes.png" medium="image"/>
<media:thumbnail url="https://annerleynews.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes.png"/>
<enclosure url="https://annerleynews.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes.png" length="1452970" type="image/png"/>
<pubDate>Wed, 11 Nov 2026 03:16:32 +0000</pubDate>
<dc:creator><![CDATA[Annerley News]]></dc:creator>
<guid isPermaLink="true">https://annerleynews.com.au/queensland-e-bike-assurance-scheme-inspection-centres-2026/</guid>
<description><![CDATA[


Queensland e-bike owners facing new compliance requirements have only nine authorised inspection centres available statewide, with no locations currently listed in several major regional cities.



The Electrically Power-Assisted Cycle (EPAC) Assurance Scheme commenced on 2 November 2026, allowing owners of eligible older e-bikes to have their devices inspected and approved for continued legal use. However, the initial network consists entirely of Trek bicycle stores, most of them concentrated in south-east Queensland.



The state's official directory of authorised verifiers lists three centres in Brisbane, two on the Gold Coast, and one each in Ipswich, Moreton Bay, the Sunshine Coast and Rockhampton. There are no authorised locations currently listed in Townsville, Cairns, Toowoomba or Mackay.



Owners requiring verification must book an appointment and bring their e-bike to an approved retailer. The Department of Transport and Main Roads advises that appointments may take a couple of weeks, depending on individual store capacity.



The department expects additional retailers to join the program over the coming months. Alternative arrangements are also being developed for rural and remote residents without reasonable access to a verifier, with further details expected in early 2027.



Which e-bikes need inspection?



The scheme primarily covers eligible e-bikes manufactured before 1 July 2026 that do not meet the European EN 15194 standard or lack the required compliance label.



To qualify, these older bicycles must have pedals as their primary source of power, a maximum continuous rated motor output of 250 watts, and motor assistance that stops at 25 km/h. Where throttle control is fitted, throttle-only assistance must be limited to 6 km/h to help riders start moving.



Devices must also satisfy other technical and safety requirements before an authorised retailer can approve them. E-bikes that already meet EN 15194 and display the required compliance label do not need another inspection.



For eligible older bicycles, the initial pre-screening is free. A formal assessment may cost up to $50, with a further $20 permitted for issuing a permanent compliance label and recording the verification.



Owners covered by the transition arrangements have until 28 February 2027 to obtain the required label. From 1 March 2027, e-bikes that need verification must display the appropriate compliance label to continue being ridden legally in public.



The scheme cannot be used to legalise high-powered, high-speed or illegally modified devices. It also provides a separate pathway for certain e-bikes and e-trikes designed or adapted for people with disabilities or medical conditions.



A label issued through the scheme confirms that an eligible device has met Queensland's verification requirements. It does not certify full compliance with the European EN 15194 standard.






  
    Queensland E-Bike Inspections: What Owners Need to Know
  

  
    Queensland's new EPAC Assurance Scheme allows eligible older e-bikes to be inspected and approved for continued legal use.
  

  
    Scheme commenced: 2 November 2026
    Compliance deadline: 28 February 2027
    Initial screening: Free
    Formal inspection: Up to $50
    Compliance label: Up to $20
    Total possible cost: $70
    Authorised locations: Nine across Queensland at launch
    Already compliant? E-bikes meeting EN 15194 and displaying the required label do not need another inspection.
    Bookings: Appointments must be arranged with an authorised retailer.
  

  
    Important: The scheme does not legalise high-powered, high-speed or illegally modified devices.
  

  
    Source:
    
      Queensland Department of Transport and Main Roads – EPAC Assurance Scheme
    
  






Cycling advocates highlight the cost of compliance



Bicycle Queensland has supported clearer rules distinguishing lawful pedal-assisted bicycles from illegal high-powered devices, while the cost and accessibility of verification remain concerns for cycling advocates.



In its published explanation of the new laws, the organisation outlines the inspection process and the potential $70 charge facing owners whose existing bicycles require verification.



The fee applies to the formal assessment and labelling process rather than every e-bike owner. Riders whose bicycles already carry the correct EN 15194 label are not required to pay for another inspection.



The limited number of participating retailers also presents a practical question for people living far from an inspection centre, particularly those who rely on their e-bikes for everyday transport.



Bicycle Industries Australia has welcomed the scheme. Its general manager, Peter Bourke, has supported measures that help riders access safe, legal products and said the program would allow bicycle businesses to assist owners in establishing whether their devices meet Queensland's requirements.



The Department of Transport and Main Roads has described the scheme as a practical way for owners of legitimate existing e-bikes to continue riding, while keeping dangerous high-powered and high-speed devices off public roads and paths.



Research shows e-bikes are used across Queensland



The availability of inspection centres takes on wider significance when considered alongside new research into the growing number of Queenslanders using electric bicycles and other e-mobility devices.



A University of Queensland study, released on 21 October 2026, estimated that Queenslanders owned approximately 587,000 e-bikes, accounting for 61 per cent of privately owned e-mobility devices. The study also estimated 352,100 e-scooters and 30,400 other devices.



Researchers found that one in three Queensland households owned an e-mobility device, with total household spending on the devices estimated at $2.2 billion. Ownership was not confined to metropolitan areas. The study found that 28 per cent of households in remote Queensland reported owning an e-mobility device, reinforcing the importance of access to transport options outside major cities.



For one in four e-mobility users surveyed, a private car was their only alternative means of transport. More than half of the primary users of privately owned devices were aged 50 or older. The findings point to the role electric transport now plays in everyday travel, from commuting and shopping to recreation and maintaining independence.



However, the estimated 587,000 e-bikes do not represent the number requiring inspection under the new scheme. Many already meet the relevant standards, while others may be ineligible for verification.



The research also identified safety concerns. About half of privately owned e-mobility devices were classified as non-compliant based on owners' self-reported speed, motor power and throttle characteristics.



Researchers cautioned that the findings covered different types of e-mobility devices and did not establish how many existing e-bikes would require inspection or replacement compliance labels.



Safety reforms target illegal high-powered devices



The assurance scheme forms part of Queensland's broader e-mobility reforms, introduced amid concerns about serious injuries, unsafe riding and devices capable of travelling well beyond the permitted limits.



New rules introduced during 2026 include restrictions on motor power and speed, tighter age and licensing requirements, and expanded police enforcement powers.



Under the state's current e-bike rules, bicycles powered by motors exceeding 250 watts of maximum continuous rated output cannot legally be ridden on public roads or paths as ordinary e-bikes. Devices that depend entirely on throttle power, rather than pedalling, are also prohibited, apart from the limited starting assistance permitted under the rules. Police can issue significant fines and seize illegal devices.



Transport authorities say the verification process is intended to distinguish suitable older bicycles from machines that fail the state's safety requirements. The scheme gives owners of qualifying existing e-bikes a means of keeping their bicycles on the road without requiring them to meet every provision of the European standard introduced for newer devices.



Where owners can get their e-bikes checked



As of 11 November 2026, the Queensland Government lists nine authorised inspection centres, all operated by Trek Bicycle.



RegionAuthorised inspection centreBrisbaneTrek CarindaleBrisbaneTrek WindsorBrisbaneTrek WoolloongabbaIpswichTrek Ipswich, East IpswichMoreton BayTrek North LakesGold CoastTrek Ashmore, MolendinarGold CoastTrek Burleigh HeadsSunshine CoastTrek Sunshine Coast, MinyamaCentral QueenslandTrek Rockhampton, Norman Gardens



Source: Queensland Department of Transport and Main Roads, EPAC Assurance Scheme authorised verifier directory. The government has advised owners to check the directory regularly as more retailers join the scheme.



Owners must contact an authorised retailer to arrange an inspection before visiting. The department recommends bringing any available information about the bicycle's make, model, purchase date and technical specifications.



For eligible riders whose bicycles still need verification, the transition period provides an opportunity to arrange an inspection before the February deadline. Whether the expanding network reaches more regional communities before then remains an important question as the scheme progresses.



Published 10-Nov-2026Featured Image Credit: Brisbane City Council




]]></description>
<content:encoded><![CDATA[


Queensland e-bike owners facing new compliance requirements have only nine authorised inspection centres available statewide, with no locations currently listed in several major regional cities.



The Electrically Power-Assisted Cycle (EPAC) Assurance Scheme commenced on 2 November 2026, allowing owners of eligible older e-bikes to have their devices inspected and approved for continued legal use. However, the initial network consists entirely of Trek bicycle stores, most of them concentrated in south-east Queensland.



The state's official directory of authorised verifiers lists three centres in Brisbane, two on the Gold Coast, and one each in Ipswich, Moreton Bay, the Sunshine Coast and Rockhampton. There are no authorised locations currently listed in Townsville, Cairns, Toowoomba or Mackay.



Owners requiring verification must book an appointment and bring their e-bike to an approved retailer. The Department of Transport and Main Roads advises that appointments may take a couple of weeks, depending on individual store capacity.



The department expects additional retailers to join the program over the coming months. Alternative arrangements are also being developed for rural and remote residents without reasonable access to a verifier, with further details expected in early 2027.



Which e-bikes need inspection?



The scheme primarily covers eligible e-bikes manufactured before 1 July 2026 that do not meet the European EN 15194 standard or lack the required compliance label.



To qualify, these older bicycles must have pedals as their primary source of power, a maximum continuous rated motor output of 250 watts, and motor assistance that stops at 25 km/h. Where throttle control is fitted, throttle-only assistance must be limited to 6 km/h to help riders start moving.



Devices must also satisfy other technical and safety requirements before an authorised retailer can approve them. E-bikes that already meet EN 15194 and display the required compliance label do not need another inspection.



For eligible older bicycles, the initial pre-screening is free. A formal assessment may cost up to $50, with a further $20 permitted for issuing a permanent compliance label and recording the verification.



Owners covered by the transition arrangements have until 28 February 2027 to obtain the required label. From 1 March 2027, e-bikes that need verification must display the appropriate compliance label to continue being ridden legally in public.



The scheme cannot be used to legalise high-powered, high-speed or illegally modified devices. It also provides a separate pathway for certain e-bikes and e-trikes designed or adapted for people with disabilities or medical conditions.



A label issued through the scheme confirms that an eligible device has met Queensland's verification requirements. It does not certify full compliance with the European EN 15194 standard.






  
    Queensland E-Bike Inspections: What Owners Need to Know
  

  
    Queensland's new EPAC Assurance Scheme allows eligible older e-bikes to be inspected and approved for continued legal use.
  

  
    Scheme commenced: 2 November 2026
    Compliance deadline: 28 February 2027
    Initial screening: Free
    Formal inspection: Up to $50
    Compliance label: Up to $20
    Total possible cost: $70
    Authorised locations: Nine across Queensland at launch
    Already compliant? E-bikes meeting EN 15194 and displaying the required label do not need another inspection.
    Bookings: Appointments must be arranged with an authorised retailer.
  

  
    Important: The scheme does not legalise high-powered, high-speed or illegally modified devices.
  

  
    Source:
    
      Queensland Department of Transport and Main Roads – EPAC Assurance Scheme
    
  






Cycling advocates highlight the cost of compliance



Bicycle Queensland has supported clearer rules distinguishing lawful pedal-assisted bicycles from illegal high-powered devices, while the cost and accessibility of verification remain concerns for cycling advocates.



In its published explanation of the new laws, the organisation outlines the inspection process and the potential $70 charge facing owners whose existing bicycles require verification.



The fee applies to the formal assessment and labelling process rather than every e-bike owner. Riders whose bicycles already carry the correct EN 15194 label are not required to pay for another inspection.



The limited number of participating retailers also presents a practical question for people living far from an inspection centre, particularly those who rely on their e-bikes for everyday transport.



Bicycle Industries Australia has welcomed the scheme. Its general manager, Peter Bourke, has supported measures that help riders access safe, legal products and said the program would allow bicycle businesses to assist owners in establishing whether their devices meet Queensland's requirements.



The Department of Transport and Main Roads has described the scheme as a practical way for owners of legitimate existing e-bikes to continue riding, while keeping dangerous high-powered and high-speed devices off public roads and paths.



Research shows e-bikes are used across Queensland



The availability of inspection centres takes on wider significance when considered alongside new research into the growing number of Queenslanders using electric bicycles and other e-mobility devices.



A University of Queensland study, released on 21 October 2026, estimated that Queenslanders owned approximately 587,000 e-bikes, accounting for 61 per cent of privately owned e-mobility devices. The study also estimated 352,100 e-scooters and 30,400 other devices.



Researchers found that one in three Queensland households owned an e-mobility device, with total household spending on the devices estimated at $2.2 billion. Ownership was not confined to metropolitan areas. The study found that 28 per cent of households in remote Queensland reported owning an e-mobility device, reinforcing the importance of access to transport options outside major cities.



For one in four e-mobility users surveyed, a private car was their only alternative means of transport. More than half of the primary users of privately owned devices were aged 50 or older. The findings point to the role electric transport now plays in everyday travel, from commuting and shopping to recreation and maintaining independence.



However, the estimated 587,000 e-bikes do not represent the number requiring inspection under the new scheme. Many already meet the relevant standards, while others may be ineligible for verification.



The research also identified safety concerns. About half of privately owned e-mobility devices were classified as non-compliant based on owners' self-reported speed, motor power and throttle characteristics.



Researchers cautioned that the findings covered different types of e-mobility devices and did not establish how many existing e-bikes would require inspection or replacement compliance labels.



Safety reforms target illegal high-powered devices



The assurance scheme forms part of Queensland's broader e-mobility reforms, introduced amid concerns about serious injuries, unsafe riding and devices capable of travelling well beyond the permitted limits.



New rules introduced during 2026 include restrictions on motor power and speed, tighter age and licensing requirements, and expanded police enforcement powers.



Under the state's current e-bike rules, bicycles powered by motors exceeding 250 watts of maximum continuous rated output cannot legally be ridden on public roads or paths as ordinary e-bikes. Devices that depend entirely on throttle power, rather than pedalling, are also prohibited, apart from the limited starting assistance permitted under the rules. Police can issue significant fines and seize illegal devices.



Transport authorities say the verification process is intended to distinguish suitable older bicycles from machines that fail the state's safety requirements. The scheme gives owners of qualifying existing e-bikes a means of keeping their bicycles on the road without requiring them to meet every provision of the European standard introduced for newer devices.



Where owners can get their e-bikes checked



As of 11 November 2026, the Queensland Government lists nine authorised inspection centres, all operated by Trek Bicycle.



RegionAuthorised inspection centreBrisbaneTrek CarindaleBrisbaneTrek WindsorBrisbaneTrek WoolloongabbaIpswichTrek Ipswich, East IpswichMoreton BayTrek North LakesGold CoastTrek Ashmore, MolendinarGold CoastTrek Burleigh HeadsSunshine CoastTrek Sunshine Coast, MinyamaCentral QueenslandTrek Rockhampton, Norman Gardens



Source: Queensland Department of Transport and Main Roads, EPAC Assurance Scheme authorised verifier directory. The government has advised owners to check the directory regularly as more retailers join the scheme.



Owners must contact an authorised retailer to arrange an inspection before visiting. The department recommends bringing any available information about the bicycle's make, model, purchase date and technical specifications.



For eligible riders whose bicycles still need verification, the transition period provides an opportunity to arrange an inspection before the February deadline. Whether the expanding network reaches more regional communities before then remains an important question as the scheme progresses.



Published 10-Nov-2026Featured Image Credit: Brisbane City Council




]]></content:encoded>
</item><item>
<title><![CDATA[Brisbane Oratory Christmas Markets to Bring Festive Spirit to Annerley]]></title>
<link>https://annerleynews.com.au/brisbane-oratory-christmas-markets-annerley-2026</link>
<media:content url="https://annerleynews.com.au/wp-content/uploads/2026/11/FI-for-OMC-76.webp" medium="image"/>
<media:thumbnail url="https://annerleynews.com.au/wp-content/uploads/2026/11/FI-for-OMC-76.webp"/>
<enclosure url="https://annerleynews.com.au/wp-content/uploads/2026/11/FI-for-OMC-76.webp" length="80628" type="image/webp"/>
<pubDate>Wed, 04 Nov 2026 09:59:57 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[annerley]]></category>
<category><![CDATA[Brisbane Oratory]]></category>
<category><![CDATA[Christmas Markets]]></category>
<dc:creator><![CDATA[Annerley News]]></dc:creator>
<guid isPermaLink="true">https://annerleynews.com.au/?page_id=24148</guid>
<description><![CDATA[
Annerley's Christmas calendar will get an early festive addition when the Brisbane Oratory Christmas Markets return to Mary Immaculate Hall for their third year, bringing local makers, families, and parishioners together for a two-day event in November.







Read: Brisbane Oratory Christmas Market Debuts in Annerley







Organised by the Brisbane Oratory in Formation, the markets will feature handmade gifts, homemade treats and Christmas decorations, with stalls run by members of the community, including children.



Shoppers can browse a variety of products ahead of the holiday season, with the selection extending beyond traditional religious merchandise. Belts, pouches, and skincare products are among the items available, alongside seasonal decorations and homemade treats. The program will offer two opportunities to visit, beginning with a twilight market on Saturday, November 21, before continuing with a morning session the following day.



Local Creativity Takes Centre Stage



Photo credit: Facebook/The Brisbane Oratory in Formation



The markets provide an opportunity for community members to share their creative skills and introduce their products to local shoppers. The involvement of children alongside adult stallholders also gives younger participants a chance to contribute to the weekend's activities.



Visitors can expect a range of gift ideas, from handmade items to baked goods, with products suited to different interests. The variety also means shoppers can look beyond conventional Christmas presents while supporting people within their local community.



Following two previous editions, the return of the markets for a third year continues an event that brings together the parish and the wider Annerley community.







Read: Find Unique Gifts and Support Local Businesses at Vend Annerley's Christmas Twilight Market







A Festive Gathering Ahead of Advent



The November event also falls ahead of Advent, the Christian season of preparation leading up to Christmas. The Brisbane Oratory has highlighted the markets as an opportunity for the community to recognise the talents and skills of those taking part, while preparing for the Christmas season.



Held at Mary Immaculate Hall in Annerley, the weekend gathering will feature an evening session and a Sunday morning market, giving residents and visitors time to browse the stalls and meet the people behind the products.



With handmade gifts, homemade food and community participation at its centre, the markets will offer Annerley residents another opportunity to come together as the Christmas season approaches.




  Brisbane Oratory Christmas Markets

  
    Venue:
    Mary Immaculate Hall, Annerley
  

  
    Twilight Market
    Saturday, 21 November 2026
    4.30pm – 9pm
  

  
    Morning Market
    Sunday, 22 November 2026
    7.30am – 12pm
  

  
    Check the Brisbane Oratory's official event information
    before attending for any changes.
  



.event-box {
  max-width: 600px;
  margin: 24px auto;
  padding: 20px;
  border: 1px solid #ddd;
  border-radius: 8px;
  font-family: Arial, sans-serif;
  line-height: 1.6;
  box-sizing: border-box;
}
.event-box h3 {
  margin-top: 0;
  font-size: 21px;
}
.event-session {
  padding: 12px 0;
  border-top: 1px solid #ddd;
}
.event-session h4 {
  margin: 0 0 6px;
}
.event-session p {
  margin: 3px 0;
}
.event-note {
  font-size: 13px;
  color: #555;
}




Published 4-November-2026




]]></description>
<content:encoded><![CDATA[
Annerley's Christmas calendar will get an early festive addition when the Brisbane Oratory Christmas Markets return to Mary Immaculate Hall for their third year, bringing local makers, families, and parishioners together for a two-day event in November.







Read: Brisbane Oratory Christmas Market Debuts in Annerley







Organised by the Brisbane Oratory in Formation, the markets will feature handmade gifts, homemade treats and Christmas decorations, with stalls run by members of the community, including children.



Shoppers can browse a variety of products ahead of the holiday season, with the selection extending beyond traditional religious merchandise. Belts, pouches, and skincare products are among the items available, alongside seasonal decorations and homemade treats. The program will offer two opportunities to visit, beginning with a twilight market on Saturday, November 21, before continuing with a morning session the following day.



Local Creativity Takes Centre Stage



Photo credit: Facebook/The Brisbane Oratory in Formation



The markets provide an opportunity for community members to share their creative skills and introduce their products to local shoppers. The involvement of children alongside adult stallholders also gives younger participants a chance to contribute to the weekend's activities.



Visitors can expect a range of gift ideas, from handmade items to baked goods, with products suited to different interests. The variety also means shoppers can look beyond conventional Christmas presents while supporting people within their local community.



Following two previous editions, the return of the markets for a third year continues an event that brings together the parish and the wider Annerley community.







Read: Find Unique Gifts and Support Local Businesses at Vend Annerley's Christmas Twilight Market







A Festive Gathering Ahead of Advent



The November event also falls ahead of Advent, the Christian season of preparation leading up to Christmas. The Brisbane Oratory has highlighted the markets as an opportunity for the community to recognise the talents and skills of those taking part, while preparing for the Christmas season.



Held at Mary Immaculate Hall in Annerley, the weekend gathering will feature an evening session and a Sunday morning market, giving residents and visitors time to browse the stalls and meet the people behind the products.



With handmade gifts, homemade food and community participation at its centre, the markets will offer Annerley residents another opportunity to come together as the Christmas season approaches.




  Brisbane Oratory Christmas Markets

  
    Venue:
    Mary Immaculate Hall, Annerley
  

  
    Twilight Market
    Saturday, 21 November 2026
    4.30pm – 9pm
  

  
    Morning Market
    Sunday, 22 November 2026
    7.30am – 12pm
  

  
    Check the Brisbane Oratory's official event information
    before attending for any changes.
  



.event-box {
  max-width: 600px;
  margin: 24px auto;
  padding: 20px;
  border: 1px solid #ddd;
  border-radius: 8px;
  font-family: Arial, sans-serif;
  line-height: 1.6;
  box-sizing: border-box;
}
.event-box h3 {
  margin-top: 0;
  font-size: 21px;
}
.event-session {
  padding: 12px 0;
  border-top: 1px solid #ddd;
}
.event-session h4 {
  margin: 0 0 6px;
}
.event-session p {
  margin: 3px 0;
}
.event-note {
  font-size: 13px;
  color: #555;
}




Published 4-November-2026




]]></content:encoded>
</item><item>
<title><![CDATA[Princess Alexandra Hospital Seeks Artists for Wards and Corridors in Woollongabba]]></title>
<link>https://annerleynews.com.au/princess-alexandra-hospital-seeks-artists-for-wards-and-corridors-in-woollongabba</link>
<media:content url="https://annerleynews.com.au/wp-content/uploads/2026/11/PA-Hospital.png" medium="image"/>
<media:thumbnail url="https://annerleynews.com.au/wp-content/uploads/2026/11/PA-Hospital.png"/>
<enclosure url="https://annerleynews.com.au/wp-content/uploads/2026/11/PA-Hospital.png" length="1492103" type="image/png"/>
<pubDate>Mon, 02 Nov 2026 23:55:09 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[artist collectives]]></category>
<category><![CDATA[Arts in Health]]></category>
<category><![CDATA[arts opportunities]]></category>
<category><![CDATA[call for artists]]></category>
<category><![CDATA[Health Infrastructure Queensland]]></category>
<category><![CDATA[hospital artwork]]></category>
<category><![CDATA[Metro South Health]]></category>
<category><![CDATA[PA Hospital expansion]]></category>
<category><![CDATA[princess alexandra hospital]]></category>
<category><![CDATA[public art]]></category>
<category><![CDATA[Queensland Health]]></category>
<category><![CDATA[registration of interest]]></category>
<category><![CDATA[Woolloongabba]]></category>
<dc:creator><![CDATA[Annerley News]]></dc:creator>
<guid isPermaLink="true">https://annerleynews.com.au/?page_id=24131</guid>
<description><![CDATA[
Could your work hang in the wards and waiting areas of Woolloongabba’s Princess Alexandra Hospital expansion, a project costing more than $748 million, if you have a link to the hospital?



Read: Dutton Park Research Precinct Gains Nearby Biomedical Manufacturing Capability



Registrations close at 2 p.m. AEST on Wednesday, 11 November 2026.



Walls that People Actually See&nbsp;



Photo Credit: Metro South Health/ Facebook



Think back to the last time you waited in a hospital. What was on the walls? Artworks from this process could appear in a longer list of spots than the ones above, including arrival areas, interview rooms, hallways, corridors and staff zones.&nbsp;



The call is open to many art forms, from photographs, textiles and framed prints to canvases, wall decals, and digital, light and sound pieces. Some works may need to be supplied as high-quality digital files. For artists with a personal tie to the hospital, these are spaces used by patients, families and staff.



What the Expansion Adds



The artwork call sits inside a much bigger build. Metro South Health lists extra inpatient beds, extended and renovated buildings, and new cancer and kidney disease treatment services.&nbsp;



The health service says the project will add 249 inpatient beds and 13 cancer treatment bays, and the structure was topped out in May 2026. The stated aim is to make services easier for the community to reach and to boost specialist and emergency care.&nbsp;



Who Can Register&nbsp;



Photo Credit: Metro South Health/ Facebook



Artists and collectives can both take part, as long as they can show a link to the PA Hospital and are ready to develop ideas with project teams. Queensland Health employees can’t register because of probity and conflict-of-interest rules. Applicants also need a current Australian Business Number, or ABN, or must be willing to apply for one. Registering is a first step, not a commission. Arts Queensland describes these registrations as the entry point to artwork commissions and acquisitions led by Health Infrastructure Queensland.&nbsp;



Read: Yeronga Riverfront Home Listed After 20 Years of Family Life




What to Send&nbsp;



Applicants complete the registration of interest response form, including its required declarations, and add a biography of up to 100 words about their connection to the hospital. A résumé of no more than two pages should show their ABN, experience and portfolio links, along with up to five images of past work. The form was updated on Oct. 26 because the date and time of the Artist Information Session changed, so check the latest version for the new details.



Email entries and questions to Jordan Cardenas, principal advisor procurement, at HIQProcurement@health.qld.gov.au. Entries that arrive late or leave out required items might not be assessed.



Published Date 31-October-2026
]]></description>
<content:encoded><![CDATA[
Could your work hang in the wards and waiting areas of Woolloongabba’s Princess Alexandra Hospital expansion, a project costing more than $748 million, if you have a link to the hospital?



Read: Dutton Park Research Precinct Gains Nearby Biomedical Manufacturing Capability



Registrations close at 2 p.m. AEST on Wednesday, 11 November 2026.



Walls that People Actually See&nbsp;



Photo Credit: Metro South Health/ Facebook



Think back to the last time you waited in a hospital. What was on the walls? Artworks from this process could appear in a longer list of spots than the ones above, including arrival areas, interview rooms, hallways, corridors and staff zones.&nbsp;



The call is open to many art forms, from photographs, textiles and framed prints to canvases, wall decals, and digital, light and sound pieces. Some works may need to be supplied as high-quality digital files. For artists with a personal tie to the hospital, these are spaces used by patients, families and staff.



What the Expansion Adds



The artwork call sits inside a much bigger build. Metro South Health lists extra inpatient beds, extended and renovated buildings, and new cancer and kidney disease treatment services.&nbsp;



The health service says the project will add 249 inpatient beds and 13 cancer treatment bays, and the structure was topped out in May 2026. The stated aim is to make services easier for the community to reach and to boost specialist and emergency care.&nbsp;



Who Can Register&nbsp;



Photo Credit: Metro South Health/ Facebook



Artists and collectives can both take part, as long as they can show a link to the PA Hospital and are ready to develop ideas with project teams. Queensland Health employees can’t register because of probity and conflict-of-interest rules. Applicants also need a current Australian Business Number, or ABN, or must be willing to apply for one. Registering is a first step, not a commission. Arts Queensland describes these registrations as the entry point to artwork commissions and acquisitions led by Health Infrastructure Queensland.&nbsp;



Read: Yeronga Riverfront Home Listed After 20 Years of Family Life




What to Send&nbsp;



Applicants complete the registration of interest response form, including its required declarations, and add a biography of up to 100 words about their connection to the hospital. A résumé of no more than two pages should show their ABN, experience and portfolio links, along with up to five images of past work. The form was updated on Oct. 26 because the date and time of the Artist Information Session changed, so check the latest version for the new details.



Email entries and questions to Jordan Cardenas, principal advisor procurement, at HIQProcurement@health.qld.gov.au. Entries that arrive late or leave out required items might not be assessed.



Published Date 31-October-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Yeronga Riverfront Home Listed After 20 Years of Family Life]]></title>
<link>https://annerleynews.com.au/yeronga-riverfront-home-listed-after-20-years</link>
<media:content url="https://annerleynews.com.au/wp-content/uploads/2026/10/FI-for-OMC-57-1.webp" medium="image"/>
<media:thumbnail url="https://annerleynews.com.au/wp-content/uploads/2026/10/FI-for-OMC-57-1.webp"/>
<enclosure url="https://annerleynews.com.au/wp-content/uploads/2026/10/FI-for-OMC-57-1.webp" length="189880" type="image/webp"/>
<pubDate>Fri, 30 Oct 2026 02:20:04 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[Lamberts Design and Construction]]></category>
<category><![CDATA[Yeronga]]></category>
<category><![CDATA[Yeronga property for sale]]></category>
<dc:creator><![CDATA[Annerley News]]></dc:creator>
<guid isPermaLink="true">https://annerleynews.com.au/?page_id=24120</guid>
<description><![CDATA[
A Yeronga riverfront home shaped by two decades of family life is on the market, with its custom-built fittings and adaptable floor plan offering a different perspective on a property designed around the people who live in it.







Read: The Award-Winning Yeronga Home Is Finally For Sale







Brooke and Spencer Lambert, owners of Brisbane business Lamberts Design and Construction, are selling their five-bedroom residence after living there for 20 years. The property occupies a 690-square-metre block fronting the Brisbane River, with views towards Indooroopilly Golf Course.



Photo credit: Place Ascot



The couple's construction background is reflected in several details throughout the house, including a stainless-steel bathtub made specifically for the home. The unusual fitting came about after they could not find a commercially available design that met their requirements.



A Home Adapted Over Time



Photo credit: Place Ascot



Rather than redesigning the entire house, the Lamberts retained its original layout while updating the kitchens and bathrooms over the years. Their approach allowed the property to evolve without a complete reworking of its existing spaces.



One significant addition was a second kitchen downstairs as their three children grew older. The extra facilities gave adult family members greater independence while keeping them within the same household. The separate living area has also accommodated visiting relatives.



The arrangement is a practical feature of a property with several living zones. It allows household members to spend time together while providing room for different routines and levels of privacy.



Living Across Two Levels



Photo credit: Place Ascot



The lower level is arranged around an open-plan living area, bar and casual lounge. Bi-fold doors connect this space to an outdoor deck overlooking the saltwater swimming pool and river.



Upstairs, the kitchen, dining and living areas form another central gathering space. The kitchen features a stone island and stainless-steel finishes, with access to a covered outdoor entertaining area fitted with a separate kitchen and barbecue.



Photo credit: Place Ascot



A suspended gallery walkway leads to the loft-style main bedroom, which includes a walk-in wardrobe, ensuite and private balcony. Four further bedrooms, a study or library, a family bathroom and a powder room complete the accommodation.



The property also has an infrared sauna, spa, air-conditioning, storage, water tanks and parking for two vehicles, according to the available listing information.



River Access 



The waterfront setting is a defining feature, with a deepwater pontoon and separate Jet Ski landing providing direct access to the Brisbane River. Gardens, a pool and outdoor entertaining areas extend the home's living spaces beyond its interiors.




  Property at a glance
  
    
      Address
      39 Instow Street, Yeronga
    
    
      Land size
      690 square metres
    
    
      Bedrooms
      5
    
    
      Bathrooms
      3
    
    
      Parking
      2 spaces
    
    
      Sales agents
      Josh Shanley and Jakob Morrison, Place Ascot
    
  
  
    
  
    

















]]></description>
<content:encoded><![CDATA[
A Yeronga riverfront home shaped by two decades of family life is on the market, with its custom-built fittings and adaptable floor plan offering a different perspective on a property designed around the people who live in it.







Read: The Award-Winning Yeronga Home Is Finally For Sale







Brooke and Spencer Lambert, owners of Brisbane business Lamberts Design and Construction, are selling their five-bedroom residence after living there for 20 years. The property occupies a 690-square-metre block fronting the Brisbane River, with views towards Indooroopilly Golf Course.



Photo credit: Place Ascot



The couple's construction background is reflected in several details throughout the house, including a stainless-steel bathtub made specifically for the home. The unusual fitting came about after they could not find a commercially available design that met their requirements.



A Home Adapted Over Time



Photo credit: Place Ascot



Rather than redesigning the entire house, the Lamberts retained its original layout while updating the kitchens and bathrooms over the years. Their approach allowed the property to evolve without a complete reworking of its existing spaces.



One significant addition was a second kitchen downstairs as their three children grew older. The extra facilities gave adult family members greater independence while keeping them within the same household. The separate living area has also accommodated visiting relatives.



The arrangement is a practical feature of a property with several living zones. It allows household members to spend time together while providing room for different routines and levels of privacy.



Living Across Two Levels



Photo credit: Place Ascot



The lower level is arranged around an open-plan living area, bar and casual lounge. Bi-fold doors connect this space to an outdoor deck overlooking the saltwater swimming pool and river.



Upstairs, the kitchen, dining and living areas form another central gathering space. The kitchen features a stone island and stainless-steel finishes, with access to a covered outdoor entertaining area fitted with a separate kitchen and barbecue.



Photo credit: Place Ascot



A suspended gallery walkway leads to the loft-style main bedroom, which includes a walk-in wardrobe, ensuite and private balcony. Four further bedrooms, a study or library, a family bathroom and a powder room complete the accommodation.



The property also has an infrared sauna, spa, air-conditioning, storage, water tanks and parking for two vehicles, according to the available listing information.



River Access 



The waterfront setting is a defining feature, with a deepwater pontoon and separate Jet Ski landing providing direct access to the Brisbane River. Gardens, a pool and outdoor entertaining areas extend the home's living spaces beyond its interiors.




  Property at a glance
  
    
      Address
      39 Instow Street, Yeronga
    
    
      Land size
      690 square metres
    
    
      Bedrooms
      5
    
    
      Bathrooms
      3
    
    
      Parking
      2 spaces
    
    
      Sales agents
      Josh Shanley and Jakob Morrison, Place Ascot
    
  
  
    
  
    

















]]></content:encoded>
</item><item>
<title><![CDATA[Dutton Park Research Precinct Gains Nearby Biomedical Manufacturing Capability]]></title>
<link>https://annerleynews.com.au/dutton-park-research-precinct-gains-nearby-biomedical-manufacturing-capability</link>
<media:content url="https://annerleynews.com.au/wp-content/uploads/2026/10/Dutton-Park-1.png" medium="image"/>
<media:thumbnail url="https://annerleynews.com.au/wp-content/uploads/2026/10/Dutton-Park-1.png"/>
<enclosure url="https://annerleynews.com.au/wp-content/uploads/2026/10/Dutton-Park-1.png" length="1600051" type="image/png"/>
<pubDate>Thu, 29 Oct 2026 23:26:02 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[biomedical manufacturing]]></category>
<category><![CDATA[Boggo Road Innovation Junction]]></category>
<category><![CDATA[Boggo Road Station]]></category>
<category><![CDATA[Brisbane biotech]]></category>
<category><![CDATA[dutton park]]></category>
<category><![CDATA[Ecosciences Precinct]]></category>
<category><![CDATA[ENTRI]]></category>
<category><![CDATA[Translational Research Institute]]></category>
<category><![CDATA[UQ Dutton Park]]></category>
<category><![CDATA[Woolloongabba]]></category>
<dc:creator><![CDATA[Annerley News]]></dc:creator>
<guid isPermaLink="true">https://annerleynews.com.au/?page_id=24112</guid>
<description><![CDATA[
A $100 million-plus manufacturing facility in Woolloongabba gives Dutton Park’s research precinct a local place to make experimental treatments to clinical standards, filling a gap TRI calls critical.



Read: Yeronga Hosts Inaugural Aegean Cup Celebrating Football and Greek Culture



Photo Credit: Translation Research Institute/ Facebook



The Translational Research Institute (TRI) officially opened the facility, called ENTRI, on 20 October 2026. It stands at 37 Kent Street, Woolloongabba, rather than in Dutton Park, but it sits inside the Boggo Road Innovation Junction (BRIJ), where the Queensland Government places ENTRI in Woolloongabba. The junction is a health and science area that spans both suburbs.&nbsp;



Inside Dutton Park itself, the Ecosciences Precinct at 41 Boggo Road sits beside the heritage-listed Boggo Road Gaol and within a wider health, research and hospital area. The precinct names health, biomedical and environmental sciences as its core fields. Boggo Road Village, a retail centre with a supermarket and cafes, is also counted as part of the junction.&nbsp;



The University of Queensland (UQ) designated the site of its former pharmacy school next to Princess Alexandra Hospital as its fourth campus, UQ Dutton Park, in 2023. The campus focuses on health and biotechnology research and teaching. UQ says part of its site was made available for the manufacturing project that became ENTRI.&nbsp;



Photo Credit: Translation Research Institute/ Facebook



Who else shares the precinct? The collaboration group lists Princess Alexandra Hospital with Metro South Health, UQ, TRI, CSIRO and Economic Development Queensland. TRI is its own research institute and houses UQ’s Frazer Institute, so the organisations overlap without being one body.&nbsp;



ENTRI targets what TRI describes as a critical capability gap: access to cGMP clean rooms for companies making medicines. Those rooms follow strict rules, which means air, equipment and staff routines are tightly controlled so each batch comes out safe and consistent. The building adds 7,000 square metres over four floors to TRI’s footprint.&nbsp;



Companies using the space can control their own production schedules while ENTRI staff provide technical support. TRI’s project brochure lists biologics, mRNA products, cell therapies and fill-and-finish work among the types of manufacturing planned. The investment exceeds $100 million, funded by the Queensland Government and TRI with Australian Government support.&nbsp;



Photo Credit: Translation Research Institute/ Facebook



Pharmaceutical company Sanofi was named ENTRI’s first tenant in November 2025, as part of its Translational Science Hub. New Zealand-based BioOra has a planned automated suite for CAR T-cell manufacturing, a type of cell therapy, backed by $7.7 million from the Queensland Government. That suite is a proposal for now, not an operating production line.&nbsp;



TRI has also announced AdvanCell as a new ENTRI partner. The Brisbane company develops radiopharmaceuticals, and its lead prostate cancer therapy is still being tested in clinical trials.



Read: Two-Hour Ambulance Delay Ends in Death Near Princess Alexandra Hospital



Cross River Rail’s new underground Boggo Road station is a separate project from ENTRI. The authority forecasts more than 22,000 weekday commuters by 2036 and says the station will connect with UQ and the CBD. Utility works for the station bring short road closures on Railway Terrace and Kent Street until late 2026. Dutton Park train station also remains open during major upgrade works.&nbsp;



The next dated milestone belongs to BioOra. The Queensland Government says its suite at ENTRI is due to be operating by 2028, with 72 jobs tied to that investment at the Woolloongabba site.



Published Date 30-October-2026




]]></description>
<content:encoded><![CDATA[
A $100 million-plus manufacturing facility in Woolloongabba gives Dutton Park’s research precinct a local place to make experimental treatments to clinical standards, filling a gap TRI calls critical.



Read: Yeronga Hosts Inaugural Aegean Cup Celebrating Football and Greek Culture



Photo Credit: Translation Research Institute/ Facebook



The Translational Research Institute (TRI) officially opened the facility, called ENTRI, on 20 October 2026. It stands at 37 Kent Street, Woolloongabba, rather than in Dutton Park, but it sits inside the Boggo Road Innovation Junction (BRIJ), where the Queensland Government places ENTRI in Woolloongabba. The junction is a health and science area that spans both suburbs.&nbsp;



Inside Dutton Park itself, the Ecosciences Precinct at 41 Boggo Road sits beside the heritage-listed Boggo Road Gaol and within a wider health, research and hospital area. The precinct names health, biomedical and environmental sciences as its core fields. Boggo Road Village, a retail centre with a supermarket and cafes, is also counted as part of the junction.&nbsp;



The University of Queensland (UQ) designated the site of its former pharmacy school next to Princess Alexandra Hospital as its fourth campus, UQ Dutton Park, in 2023. The campus focuses on health and biotechnology research and teaching. UQ says part of its site was made available for the manufacturing project that became ENTRI.&nbsp;



Photo Credit: Translation Research Institute/ Facebook



Who else shares the precinct? The collaboration group lists Princess Alexandra Hospital with Metro South Health, UQ, TRI, CSIRO and Economic Development Queensland. TRI is its own research institute and houses UQ’s Frazer Institute, so the organisations overlap without being one body.&nbsp;



ENTRI targets what TRI describes as a critical capability gap: access to cGMP clean rooms for companies making medicines. Those rooms follow strict rules, which means air, equipment and staff routines are tightly controlled so each batch comes out safe and consistent. The building adds 7,000 square metres over four floors to TRI’s footprint.&nbsp;



Companies using the space can control their own production schedules while ENTRI staff provide technical support. TRI’s project brochure lists biologics, mRNA products, cell therapies and fill-and-finish work among the types of manufacturing planned. The investment exceeds $100 million, funded by the Queensland Government and TRI with Australian Government support.&nbsp;



Photo Credit: Translation Research Institute/ Facebook



Pharmaceutical company Sanofi was named ENTRI’s first tenant in November 2025, as part of its Translational Science Hub. New Zealand-based BioOra has a planned automated suite for CAR T-cell manufacturing, a type of cell therapy, backed by $7.7 million from the Queensland Government. That suite is a proposal for now, not an operating production line.&nbsp;



TRI has also announced AdvanCell as a new ENTRI partner. The Brisbane company develops radiopharmaceuticals, and its lead prostate cancer therapy is still being tested in clinical trials.



Read: Two-Hour Ambulance Delay Ends in Death Near Princess Alexandra Hospital



Cross River Rail’s new underground Boggo Road station is a separate project from ENTRI. The authority forecasts more than 22,000 weekday commuters by 2036 and says the station will connect with UQ and the CBD. Utility works for the station bring short road closures on Railway Terrace and Kent Street until late 2026. Dutton Park train station also remains open during major upgrade works.&nbsp;



The next dated milestone belongs to BioOra. The Queensland Government says its suite at ENTRI is due to be operating by 2028, with 72 jobs tied to that investment at the Woolloongabba site.



Published Date 30-October-2026




]]></content:encoded>
</item><item>
<title><![CDATA[Baby Rhyme Time Brings a Little Rhythm to Brisbane’s Libraries]]></title>
<link>https://annerleynews.com.au/baby-rhyme-time-brings-a-little-rhythm-to-brisbanes-libraries/baby-rhyme-time-brings-a-little-rhythm-to-brisbanes-libraries</link>
<media:content url="https://annerleynews.com.au/wp-content/uploads/2026/10/BSON_First5Forever-1.jpg" medium="image"/>
<media:thumbnail url="https://annerleynews.com.au/wp-content/uploads/2026/10/BSON_First5Forever-1.jpg"/>
<enclosure url="https://annerleynews.com.au/wp-content/uploads/2026/10/BSON_First5Forever-1.jpg" length="82202" type="image/jpeg"/>
<pubDate>Wed, 28 Oct 2026 06:36:58 +0000</pubDate>
<dc:creator><![CDATA[Annerley News]]></dc:creator>
<guid isPermaLink="true">https://annerleynews.com.au/baby-rhyme-time-brings-a-little-rhythm-to-brisbanes-libraries/</guid>
<description><![CDATA[


Baby rhyme time is one of those small library events that quietly earns its keep. It is free, simple and aimed at babies up to one year old. The November schedule shows it at Indooroopilly, with the wider run also reaching libraries across Brisbane. That makes it an easy one for local families to actually use.



A quick outing that feels close to home 



The event page keeps things plain. Families can meet other parents and babies for singing, clapping and dancing. There is no booking needed, which keeps the whole thing easy. At the same time, places are limited, so a session can close if it fills up.



That balance suits a library pretty well. It is open, but not chaotic. It is friendly, but still orderly. For parents juggling naps, bottles and everything else, that sort of setup matters more than people might think. 



The bigger schedule gives the program a wider reach. Alongside Indooroopilly, it also shows sessions at places like Holland Park, Chermside, Carina, Banyo, Nundah and Zillmere. So this is not just one nice little event in one suburb. It is a regular community rhythm across several parts of the city. 



The kind of noise libraries can welcome 



Baby rhyme time works because it is built for the early months. The event listing says the songs and action rhymes help nurture pre-literacy, communication, language and social skills. That sounds formal, but the idea behind it is pretty simple. Babies hear words, watch faces and start getting used to the sound of language. 



That is where libraries come into their own. They are already calm places. They already belong to the community. So a session like this feels natural there, not bolted on. 



And honestly, that is part of the appeal. Parents do not need a grand plan for the morning. They just need something local, useful and low-fuss. Baby rhyme time gives them that. 



A small session worth repeating 



First 5 Forever backs the program, with the State Library of Queensland coordinating it in partnership with local government. That gives the session a proper public purpose, but the benefit is still felt at the local level. One suburb gets a room full of songs. Another suburb gets the same thing on a different day. 



That is the charm of it. Baby rhyme time is not trying to be bigger than it needs to be. It just gives babies, parents and carers a warm little place to start. In a city as busy as Brisbane, that feels worth keeping on the calendar.




  
    
      Place
      Date
      Time
    
  
  
    Annerley Library11/6/20269:15AM - 9:45 AM
    Annerley Library11/13/20269:15AM - 9:45 AM
    Annerley Library11/20/20269:15AM - 9:45 AM
    Annerley Library11/27/20269:15AM - 9:45 AM

    Ashgrove Library11/4/20269:30AM - 10:00 AM
    Ashgrove Library11/11/20269:30AM - 10:00 AM
    Ashgrove Library11/18/20269:30AM - 10:00 AM
    Ashgrove Library11/25/20269:30AM - 10:00 AM

    Banyo Library11/5/202611:30AM - 12:00PM
    Banyo Library11/12/202611:30AM - 12:00PM
    Banyo Library11/19/202611:30AM - 12:00PM
    Banyo Library11/26/202611:30AM - 12:00PM

    Bracken Ridge Library11/6/202610:00AM - 10:30 AM
    Bracken Ridge Library11/13/202610:00AM - 10:30 AM
    Bracken Ridge Library11/20/202610:00AM - 10:30 AM
    Bracken Ridge Library11/27/202610:00AM - 10:30 AM

    Brisbane Square Library11/5/202611:30AM - 12:00PM
    Brisbane Square Library11/12/202611:30AM - 12:00PM
    Brisbane Square Library11/19/202611:30AM - 12:00PM
    Brisbane Square Library11/26/202611:30AM - 12:00PM

    Bulimba Library11/5/202610:00AM - 10:30 AM
    Bulimba Library11/12/202610:00AM - 10:30 AM
    Bulimba Library11/19/202610:00AM - 10:30 AM
    Bulimba Library11/26/202610:00AM - 10:30 AM

    Carina Library11/2/202610:30AM- 11:00AM
    Carina Library11/9/202610:30AM- 11:00AM
    Carina Library11/16/202610:30AM- 11:00AM
    Carina Library11/23/202610:30AM- 11:00AM
    Carina Library11/30/202610:30AM- 11:00AM

    Carindale Library11/3/202610:45AM - 11:15AM
    Carindale Library11/4/202610:30AM- 11:00AM
    Carindale Library11/10/202610:45AM - 11:15AM
    Carindale Library11/11/202610:00AM - 10:30 AM
    Carindale Library11/17/202610:45AM - 11:15AM
    Carindale Library11/18/202610:00AM - 10:30 AM
    Carindale Library11/24/202610:45AM - 11:15AM
    Carindale Library11/25/202610:00AM - 10:30 AM

    Chermside Library11/3/202610:00AM - 10:30 AM
    Chermside Library11/3/202611:00AM - 11:30 AM
    Chermside Library11/4/202611:00AM - 11:30 AM
    Chermside Library11/10/202610:00AM - 10:30 AM
    Chermside Library11/10/202611:00AM - 11:30 AM
    Chermside Library11/11/202611:00AM - 11:30 AM
    Chermside Library11/17/202610:00AM - 10:30 AM
    Chermside Library11/17/202611:00AM - 11:30 AM
    Chermside Library11/18/202611:00AM - 11:30 AM
    Chermside Library11/24/202610:00AM - 10:30 AM
    Chermside Library11/24/202611:00AM - 11:30 AM
    Chermside Library11/25/202611:00AM - 11:30 AM

    Coopers Plain Library11/5/202610:00AM - 10:30 AM
    Coopers Plain Library11/12/202610:00AM - 10:30 AM
    Coopers Plain Library11/19/202610:00AM - 10:30 AM
    Coopers Plain Library11/26/202610:00AM - 10:30 AM

    Corinda Library11/6/20269:15AM - 9:45 AM
    Corinda Library11/13/20269:15AM - 9:45 AM
    Corinda Library11/20/20269:15AM - 9:45 AM
    Corinda Library11/27/20269:15AM - 9:45 AM

    Everton Park LIbrary11/3/202611:00AM - 11:30 AM
    Everton Park LIbrary11/10/202611:00AM - 11:30 AM
    Everton Park LIbrary11/17/202611:00AM - 11:30 AM
    Everton Park LIbrary11/24/202611:00AM - 11:30 AM

    Fairfield Library11/4/20269:30AM - 10:00 AM
    Fairfield Library11/11/20269:30AM - 10:00 AM
    Fairfield Library11/18/20269:30AM - 10:00 AM
    Fairfield Library11/25/20269:30AM - 10:00 AM

    Garden City Library11/2/202610:30AM- 11:00AM
    Garden City Library11/4/202610:30AM- 11:00AM
    Garden City Library11/9/202610:30AM- 11:00AM
    Garden City Library11/11/202610:30AM- 11:00AM
    Garden City Library11/16/202610:30AM- 11:00AM
    Garden City Library11/18/202610:30AM- 11:00AM
    Garden City Library11/23/202610:30AM- 11:00AM
    Garden City Library11/25/202610:30AM- 11:00AM
    Garden City Library11/30/202610:30AM- 11:00AM

    Grange Library11/5/202611:15AM - 11:45AM
    Grange Library11/12/202611:15AM - 11:45AM
    Grange Library11/19/202611:15AM - 11:45AM
    Grange Library11/26/202611:15AM - 11:45AM

    Holland Park Library11/4/20262:00PM - 2:30PM
    Holland Park Library11/11/20262:00PM - 2:30PM
    Holland Park Library11/18/20262:00PM - 2:30PM
    Holland Park Library11/25/20262:00PM - 2:30PM

    Inala Library11/3/20262:00PM - 2:30PM
    Inala Library11/10/20262:00PM - 2:30PM
    Inala Library11/17/20262:00PM - 2:30PM
    Inala Library11/24/20262:00PM - 2:30PM

    Indooroopilly Library11/2/202610:15AM - 10:45AM
    Indooroopilly Library11/6/202610:15AM - 10:45AM
    Indooroopilly Library11/9/202610:15AM - 10:45AM
    Indooroopilly Library11/13/202610:15AM - 10:45AM
    Indooroopilly Library11/16/202610:15AM - 10:45AM
    Indooroopilly Library11/20/202610:15AM - 10:45AM
    Indooroopilly Library11/23/202610:15AM - 10:45AM
    Indooroopilly Library11/27/202610:15AM - 10:45AM
    Indooroopilly Library11/30/202610:15AM - 10:45AM

    Kenmore Library11/4/202610:30AM- 11:00AM
    Kenmore Library11/11/202610:30AM- 11:00AM
    Kenmore Library11/18/202610:30AM- 11:00AM
    Kenmore Library11/25/202610:30AM- 11:00AM

    Mitchelton Library11/6/202611:00AM - 11:30 AM
    Mitchelton Library11/13/202611:00AM - 11:30 AM
    Mitchelton Library11/20/202611:00AM - 11:30 AM
    Mitchelton Library11/27/202611:00AM - 11:30 AM

    Mount Gravatt Library11/6/20269:30AM - 10:00 AM
    Mount Gravatt Library11/13/20269:30AM - 10:00 AM
    Mount Gravatt Library11/20/20269:30AM - 10:00 AM
    Mount Gravatt Library11/27/20269:30AM - 10:00 AM

    Mt Ommaney Library11/4/20269:30AM - 10:00 AM
    Mt Ommaney Library11/11/20269:30AM - 10:00 AM
    Mt Ommaney Library11/18/20269:30AM - 10:00 AM
    Mt Ommaney Library11/25/20269:30AM - 10:00 AM

    New Farm Library11/4/202611:00AM - 11:30 AM
    New Farm Library11/11/202611:00AM - 11:30 AM
    New Farm Library11/18/202611:00AM - 11:30 AM
    New Farm Library11/25/202611:00AM - 11:30 AM

    Nundah Library11/5/20269:30AM - 10:00 AM
    Nundah Library11/12/20269:30AM - 10:00 AM
    Nundah Library11/19/20269:30AM - 10:00 AM
    Nundah Library11/26/20269:30AM - 10:00 AM

    Sandgate Library11/6/202610:00AM - 10:30 AM
    Sandgate Library11/13/202610:00AM - 10:30 AM
    Sandgate Library11/20/202610:00AM - 10:30 AM
    Sandgate Library11/27/202610:00AM - 10:30 AM

    Stones Corner Library11/6/20269:30AM - 10:00 AM
    Stones Corner Library11/13/20269:30AM - 10:00 AM
    Stones Corner Library11/20/20269:30AM - 10:00 AM
    Stones Corner Library11/27/20269:30AM - 10:00 AM

    Sunnybank Hills Library11/2/202610:30AM- 11:00AM
    Sunnybank Hills Library11/9/202610:30AM- 11:00AM
    Sunnybank Hills Library11/16/202610:30AM- 11:00AM
    Sunnybank Hills Library11/23/202610:30AM- 11:00AM
    Sunnybank Hills Library11/30/202610:30AM- 11:00AM

    Toowong Library11/3/202611:30AM - 12:00PM
    Toowong Library11/10/202611:30AM - 12:00PM
    Toowong Library11/17/202611:30AM - 12:00PM
    Toowong Library11/24/202611:30AM - 12:00PM

    West End Library11/4/20269:15AM - 9:45 AM
    West End Library11/11/20269:15AM - 9:45 AM
    West End Library11/18/20269:15AM - 9:45 AM
    West End Library11/25/20269:15AM - 9:45 AM

    Wynnum Library11/6/20269:15AM - 9:45 AM
    Wynnum Library11/13/20269:15AM - 9:45 AM
    Wynnum Library11/20/20269:15AM - 9:45 AM
    Wynnum Library11/27/20269:15AM - 9:45 AM

    Zillmere Library11/5/202610:30AM- 11:00AM
    Zillmere Library11/12/202610:30AM- 11:00AM
    Zillmere Library11/19/202610:30AM- 11:00AM
    Zillmere Library11/26/202610:30AM- 11:00AM
  




Published 28-October-2026
]]></description>
<content:encoded><![CDATA[


Baby rhyme time is one of those small library events that quietly earns its keep. It is free, simple and aimed at babies up to one year old. The November schedule shows it at Indooroopilly, with the wider run also reaching libraries across Brisbane. That makes it an easy one for local families to actually use.



A quick outing that feels close to home 



The event page keeps things plain. Families can meet other parents and babies for singing, clapping and dancing. There is no booking needed, which keeps the whole thing easy. At the same time, places are limited, so a session can close if it fills up.



That balance suits a library pretty well. It is open, but not chaotic. It is friendly, but still orderly. For parents juggling naps, bottles and everything else, that sort of setup matters more than people might think. 



The bigger schedule gives the program a wider reach. Alongside Indooroopilly, it also shows sessions at places like Holland Park, Chermside, Carina, Banyo, Nundah and Zillmere. So this is not just one nice little event in one suburb. It is a regular community rhythm across several parts of the city. 



The kind of noise libraries can welcome 



Baby rhyme time works because it is built for the early months. The event listing says the songs and action rhymes help nurture pre-literacy, communication, language and social skills. That sounds formal, but the idea behind it is pretty simple. Babies hear words, watch faces and start getting used to the sound of language. 



That is where libraries come into their own. They are already calm places. They already belong to the community. So a session like this feels natural there, not bolted on. 



And honestly, that is part of the appeal. Parents do not need a grand plan for the morning. They just need something local, useful and low-fuss. Baby rhyme time gives them that. 



A small session worth repeating 



First 5 Forever backs the program, with the State Library of Queensland coordinating it in partnership with local government. That gives the session a proper public purpose, but the benefit is still felt at the local level. One suburb gets a room full of songs. Another suburb gets the same thing on a different day. 



That is the charm of it. Baby rhyme time is not trying to be bigger than it needs to be. It just gives babies, parents and carers a warm little place to start. In a city as busy as Brisbane, that feels worth keeping on the calendar.




  
    
      Place
      Date
      Time
    
  
  
    Annerley Library11/6/20269:15AM - 9:45 AM
    Annerley Library11/13/20269:15AM - 9:45 AM
    Annerley Library11/20/20269:15AM - 9:45 AM
    Annerley Library11/27/20269:15AM - 9:45 AM

    Ashgrove Library11/4/20269:30AM - 10:00 AM
    Ashgrove Library11/11/20269:30AM - 10:00 AM
    Ashgrove Library11/18/20269:30AM - 10:00 AM
    Ashgrove Library11/25/20269:30AM - 10:00 AM

    Banyo Library11/5/202611:30AM - 12:00PM
    Banyo Library11/12/202611:30AM - 12:00PM
    Banyo Library11/19/202611:30AM - 12:00PM
    Banyo Library11/26/202611:30AM - 12:00PM

    Bracken Ridge Library11/6/202610:00AM - 10:30 AM
    Bracken Ridge Library11/13/202610:00AM - 10:30 AM
    Bracken Ridge Library11/20/202610:00AM - 10:30 AM
    Bracken Ridge Library11/27/202610:00AM - 10:30 AM

    Brisbane Square Library11/5/202611:30AM - 12:00PM
    Brisbane Square Library11/12/202611:30AM - 12:00PM
    Brisbane Square Library11/19/202611:30AM - 12:00PM
    Brisbane Square Library11/26/202611:30AM - 12:00PM

    Bulimba Library11/5/202610:00AM - 10:30 AM
    Bulimba Library11/12/202610:00AM - 10:30 AM
    Bulimba Library11/19/202610:00AM - 10:30 AM
    Bulimba Library11/26/202610:00AM - 10:30 AM

    Carina Library11/2/202610:30AM- 11:00AM
    Carina Library11/9/202610:30AM- 11:00AM
    Carina Library11/16/202610:30AM- 11:00AM
    Carina Library11/23/202610:30AM- 11:00AM
    Carina Library11/30/202610:30AM- 11:00AM

    Carindale Library11/3/202610:45AM - 11:15AM
    Carindale Library11/4/202610:30AM- 11:00AM
    Carindale Library11/10/202610:45AM - 11:15AM
    Carindale Library11/11/202610:00AM - 10:30 AM
    Carindale Library11/17/202610:45AM - 11:15AM
    Carindale Library11/18/202610:00AM - 10:30 AM
    Carindale Library11/24/202610:45AM - 11:15AM
    Carindale Library11/25/202610:00AM - 10:30 AM

    Chermside Library11/3/202610:00AM - 10:30 AM
    Chermside Library11/3/202611:00AM - 11:30 AM
    Chermside Library11/4/202611:00AM - 11:30 AM
    Chermside Library11/10/202610:00AM - 10:30 AM
    Chermside Library11/10/202611:00AM - 11:30 AM
    Chermside Library11/11/202611:00AM - 11:30 AM
    Chermside Library11/17/202610:00AM - 10:30 AM
    Chermside Library11/17/202611:00AM - 11:30 AM
    Chermside Library11/18/202611:00AM - 11:30 AM
    Chermside Library11/24/202610:00AM - 10:30 AM
    Chermside Library11/24/202611:00AM - 11:30 AM
    Chermside Library11/25/202611:00AM - 11:30 AM

    Coopers Plain Library11/5/202610:00AM - 10:30 AM
    Coopers Plain Library11/12/202610:00AM - 10:30 AM
    Coopers Plain Library11/19/202610:00AM - 10:30 AM
    Coopers Plain Library11/26/202610:00AM - 10:30 AM

    Corinda Library11/6/20269:15AM - 9:45 AM
    Corinda Library11/13/20269:15AM - 9:45 AM
    Corinda Library11/20/20269:15AM - 9:45 AM
    Corinda Library11/27/20269:15AM - 9:45 AM

    Everton Park LIbrary11/3/202611:00AM - 11:30 AM
    Everton Park LIbrary11/10/202611:00AM - 11:30 AM
    Everton Park LIbrary11/17/202611:00AM - 11:30 AM
    Everton Park LIbrary11/24/202611:00AM - 11:30 AM

    Fairfield Library11/4/20269:30AM - 10:00 AM
    Fairfield Library11/11/20269:30AM - 10:00 AM
    Fairfield Library11/18/20269:30AM - 10:00 AM
    Fairfield Library11/25/20269:30AM - 10:00 AM

    Garden City Library11/2/202610:30AM- 11:00AM
    Garden City Library11/4/202610:30AM- 11:00AM
    Garden City Library11/9/202610:30AM- 11:00AM
    Garden City Library11/11/202610:30AM- 11:00AM
    Garden City Library11/16/202610:30AM- 11:00AM
    Garden City Library11/18/202610:30AM- 11:00AM
    Garden City Library11/23/202610:30AM- 11:00AM
    Garden City Library11/25/202610:30AM- 11:00AM
    Garden City Library11/30/202610:30AM- 11:00AM

    Grange Library11/5/202611:15AM - 11:45AM
    Grange Library11/12/202611:15AM - 11:45AM
    Grange Library11/19/202611:15AM - 11:45AM
    Grange Library11/26/202611:15AM - 11:45AM

    Holland Park Library11/4/20262:00PM - 2:30PM
    Holland Park Library11/11/20262:00PM - 2:30PM
    Holland Park Library11/18/20262:00PM - 2:30PM
    Holland Park Library11/25/20262:00PM - 2:30PM

    Inala Library11/3/20262:00PM - 2:30PM
    Inala Library11/10/20262:00PM - 2:30PM
    Inala Library11/17/20262:00PM - 2:30PM
    Inala Library11/24/20262:00PM - 2:30PM

    Indooroopilly Library11/2/202610:15AM - 10:45AM
    Indooroopilly Library11/6/202610:15AM - 10:45AM
    Indooroopilly Library11/9/202610:15AM - 10:45AM
    Indooroopilly Library11/13/202610:15AM - 10:45AM
    Indooroopilly Library11/16/202610:15AM - 10:45AM
    Indooroopilly Library11/20/202610:15AM - 10:45AM
    Indooroopilly Library11/23/202610:15AM - 10:45AM
    Indooroopilly Library11/27/202610:15AM - 10:45AM
    Indooroopilly Library11/30/202610:15AM - 10:45AM

    Kenmore Library11/4/202610:30AM- 11:00AM
    Kenmore Library11/11/202610:30AM- 11:00AM
    Kenmore Library11/18/202610:30AM- 11:00AM
    Kenmore Library11/25/202610:30AM- 11:00AM

    Mitchelton Library11/6/202611:00AM - 11:30 AM
    Mitchelton Library11/13/202611:00AM - 11:30 AM
    Mitchelton Library11/20/202611:00AM - 11:30 AM
    Mitchelton Library11/27/202611:00AM - 11:30 AM

    Mount Gravatt Library11/6/20269:30AM - 10:00 AM
    Mount Gravatt Library11/13/20269:30AM - 10:00 AM
    Mount Gravatt Library11/20/20269:30AM - 10:00 AM
    Mount Gravatt Library11/27/20269:30AM - 10:00 AM

    Mt Ommaney Library11/4/20269:30AM - 10:00 AM
    Mt Ommaney Library11/11/20269:30AM - 10:00 AM
    Mt Ommaney Library11/18/20269:30AM - 10:00 AM
    Mt Ommaney Library11/25/20269:30AM - 10:00 AM

    New Farm Library11/4/202611:00AM - 11:30 AM
    New Farm Library11/11/202611:00AM - 11:30 AM
    New Farm Library11/18/202611:00AM - 11:30 AM
    New Farm Library11/25/202611:00AM - 11:30 AM

    Nundah Library11/5/20269:30AM - 10:00 AM
    Nundah Library11/12/20269:30AM - 10:00 AM
    Nundah Library11/19/20269:30AM - 10:00 AM
    Nundah Library11/26/20269:30AM - 10:00 AM

    Sandgate Library11/6/202610:00AM - 10:30 AM
    Sandgate Library11/13/202610:00AM - 10:30 AM
    Sandgate Library11/20/202610:00AM - 10:30 AM
    Sandgate Library11/27/202610:00AM - 10:30 AM

    Stones Corner Library11/6/20269:30AM - 10:00 AM
    Stones Corner Library11/13/20269:30AM - 10:00 AM
    Stones Corner Library11/20/20269:30AM - 10:00 AM
    Stones Corner Library11/27/20269:30AM - 10:00 AM

    Sunnybank Hills Library11/2/202610:30AM- 11:00AM
    Sunnybank Hills Library11/9/202610:30AM- 11:00AM
    Sunnybank Hills Library11/16/202610:30AM- 11:00AM
    Sunnybank Hills Library11/23/202610:30AM- 11:00AM
    Sunnybank Hills Library11/30/202610:30AM- 11:00AM

    Toowong Library11/3/202611:30AM - 12:00PM
    Toowong Library11/10/202611:30AM - 12:00PM
    Toowong Library11/17/202611:30AM - 12:00PM
    Toowong Library11/24/202611:30AM - 12:00PM

    West End Library11/4/20269:15AM - 9:45 AM
    West End Library11/11/20269:15AM - 9:45 AM
    West End Library11/18/20269:15AM - 9:45 AM
    West End Library11/25/20269:15AM - 9:45 AM

    Wynnum Library11/6/20269:15AM - 9:45 AM
    Wynnum Library11/13/20269:15AM - 9:45 AM
    Wynnum Library11/20/20269:15AM - 9:45 AM
    Wynnum Library11/27/20269:15AM - 9:45 AM

    Zillmere Library11/5/202610:30AM- 11:00AM
    Zillmere Library11/12/202610:30AM- 11:00AM
    Zillmere Library11/19/202610:30AM- 11:00AM
    Zillmere Library11/26/202610:30AM- 11:00AM
  




Published 28-October-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Brisbane Metro Expansion Survey Opens as Residents Asked About Local Transport Problems]]></title>
<link>https://annerleynews.com.au/brisbane-metro-expansion-survey-opens-as-residents-asked-about-local-transport-problems/brisbane-metro-expansion-survey-opens-as-residents-asked-about-local-transport-problems</link>
<media:content url="https://annerleynews.com.au/wp-content/uploads/2026/10/Brisbane-Metro-FI.png" medium="image"/>
<media:thumbnail url="https://annerleynews.com.au/wp-content/uploads/2026/10/Brisbane-Metro-FI.png"/>
<enclosure url="https://annerleynews.com.au/wp-content/uploads/2026/10/Brisbane-Metro-FI.png" length="1526806" type="image/png"/>
<pubDate>Wed, 28 Oct 2026 00:13:00 +0000</pubDate>
<dc:creator><![CDATA[Annerley News]]></dc:creator>
<guid isPermaLink="true">https://annerleynews.com.au/brisbane-metro-expansion-survey-opens-as-residents-asked-about-local-transport-problems/</guid>
<description><![CDATA[


Brisbane residents are being invited to share their public transport concerns and suggest improvements as community consultation begins on proposed Metro expansions across the city's northern, eastern, southern and airport corridors.



Submissions close on Sunday, 13 December 2026, giving commuters an opportunity to describe difficulties with existing services and suggest improvements. Their feedback will help inform a business case examining how Brisbane Metro could reach more suburbs.



Four corridors bring different transport questions



The proposed Northern Metro would connect the CBD with Carseldine, extending services through Lutwyche, Kedron, Chermside and Aspley. Gympie Road has been identified as a potential corridor, raising questions about how dedicated bus infrastructure could improve journeys along one of Brisbane's major northern transport routes.



For residents in these suburbs, the consultation provides an opportunity to describe existing problems involving bus connections, journey reliability and access to public transport. Final station locations and the infrastructure needed for a northern extension remain undecided.



The Eastern Metro proposal would connect central Brisbane with Capalaba through the eastern suburbs, with Old Cleveland Road identified as a potential route. Commuters travelling through areas including Coorparoo could provide feedback about existing services, transfers and difficulties encountered during their journeys.



South of the city, the proposed Southern Metro would connect the CBD with Springwood, complementing the South East Busway extension and linking with the existing M1 service at Eight Mile Plains busway station.



The fourth corridor would create express Metro connections between Brisbane Airport's domestic and international terminals and the CBD. Planning will examine how those services could fit into the wider public transport network.



All four corridors remain proposals, with their potential alignments and infrastructure needs to be examined through the business case.



Photo Credit: BCC



Population growth adds pressure to existing routes



Council forecasts substantial population growth along the three residential corridors over the next 20 years.



Its projections indicate increases of 60 per cent along the CBD-to-Carseldine corridor, 29 per cent towards Capalaba and 96 per cent towards Springwood. Approximately 88,000 additional residents are expected in areas surrounding those corridors.



Brisbane's latest expansion proposals also revisit ambitions from the South East Queensland Integrated Regional Transport Plan developed in the 1990s. The earlier plan proposed approximately 75 kilometres of busways, but only about 25 kilometres were ultimately built.



Infrastructure Australia has identified the Metro expansion as an early-stage investment proposal that could improve public transport capacity, interchange connections and service reliability. Potential benefits remain subject to further planning and assessment.



Council wants to hear where journeys fall short



The consultation focuses on residents' current travel experiences and suggestions for improving bus services along the proposed corridors, rather than asking them to comment on completed designs.



Issues such as unreliable travel times, inconvenient transfers, access to stops and gaps in service coverage could be raised by residents. Council has not indicated that participants will be able to vote on final station locations or select specific route alignments.



The consultation follows the introduction of Brisbane Metro's M1 and M2 services in 2025, alongside changes to the city's wider bus network. Council is now investigating how similar high-capacity services could operate beyond the existing network.



LM Adrian Schrinner has encouraged residents to contribute to the expansion plans, arguing that the Metro model should be extended into other parts of Brisbane.



Civic Cabinet Chair for Transport Cr Andrew Wines has also sought feedback from regular passengers and people who would consider using public transport if better services were available.







Construction funding and 2032 timetable remain uncertain



Brisbane City Council is working with the Queensland and Australian governments on the Brisbane Metro Expansions Business Case, with Jacobs Group (Australia) engaged to undertake the work.



The business case will investigate possible route alignments, depot locations, network improvements, infrastructure requirements and the order in which different sections could be delivered.



The Australian Government has committed $50 million to support development of the final business case and related expansion planning. However, construction funding for the proposed corridors has not been secured, and major infrastructure works would require substantial additional investment.



Mr Schrinner has declined to guarantee that any of the proposed extensions will be completed before the Brisbane 2032 Olympic and Paralympic Games.



The distinction between long-term expansion plans and present-day transport needs has also attracted criticism. Opposition Leader Cr Jared Cassidy has called for more suburban bus services now, rather than waiting years for major infrastructure projects.



Council expects the expansion business case to be completed in late 2027. Any subsequent construction would depend on funding availability, relevant approvals and decisions about which sections should proceed.



How residents can have their say



The survey is open until Sunday, 13 December 2026. Council has also provided an option for residents to register for project updates as the business case progresses.




HAVE YOUR SAY










.bson-metro-box {
  box-sizing: border-box;
  max-width: 100%;
  padding: 20px;
  margin: 24px 0;
  border: 1px solid #d5dee8;
  border-left: 4px solid #235b87;
  border-radius: 6px;
  background: #f6f9fc;
  color: #1e293b;
  font-family: inherit;
  line-height: 1.6;
}
.bson-metro-box * { box-sizing: border-box; }
.bson-metro-box h3 {
  margin: 0 0 12px;
  font-size: 1.3rem;
  line-height: 1.35;
  color: #163c5c;
}
.bson-metro-box p { margin: 0 0 12px; }
.bson-metro-box ul {
  margin: 8px 0 16px;
  padding-left: 22px;
}
.bson-metro-box li { margin: 4px 0; }
.bson-metro-box a.bson-metro-link {
  display: inline-block;
  max-width: 100%;
  padding: 10px 15px;
  border-radius: 4px;
  background: #235b87;
  color: #fff;
  font-weight: 700;
  text-decoration: none;
  overflow-wrap: anywhere;
}
.bson-metro-box a.bson-metro-link:hover,
.bson-metro-box a.bson-metro-link:focus {
  background: #163c5c;
  color: #fff;
  text-decoration: underline;
}
.bson-metro-box .bson-metro-note {
  margin: 12px 0 0;
  font-size: .87rem;
  color: #475569;
}
@media (max-width: 480px) {
  .bson-metro-box { padding: 15px; }
  .bson-metro-box h3 { font-size: 1.15rem; }
  .bson-metro-box a.bson-metro-link {
    display: block;
    text-align: center;
  }
}



  Have Your Say on Brisbane Metro

  Survey closes:
  Sunday, 13 December 2026

  Brisbane City Council is seeking feedback
  about current travel experiences and
  potential bus network improvements.

  Proposed expansion corridors:
  
    Northern: CBD to Carseldine
    Eastern: CBD to Capalaba
    Southern: CBD to Springwood
    Airport: CBD to Brisbane Airport
  

  
    
      View Consultation and Survey
    
  

  
    The proposed corridors remain subject to
    the business case, funding and approvals.
    No final routes or construction timetable
    have been confirmed.
  





The&nbsp;online community survey&nbsp;can be accessed directly, while questions about the project can be sent to&nbsp;metroexpansions@brisbane.qld.gov.au.



Feedback gathered during the consultation will contribute to the business case, which is expected to provide more detailed information about potential routes, infrastructure requirements and delivery stages in late 2027.



Published 28-Oct-2026



Featured Image Credit: Wikipedia/Kyethepie21/CC0




]]></description>
<content:encoded><![CDATA[


Brisbane residents are being invited to share their public transport concerns and suggest improvements as community consultation begins on proposed Metro expansions across the city's northern, eastern, southern and airport corridors.



Submissions close on Sunday, 13 December 2026, giving commuters an opportunity to describe difficulties with existing services and suggest improvements. Their feedback will help inform a business case examining how Brisbane Metro could reach more suburbs.



Four corridors bring different transport questions



The proposed Northern Metro would connect the CBD with Carseldine, extending services through Lutwyche, Kedron, Chermside and Aspley. Gympie Road has been identified as a potential corridor, raising questions about how dedicated bus infrastructure could improve journeys along one of Brisbane's major northern transport routes.



For residents in these suburbs, the consultation provides an opportunity to describe existing problems involving bus connections, journey reliability and access to public transport. Final station locations and the infrastructure needed for a northern extension remain undecided.



The Eastern Metro proposal would connect central Brisbane with Capalaba through the eastern suburbs, with Old Cleveland Road identified as a potential route. Commuters travelling through areas including Coorparoo could provide feedback about existing services, transfers and difficulties encountered during their journeys.



South of the city, the proposed Southern Metro would connect the CBD with Springwood, complementing the South East Busway extension and linking with the existing M1 service at Eight Mile Plains busway station.



The fourth corridor would create express Metro connections between Brisbane Airport's domestic and international terminals and the CBD. Planning will examine how those services could fit into the wider public transport network.



All four corridors remain proposals, with their potential alignments and infrastructure needs to be examined through the business case.



Photo Credit: BCC



Population growth adds pressure to existing routes



Council forecasts substantial population growth along the three residential corridors over the next 20 years.



Its projections indicate increases of 60 per cent along the CBD-to-Carseldine corridor, 29 per cent towards Capalaba and 96 per cent towards Springwood. Approximately 88,000 additional residents are expected in areas surrounding those corridors.



Brisbane's latest expansion proposals also revisit ambitions from the South East Queensland Integrated Regional Transport Plan developed in the 1990s. The earlier plan proposed approximately 75 kilometres of busways, but only about 25 kilometres were ultimately built.



Infrastructure Australia has identified the Metro expansion as an early-stage investment proposal that could improve public transport capacity, interchange connections and service reliability. Potential benefits remain subject to further planning and assessment.



Council wants to hear where journeys fall short



The consultation focuses on residents' current travel experiences and suggestions for improving bus services along the proposed corridors, rather than asking them to comment on completed designs.



Issues such as unreliable travel times, inconvenient transfers, access to stops and gaps in service coverage could be raised by residents. Council has not indicated that participants will be able to vote on final station locations or select specific route alignments.



The consultation follows the introduction of Brisbane Metro's M1 and M2 services in 2025, alongside changes to the city's wider bus network. Council is now investigating how similar high-capacity services could operate beyond the existing network.



LM Adrian Schrinner has encouraged residents to contribute to the expansion plans, arguing that the Metro model should be extended into other parts of Brisbane.



Civic Cabinet Chair for Transport Cr Andrew Wines has also sought feedback from regular passengers and people who would consider using public transport if better services were available.







Construction funding and 2032 timetable remain uncertain



Brisbane City Council is working with the Queensland and Australian governments on the Brisbane Metro Expansions Business Case, with Jacobs Group (Australia) engaged to undertake the work.



The business case will investigate possible route alignments, depot locations, network improvements, infrastructure requirements and the order in which different sections could be delivered.



The Australian Government has committed $50 million to support development of the final business case and related expansion planning. However, construction funding for the proposed corridors has not been secured, and major infrastructure works would require substantial additional investment.



Mr Schrinner has declined to guarantee that any of the proposed extensions will be completed before the Brisbane 2032 Olympic and Paralympic Games.



The distinction between long-term expansion plans and present-day transport needs has also attracted criticism. Opposition Leader Cr Jared Cassidy has called for more suburban bus services now, rather than waiting years for major infrastructure projects.



Council expects the expansion business case to be completed in late 2027. Any subsequent construction would depend on funding availability, relevant approvals and decisions about which sections should proceed.



How residents can have their say



The survey is open until Sunday, 13 December 2026. Council has also provided an option for residents to register for project updates as the business case progresses.




HAVE YOUR SAY










.bson-metro-box {
  box-sizing: border-box;
  max-width: 100%;
  padding: 20px;
  margin: 24px 0;
  border: 1px solid #d5dee8;
  border-left: 4px solid #235b87;
  border-radius: 6px;
  background: #f6f9fc;
  color: #1e293b;
  font-family: inherit;
  line-height: 1.6;
}
.bson-metro-box * { box-sizing: border-box; }
.bson-metro-box h3 {
  margin: 0 0 12px;
  font-size: 1.3rem;
  line-height: 1.35;
  color: #163c5c;
}
.bson-metro-box p { margin: 0 0 12px; }
.bson-metro-box ul {
  margin: 8px 0 16px;
  padding-left: 22px;
}
.bson-metro-box li { margin: 4px 0; }
.bson-metro-box a.bson-metro-link {
  display: inline-block;
  max-width: 100%;
  padding: 10px 15px;
  border-radius: 4px;
  background: #235b87;
  color: #fff;
  font-weight: 700;
  text-decoration: none;
  overflow-wrap: anywhere;
}
.bson-metro-box a.bson-metro-link:hover,
.bson-metro-box a.bson-metro-link:focus {
  background: #163c5c;
  color: #fff;
  text-decoration: underline;
}
.bson-metro-box .bson-metro-note {
  margin: 12px 0 0;
  font-size: .87rem;
  color: #475569;
}
@media (max-width: 480px) {
  .bson-metro-box { padding: 15px; }
  .bson-metro-box h3 { font-size: 1.15rem; }
  .bson-metro-box a.bson-metro-link {
    display: block;
    text-align: center;
  }
}



  Have Your Say on Brisbane Metro

  Survey closes:
  Sunday, 13 December 2026

  Brisbane City Council is seeking feedback
  about current travel experiences and
  potential bus network improvements.

  Proposed expansion corridors:
  
    Northern: CBD to Carseldine
    Eastern: CBD to Capalaba
    Southern: CBD to Springwood
    Airport: CBD to Brisbane Airport
  

  
    
      View Consultation and Survey
    
  

  
    The proposed corridors remain subject to
    the business case, funding and approvals.
    No final routes or construction timetable
    have been confirmed.
  





The&nbsp;online community survey&nbsp;can be accessed directly, while questions about the project can be sent to&nbsp;metroexpansions@brisbane.qld.gov.au.



Feedback gathered during the consultation will contribute to the business case, which is expected to provide more detailed information about potential routes, infrastructure requirements and delivery stages in late 2027.



Published 28-Oct-2026



Featured Image Credit: Wikipedia/Kyethepie21/CC0




]]></content:encoded>
</item><item>
<title><![CDATA[Queensland’s Smoke Alarm Deadline Is Near — Is Your Family Really Protected?]]></title>
<link>https://annerleynews.com.au/queensland-smoke-alarm-deadline-2027-home-safety/queensland-smoke-alarm-deadline-2027-home-safety</link>
<media:content url="https://annerleynews.com.au/wp-content/uploads/2026/11/Brooks-Kenmore-1.jpeg" medium="image"/>
<media:thumbnail url="https://annerleynews.com.au/wp-content/uploads/2026/11/Brooks-Kenmore-1.jpeg"/>
<enclosure url="https://annerleynews.com.au/wp-content/uploads/2026/11/Brooks-Kenmore-1.jpeg" length="298570" type="image/jpeg"/>
<pubDate>Wed, 11 Nov 2026 10:19:05 +0000</pubDate>
<dc:creator><![CDATA[Annerley News]]></dc:creator>
<guid isPermaLink="true">https://annerleynews.com.au/queensland-smoke-alarm-deadline-2027-home-safety/</guid>
<description><![CDATA[




By Cathy Brand | Fire Safety Advocate and CEO of Brooks Australia



A Queensland homeowner could have several working smoke alarms throughout their property and still fall short of the state's requirements when the final stage of its smoke alarm reforms takes effect on 1 January 2027.



The changes go well beyond replacing ageing devices. They affect where alarms must be installed, how they communicate with one another and the type of technology permitted. For households that have relied on the same arrangement for years, becoming compliant may involve a more substantial upgrade than expected.



With just over two months remaining, the approaching deadline also presents an opportunity to consider whether the warning system provides everyone in the home with the best possible chance of escaping a fire.



A decade of reform reaches its final deadline



Queensland's smoke alarm reforms have been introduced progressively over the past decade, beginning with new homes and substantial renovations in 2017. Properties being sold or leased were required to meet the upgraded standards from January 2022, while the final stage, commencing on 1 January 2027, applies to the remaining domestic dwellings.




  
    .cb-history-box,
    .cb-history-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-history-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px 26px;
      background: #f5f6f7;
      border: 1px solid #d9dee2;
      border-left: 5px solid #40566a;
      border-radius: 7px;
      color: #26323b;
      font: 16px/1.65 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-history-box h3 {
      margin: 0 0 17px;
      color: #203b50;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
      hyphens: none;
    }

    .cb-history-box p {
      margin: 0 0 14px;
      line-height: 1.65;
      hyphens: none;
    }

    .cb-history-box p:last-child {
      margin-bottom: 0;
    }

    .cb-history-box strong {
      color: #203b50;
    }

    .cb-history-box a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-history-box a:hover,
    .cb-history-box a:focus {
      color: #40566a;
    }

    @media (max-width: 600px) {
      .cb-history-box {
        padding: 19px 16px;
        margin: 22px 0;
        font-size: 15px;
      }

      .cb-history-box h3 {
        font-size: 19px;
      }
    }
  

  The Slacks Creek Tragedy That Changed Queensland's Smoke Alarm Laws

  
    On 24 August 2011, a house fire at Slacks Creek,
    south of Brisbane, claimed 11 lives, including
    eight children. The disaster became
    a defining tragedy in Queensland's
    approach to residential fire safety,
    ultimately helping drive some of the country's
    most significant smoke alarm reforms.
  

  
    The coronial inquest, whose findings were
    delivered on 28 November 2014, examined
    the failure of the home's smoke alarms.
    The coroner concluded there was a reasonable
    prospect that some or all of those who died
    could have escaped had the alarms been working.
  

  
    The coroner's recommendations helped shape
    sweeping changes to Queensland's smoke alarm
    laws. Legislation passed in 2016 introduced
    a ten-year transition towards photoelectric,
    interconnected alarms installed in bedrooms,
    connecting hallways and on every storey.
  

  
    The reforms began taking effect in January 2017,
    with the final stage due on 1 January 2027.
  

  
    The changes reflect a fundamental lesson from
    the tragedy: providing an earlier warning
    throughout a home can give occupants more
    time to escape.
  




The legislation requires photoelectric smoke alarms complying with Australian Standard AS 3786:2014, without an ionisation sensor. They must be less than ten years old, operate when tested and be interconnected so that when one alarm activates, all connected alarms sound.



Placement is equally important. Alarms are required in every bedroom, in hallways connecting bedrooms to the rest of the dwelling and on each storey, with additional provisions for levels without bedrooms. A home with functioning alarms in its hallways, for example, may still need additional units inside bedrooms to satisfy the requirements.



One common misconception is that compliance necessarily involves extensive rewiring. Queensland permits compliant alarms powered by non-removable ten-year batteries in existing dwellings where appropriate, and wireless interconnection can provide an alternative to running interconnect cables throughout a property.



However, an existing hardwired smoke alarm must be replaced with another hardwired unit, with the electrical work undertaken by a licensed electrician. New homes and substantial renovations have separate hardwiring requirements. Depending on the home's existing installation, a combination of hardwired and compatible wireless interconnected alarms may also be suitable.





  
    .cb-compliance-box,
    .cb-compliance-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-compliance-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px;
      background: #fff7f8;
      border: 1px solid #e8cbd1;
      border-left: 5px solid #CF0A2C;
      border-radius: 7px;
      color: #2E2A25;
      font: 16px/1.55 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-box h3 {
      margin: 0 0 12px;
      color: #CF0A2C;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-box .cb-intro {
      margin: 0 0 19px;
      line-height: 1.6;
    }

    .cb-compliance-grid {
      display: grid;
      grid-template-columns: repeat(2, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-compliance-item {
      min-width: 0;
      padding: 14px 15px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-item strong {
      display: block;
      margin-bottom: 5px;
      color: #CF0A2C;
      font-size: 15px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-item p {
      margin: 0;
      color: #2E2A25;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-install-section {
      margin-top: 24px;
      padding-top: 19px;
      border-top: 2px solid #e8cbd1;
    }

    .cb-install-section h4 {
      margin: 0 0 8px;
      color: #CF0A2C;
      font-size: 19px;
      line-height: 1.35;
      font-weight: 700;
    }

    .cb-install-intro {
      margin: 0 0 15px;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-install-grid {
      display: grid;
      grid-template-columns: repeat(3, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-install-item {
      min-width: 0;
      padding: 14px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
    }

    .cb-install-item strong {
      display: block;
      margin-bottom: 7px;
      color: #CF0A2C;
      font-size: 15px;
      line-height: 1.4;
    }

    .cb-install-item p {
      margin: 0;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-compliance-note {
      margin: 20px 0 0;
      padding-top: 14px;
      border-top: 1px solid #e8cbd1;
      color: #403a37;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-compliance-note strong {
      color: #CF0A2C;
    }

    @media (max-width: 650px) {
      .cb-compliance-box {
        padding: 18px 15px;
        margin: 22px 0;
      }

      .cb-compliance-box h3 {
        font-size: 19px;
      }

      .cb-compliance-grid,
      .cb-install-grid {
        grid-template-columns: minmax(0, 1fr);
        gap: 9px;
      }

      .cb-compliance-item,
      .cb-install-item {
        padding: 12px 13px;
      }

      .cb-install-section h4 {
        font-size: 18px;
      }

      .cb-compliance-note {
        font-size: 13px;
      }
    }
  

  
    Queensland's 2027 Smoke Alarm Rules:
    A Homeowner's Checklist
  

  
    By 1 January 2027, all remaining private homes,
    townhouses and units in Queensland must comply
    with the state's upgraded smoke alarm requirements.
  

  

    
      Alarm type
      
        Required alarms must be photoelectric,
        comply with AS 3786:2014 and contain
        no ionisation sensor.
      
    

    
      Age
      
        Alarms must be less than ten years old
        from their manufacture date.
      
    

    
      Interconnection
      
        All required alarms must be interconnected
        so that when one activates, they all sound.
      
    

    
      Bedrooms
      
        An alarm must be installed in every bedroom.
      
    

    
      Hallways
      
        Alarms must be installed in hallways connecting
        bedrooms to the rest of the dwelling. Where
        there is no hallway, an alarm must be installed
        between the bedrooms and other parts
        of the storey.
      
    

    
      Every storey
      
        Each level requires appropriate coverage.
        On storeys without bedrooms, an alarm must
        be installed in the most likely path of
        travel to an exit.
      
    

    
      Power source
      
        Alarms must be hardwired or use a
        non-removable ten-year battery, as permitted
        for the property. New homes and substantial
        renovations require hardwired alarms.
      
    

    
      Hardwired replacements
      
        Existing 240V hardwired smoke alarms must
        be replaced with compliant hardwired
        photoelectric alarms, not battery-only models.
        A licensed electrician must carry out
        the electrical replacement.
      
    

    
      Operation
      
        All alarms must work when tested.
      
    

  

  

    Who Can Install Your Smoke Alarms?

    
      Queensland law does not require every smoke
      alarm to be installed by an electrician.
      The requirements depend on the alarm's
      power source and whether electrical work
      is involved.
    

    

      
        1. New hardwired alarms
        
          A licensed electrician is required
          to install 240V hardwired smoke alarms.
          This includes electrical wiring and
          connections to mains power.
        
      

      
        2. Battery-powered alarms
        
          Homeowners can generally install compliant
          photoelectric alarms powered by non-removable
          ten-year batteries themselves, provided
          no electrical work is required. All alarms
          must be correctly positioned and interconnected
          in accordance with Queensland's prescribed
          placement distances and installation requirements.
        
      

      
        3. Replacing hardwired alarms
        
          Existing 240V hardwired smoke alarms
          must be replaced with compliant
          hardwired photoelectric alarms,
          not battery-only models.
          A licensed electrician must carry
          out the electrical replacement.
        
      

    

  

  
    Important:
    Smoke alarm placement and power-source requirements
    depend on the dwelling's layout and existing
    installation. Consult the
    
      Queensland Fire Department's official guidance
    
    or a suitably qualified installer if uncertain.
  






A fire doesn't wait for smoke to reach your bedroom



A fire may begin in a part of the house far removed from where occupants are sleeping. In a conventional arrangement of independent alarms, someone at the opposite end of the property may not receive a warning until smoke reaches an alarm closer to their bedroom.



Interconnected alarms address that delay by activating throughout the home when any one of the connected devices detects smoke.



The practical importance becomes particularly clear in larger houses, multi-storey properties and homes where bedroom doors are kept closed overnight. A fire starting in one sleeping area can trigger alarms elsewhere, alerting other occupants who may be able to assist.



In my own home, our bedroom is at one end of the house and our children's bedrooms are at the other. They sleep with their doors closed, as many children do. If a fire were to start in one of their rooms, I would want to know immediately, rather than wait for smoke to reach an alarm closer to where we sleep.



That is why interconnection matters. We want the warning travelling through the house faster than the smoke, giving everyone the earliest possible opportunity to respond.



The last-minute rush Queenslanders could do without



Despite years of public information campaigns, awareness of the legislation has not necessarily translated into completed installations.



The Queensland Fire Department's 2025 Community Insights Survey found that 72 per cent of respondents were aware of the interconnected smoke alarm legislation, but only 54 per cent knew about the 1 January 2027 deadline. At the time of the survey, 52 per cent reported having interconnected alarms installed.



These figures reflect what respondents reported rather than independently verified compliance, but they indicate that a substantial number of Queensland households may still need to review their arrangements.



A concentrated rush in the final weeks could also place pressure on product availability and electrician appointments. While shortages are not inevitable, households that act earlier have more time to understand their options, obtain advice and arrange any necessary installation work.



An initial assessment need not be complicated. Homeowners can begin by checking the location and manufacture date of their existing alarms, confirming whether they are photoelectric and interconnected, and testing that they operate correctly. They should also establish whether every required sleeping area and storey has appropriate coverage.



For households with existing hardwired systems, advice from a licensed electrician can help determine what needs replacing and how additional alarms can be incorporated.



A compliant home isn't necessarily a safer home for everyone



Queensland's legislation establishes a minimum standard for residential smoke alarm protection, but the circumstances of the people living in each home can be just as important as the building itself.



An audible warning, for example, may not be sufficient for someone who is deaf or hard of hearing, while a person with limited mobility may require additional time or assistance to evacuate. These considerations do not change the legal requirements, but they can influence whether a household needs supplementary warning equipment or other safety arrangements.



Families should also develop and practise an escape plan that accounts for the needs of everyone living in the home, including children, older residents and people who may require assistance. Installing compliant alarms is important, but knowing how to respond when they sound is another essential part of household fire safety.



Homeowners who have yet to complete their upgrades should begin by reviewing their existing alarms, checking the requirements for their property and arranging professional advice where needed. Leaving the work until the final weeks of December may unnecessarily limit their options.



Queensland's smoke alarm reforms were introduced to improve the warning people receive when fire breaks out at home. Meeting the requirements before 1 January 2027 is an important step, but the greater responsibility is ensuring that everyone in the household knows what to do when those alarms sound.




  
    .cb-author-box,
    .cb-author-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-author-box {
      width: 100%;
      max-width: 100%;
      margin: 30px 0;
      padding: 23px;
      background: #f7f8f9;
      border: 1px solid #dce1e5;
      border-radius: 7px;
      color: #283740;
      font: 15px/1.6 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      hyphens: none;
    }

    .cb-author-main {
      display: grid;
      grid-template-columns: 145px minmax(0, 1fr);
      gap: 22px;
      align-items: start;
    }

    .cb-author-photo {
      width: 145px;
      max-width: 100%;
      height: auto;
      display: block;
      border-radius: 5px;
      object-fit: contain;
    }

    .cb-author-copy h3 {
      margin: 0 0 10px;
      color: #203b50;
      font-size: 21px;
      line-height: 1.3;
      font-weight: 700;
    }

    .cb-author-copy p {
      margin: 0;
      line-height: 1.65;
    }

    .cb-author-copy a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-author-copy a:hover,
    .cb-author-copy a:focus {
      color: #40566a;
    }

    .cb-author-box .cb-series-note {
      margin: 19px 0 0;
      padding: 13px 0 0;
      border-top: 1px solid #dce1e5;
      color: #586670;
      font-size: 13px;
      line-height: 1.6;
      font-style: italic;
    }

    @media (max-width: 600px) {
      .cb-author-box {
        padding: 19px 16px;
        margin: 24px 0;
      }

      .cb-author-main {
        grid-template-columns: minmax(0, 1fr);
        gap: 15px;
      }

      .cb-author-photo {
        width: 150px;
        max-width: 65%;
        height: auto;
        margin: 0 auto;
      }

      .cb-author-copy h3 {
        font-size: 20px;
      }
    }
  

  

    
      
    

    
      About Cathy Brand

      
        Cathy Brand is the Chief
        Executive Officer of
        Brooks Australia,
        a provider of fire detection and warning
        technology. Through her work in the fire
        safety industry, she advocates for greater
        awareness of residential fire protection,
        interconnected smoke alarm systems and
        solutions that consider the needs of
        different households.
      
    

  

  
    Home Fire Safety with Cathy Brand is a five-part
    sponsored editorial series presented in
    partnership with Brooks Australia.
  




Published 27-October-2026




]]></description>
<content:encoded><![CDATA[




By Cathy Brand | Fire Safety Advocate and CEO of Brooks Australia



A Queensland homeowner could have several working smoke alarms throughout their property and still fall short of the state's requirements when the final stage of its smoke alarm reforms takes effect on 1 January 2027.



The changes go well beyond replacing ageing devices. They affect where alarms must be installed, how they communicate with one another and the type of technology permitted. For households that have relied on the same arrangement for years, becoming compliant may involve a more substantial upgrade than expected.



With just over two months remaining, the approaching deadline also presents an opportunity to consider whether the warning system provides everyone in the home with the best possible chance of escaping a fire.



A decade of reform reaches its final deadline



Queensland's smoke alarm reforms have been introduced progressively over the past decade, beginning with new homes and substantial renovations in 2017. Properties being sold or leased were required to meet the upgraded standards from January 2022, while the final stage, commencing on 1 January 2027, applies to the remaining domestic dwellings.




  
    .cb-history-box,
    .cb-history-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-history-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px 26px;
      background: #f5f6f7;
      border: 1px solid #d9dee2;
      border-left: 5px solid #40566a;
      border-radius: 7px;
      color: #26323b;
      font: 16px/1.65 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-history-box h3 {
      margin: 0 0 17px;
      color: #203b50;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
      hyphens: none;
    }

    .cb-history-box p {
      margin: 0 0 14px;
      line-height: 1.65;
      hyphens: none;
    }

    .cb-history-box p:last-child {
      margin-bottom: 0;
    }

    .cb-history-box strong {
      color: #203b50;
    }

    .cb-history-box a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-history-box a:hover,
    .cb-history-box a:focus {
      color: #40566a;
    }

    @media (max-width: 600px) {
      .cb-history-box {
        padding: 19px 16px;
        margin: 22px 0;
        font-size: 15px;
      }

      .cb-history-box h3 {
        font-size: 19px;
      }
    }
  

  The Slacks Creek Tragedy That Changed Queensland's Smoke Alarm Laws

  
    On 24 August 2011, a house fire at Slacks Creek,
    south of Brisbane, claimed 11 lives, including
    eight children. The disaster became
    a defining tragedy in Queensland's
    approach to residential fire safety,
    ultimately helping drive some of the country's
    most significant smoke alarm reforms.
  

  
    The coronial inquest, whose findings were
    delivered on 28 November 2014, examined
    the failure of the home's smoke alarms.
    The coroner concluded there was a reasonable
    prospect that some or all of those who died
    could have escaped had the alarms been working.
  

  
    The coroner's recommendations helped shape
    sweeping changes to Queensland's smoke alarm
    laws. Legislation passed in 2016 introduced
    a ten-year transition towards photoelectric,
    interconnected alarms installed in bedrooms,
    connecting hallways and on every storey.
  

  
    The reforms began taking effect in January 2017,
    with the final stage due on 1 January 2027.
  

  
    The changes reflect a fundamental lesson from
    the tragedy: providing an earlier warning
    throughout a home can give occupants more
    time to escape.
  




The legislation requires photoelectric smoke alarms complying with Australian Standard AS 3786:2014, without an ionisation sensor. They must be less than ten years old, operate when tested and be interconnected so that when one alarm activates, all connected alarms sound.



Placement is equally important. Alarms are required in every bedroom, in hallways connecting bedrooms to the rest of the dwelling and on each storey, with additional provisions for levels without bedrooms. A home with functioning alarms in its hallways, for example, may still need additional units inside bedrooms to satisfy the requirements.



One common misconception is that compliance necessarily involves extensive rewiring. Queensland permits compliant alarms powered by non-removable ten-year batteries in existing dwellings where appropriate, and wireless interconnection can provide an alternative to running interconnect cables throughout a property.



However, an existing hardwired smoke alarm must be replaced with another hardwired unit, with the electrical work undertaken by a licensed electrician. New homes and substantial renovations have separate hardwiring requirements. Depending on the home's existing installation, a combination of hardwired and compatible wireless interconnected alarms may also be suitable.





  
    .cb-compliance-box,
    .cb-compliance-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-compliance-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px;
      background: #fff7f8;
      border: 1px solid #e8cbd1;
      border-left: 5px solid #CF0A2C;
      border-radius: 7px;
      color: #2E2A25;
      font: 16px/1.55 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-box h3 {
      margin: 0 0 12px;
      color: #CF0A2C;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-box .cb-intro {
      margin: 0 0 19px;
      line-height: 1.6;
    }

    .cb-compliance-grid {
      display: grid;
      grid-template-columns: repeat(2, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-compliance-item {
      min-width: 0;
      padding: 14px 15px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-item strong {
      display: block;
      margin-bottom: 5px;
      color: #CF0A2C;
      font-size: 15px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-item p {
      margin: 0;
      color: #2E2A25;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-install-section {
      margin-top: 24px;
      padding-top: 19px;
      border-top: 2px solid #e8cbd1;
    }

    .cb-install-section h4 {
      margin: 0 0 8px;
      color: #CF0A2C;
      font-size: 19px;
      line-height: 1.35;
      font-weight: 700;
    }

    .cb-install-intro {
      margin: 0 0 15px;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-install-grid {
      display: grid;
      grid-template-columns: repeat(3, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-install-item {
      min-width: 0;
      padding: 14px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
    }

    .cb-install-item strong {
      display: block;
      margin-bottom: 7px;
      color: #CF0A2C;
      font-size: 15px;
      line-height: 1.4;
    }

    .cb-install-item p {
      margin: 0;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-compliance-note {
      margin: 20px 0 0;
      padding-top: 14px;
      border-top: 1px solid #e8cbd1;
      color: #403a37;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-compliance-note strong {
      color: #CF0A2C;
    }

    @media (max-width: 650px) {
      .cb-compliance-box {
        padding: 18px 15px;
        margin: 22px 0;
      }

      .cb-compliance-box h3 {
        font-size: 19px;
      }

      .cb-compliance-grid,
      .cb-install-grid {
        grid-template-columns: minmax(0, 1fr);
        gap: 9px;
      }

      .cb-compliance-item,
      .cb-install-item {
        padding: 12px 13px;
      }

      .cb-install-section h4 {
        font-size: 18px;
      }

      .cb-compliance-note {
        font-size: 13px;
      }
    }
  

  
    Queensland's 2027 Smoke Alarm Rules:
    A Homeowner's Checklist
  

  
    By 1 January 2027, all remaining private homes,
    townhouses and units in Queensland must comply
    with the state's upgraded smoke alarm requirements.
  

  

    
      Alarm type
      
        Required alarms must be photoelectric,
        comply with AS 3786:2014 and contain
        no ionisation sensor.
      
    

    
      Age
      
        Alarms must be less than ten years old
        from their manufacture date.
      
    

    
      Interconnection
      
        All required alarms must be interconnected
        so that when one activates, they all sound.
      
    

    
      Bedrooms
      
        An alarm must be installed in every bedroom.
      
    

    
      Hallways
      
        Alarms must be installed in hallways connecting
        bedrooms to the rest of the dwelling. Where
        there is no hallway, an alarm must be installed
        between the bedrooms and other parts
        of the storey.
      
    

    
      Every storey
      
        Each level requires appropriate coverage.
        On storeys without bedrooms, an alarm must
        be installed in the most likely path of
        travel to an exit.
      
    

    
      Power source
      
        Alarms must be hardwired or use a
        non-removable ten-year battery, as permitted
        for the property. New homes and substantial
        renovations require hardwired alarms.
      
    

    
      Hardwired replacements
      
        Existing 240V hardwired smoke alarms must
        be replaced with compliant hardwired
        photoelectric alarms, not battery-only models.
        A licensed electrician must carry out
        the electrical replacement.
      
    

    
      Operation
      
        All alarms must work when tested.
      
    

  

  

    Who Can Install Your Smoke Alarms?

    
      Queensland law does not require every smoke
      alarm to be installed by an electrician.
      The requirements depend on the alarm's
      power source and whether electrical work
      is involved.
    

    

      
        1. New hardwired alarms
        
          A licensed electrician is required
          to install 240V hardwired smoke alarms.
          This includes electrical wiring and
          connections to mains power.
        
      

      
        2. Battery-powered alarms
        
          Homeowners can generally install compliant
          photoelectric alarms powered by non-removable
          ten-year batteries themselves, provided
          no electrical work is required. All alarms
          must be correctly positioned and interconnected
          in accordance with Queensland's prescribed
          placement distances and installation requirements.
        
      

      
        3. Replacing hardwired alarms
        
          Existing 240V hardwired smoke alarms
          must be replaced with compliant
          hardwired photoelectric alarms,
          not battery-only models.
          A licensed electrician must carry
          out the electrical replacement.
        
      

    

  

  
    Important:
    Smoke alarm placement and power-source requirements
    depend on the dwelling's layout and existing
    installation. Consult the
    
      Queensland Fire Department's official guidance
    
    or a suitably qualified installer if uncertain.
  






A fire doesn't wait for smoke to reach your bedroom



A fire may begin in a part of the house far removed from where occupants are sleeping. In a conventional arrangement of independent alarms, someone at the opposite end of the property may not receive a warning until smoke reaches an alarm closer to their bedroom.



Interconnected alarms address that delay by activating throughout the home when any one of the connected devices detects smoke.



The practical importance becomes particularly clear in larger houses, multi-storey properties and homes where bedroom doors are kept closed overnight. A fire starting in one sleeping area can trigger alarms elsewhere, alerting other occupants who may be able to assist.



In my own home, our bedroom is at one end of the house and our children's bedrooms are at the other. They sleep with their doors closed, as many children do. If a fire were to start in one of their rooms, I would want to know immediately, rather than wait for smoke to reach an alarm closer to where we sleep.



That is why interconnection matters. We want the warning travelling through the house faster than the smoke, giving everyone the earliest possible opportunity to respond.



The last-minute rush Queenslanders could do without



Despite years of public information campaigns, awareness of the legislation has not necessarily translated into completed installations.



The Queensland Fire Department's 2025 Community Insights Survey found that 72 per cent of respondents were aware of the interconnected smoke alarm legislation, but only 54 per cent knew about the 1 January 2027 deadline. At the time of the survey, 52 per cent reported having interconnected alarms installed.



These figures reflect what respondents reported rather than independently verified compliance, but they indicate that a substantial number of Queensland households may still need to review their arrangements.



A concentrated rush in the final weeks could also place pressure on product availability and electrician appointments. While shortages are not inevitable, households that act earlier have more time to understand their options, obtain advice and arrange any necessary installation work.



An initial assessment need not be complicated. Homeowners can begin by checking the location and manufacture date of their existing alarms, confirming whether they are photoelectric and interconnected, and testing that they operate correctly. They should also establish whether every required sleeping area and storey has appropriate coverage.



For households with existing hardwired systems, advice from a licensed electrician can help determine what needs replacing and how additional alarms can be incorporated.



A compliant home isn't necessarily a safer home for everyone



Queensland's legislation establishes a minimum standard for residential smoke alarm protection, but the circumstances of the people living in each home can be just as important as the building itself.



An audible warning, for example, may not be sufficient for someone who is deaf or hard of hearing, while a person with limited mobility may require additional time or assistance to evacuate. These considerations do not change the legal requirements, but they can influence whether a household needs supplementary warning equipment or other safety arrangements.



Families should also develop and practise an escape plan that accounts for the needs of everyone living in the home, including children, older residents and people who may require assistance. Installing compliant alarms is important, but knowing how to respond when they sound is another essential part of household fire safety.



Homeowners who have yet to complete their upgrades should begin by reviewing their existing alarms, checking the requirements for their property and arranging professional advice where needed. Leaving the work until the final weeks of December may unnecessarily limit their options.



Queensland's smoke alarm reforms were introduced to improve the warning people receive when fire breaks out at home. Meeting the requirements before 1 January 2027 is an important step, but the greater responsibility is ensuring that everyone in the household knows what to do when those alarms sound.




  
    .cb-author-box,
    .cb-author-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-author-box {
      width: 100%;
      max-width: 100%;
      margin: 30px 0;
      padding: 23px;
      background: #f7f8f9;
      border: 1px solid #dce1e5;
      border-radius: 7px;
      color: #283740;
      font: 15px/1.6 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      hyphens: none;
    }

    .cb-author-main {
      display: grid;
      grid-template-columns: 145px minmax(0, 1fr);
      gap: 22px;
      align-items: start;
    }

    .cb-author-photo {
      width: 145px;
      max-width: 100%;
      height: auto;
      display: block;
      border-radius: 5px;
      object-fit: contain;
    }

    .cb-author-copy h3 {
      margin: 0 0 10px;
      color: #203b50;
      font-size: 21px;
      line-height: 1.3;
      font-weight: 700;
    }

    .cb-author-copy p {
      margin: 0;
      line-height: 1.65;
    }

    .cb-author-copy a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-author-copy a:hover,
    .cb-author-copy a:focus {
      color: #40566a;
    }

    .cb-author-box .cb-series-note {
      margin: 19px 0 0;
      padding: 13px 0 0;
      border-top: 1px solid #dce1e5;
      color: #586670;
      font-size: 13px;
      line-height: 1.6;
      font-style: italic;
    }

    @media (max-width: 600px) {
      .cb-author-box {
        padding: 19px 16px;
        margin: 24px 0;
      }

      .cb-author-main {
        grid-template-columns: minmax(0, 1fr);
        gap: 15px;
      }

      .cb-author-photo {
        width: 150px;
        max-width: 65%;
        height: auto;
        margin: 0 auto;
      }

      .cb-author-copy h3 {
        font-size: 20px;
      }
    }
  

  

    
      
    

    
      About Cathy Brand

      
        Cathy Brand is the Chief
        Executive Officer of
        Brooks Australia,
        a provider of fire detection and warning
        technology. Through her work in the fire
        safety industry, she advocates for greater
        awareness of residential fire protection,
        interconnected smoke alarm systems and
        solutions that consider the needs of
        different households.
      
    

  

  
    Home Fire Safety with Cathy Brand is a five-part
    sponsored editorial series presented in
    partnership with Brooks Australia.
  




Published 27-October-2026




]]></content:encoded>
</item><item>
<title><![CDATA[Parkinson Alternative School Helps Students Complete Year 12 and Prepare for Work]]></title>
<link>https://forestlakenews.com.au/parkinson-alternative-school-year-12-career-pathways</link>
<media:content url="https://forestlakenews.com.au/wp-content/uploads/2026/11/FI-for-OMC-2026-11-13T182836.352.webp" medium="image"/>
<media:thumbnail url="https://forestlakenews.com.au/wp-content/uploads/2026/11/FI-for-OMC-2026-11-13T182836.352.webp"/>
<enclosure url="https://forestlakenews.com.au/wp-content/uploads/2026/11/FI-for-OMC-2026-11-13T182836.352.webp" length="160456" type="image/webp"/>
<pubDate>Fri, 13 Nov 2026 10:36:36 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[alternative education Queensland]]></category>
<category><![CDATA[Brisbane South Senior Campus]]></category>
<category><![CDATA[Parkinson schools]]></category>
<category><![CDATA[Y Schools Queensland]]></category>
<category><![CDATA[Year 12 education]]></category>
<dc:creator><![CDATA[Forest Lake News]]></dc:creator>
<guid isPermaLink="true">https://forestlakenews.com.au/?page_id=14380</guid>
<description><![CDATA[
An alternative senior school in Parkinson is combining flexible learning with vocational training to help students complete their secondary education and prepare for employment, as enrolments in Queensland’s special assistance school sector continue to grow.







Read: Inala Teacher Jessica Neilson-Scott Wins BCE Award for Inclusive Classroom Approach







Y Schools Queensland’s Brisbane South Senior Campus caters for students in Years 10 to 12 who need an alternative approach to senior secondary education.



The campus uses personalised learning plans, smaller classes and practical programs to help students re-engage with learning and work towards their future goals. Its approach also includes vocational education and training (VET), giving students opportunities to develop skills relevant to further study and employment.



Photo credit: Google Maps/Y Schools Brisbane South Senior



Y Schools Queensland’s Brisbane South Annual Report 2026, based on 2025 data, recorded 33 students awarded a Senior Education Profile. The report also recorded four students awarded a Queensland Certificate of Education (QCE), 17 students awarded one or more VET qualifications, and five students completing or having completed a school-based apprenticeship or traineeship.



The qualifications represent different forms of achievement. A Senior Education Profile is an official record of a student’s senior secondary results. It may include a Senior Statement and, where eligibility requirements are met, a QCE or Queensland Certificate of Individual Achievement.



A QCE is Queensland’s senior secondary qualification. Students generally need 20 credits, including at least 12 completed Core credits, and must meet literacy, numeracy and academic integrity requirements.



VET qualifications give students nationally recognised training in particular fields. School-based apprenticeships and traineeships combine paid employment and structured training with school studies, allowing students to gain workplace experience while working towards a qualification.



Photo credit: Facebook/Y Schools Queensland



Y Schools says its Brisbane South Senior Campus provides practical industry experience and pathways into local employment. The school identifies part-time work, apprenticeships and future careers as potential outcomes of its vocational programs.



The 2025 annual report also recorded an average Year 12 attendance rate of 53.53 per cent. The figure provides an important measure of student participation, although the report does not explain individual attendance patterns or the reasons behind absences.





.fln-pathways {
  margin: 24px 0;
  padding: 18px;
  border: 1px solid #d8dfe5;
  border-radius: 10px;
  background: #f7f9fb;
  color: #202830;
  font-family: Arial, sans-serif;
}

.fln-pathways h3 {
  margin: 0 0 8px;
  font-size: 20px;
  line-height: 1.3;
}

.fln-pathways-intro {
  margin: 0 0 16px;
  font-size: 14px;
  line-height: 1.5;
}

.fln-pathways-grid {
  display: grid;
  grid-template-columns: repeat(3, minmax(0, 1fr));
  gap: 12px;
}

.fln-pathway-item {
  padding: 14px;
  border: 1px solid #dce3e9;
  border-radius: 8px;
  background: #fff;
  min-width: 0;
}

.fln-pathway-item h4 {
  margin: 0 0 7px;
  font-size: 16px;
  line-height: 1.3;
}

.fln-pathway-item p {
  margin: 0;
  font-size: 14px;
  line-height: 1.5;
}

.fln-pathways-note {
  margin: 14px 0 0;
  font-size: 12px;
  line-height: 1.5;
  color: #46515c;
}

@media (max-width: 640px) {
  .fln-pathways {
    padding: 14px;
  }

  .fln-pathways-grid {
    grid-template-columns: 1fr;
  }
}



  Understanding Year 12 and Vocational Pathways
  
    Queensland senior students can work towards different qualifications and training outcomes.
  

  
    
      QCE
      
        The Queensland Certificate of Education is the state's senior secondary qualification. Students must meet credit, literacy, numeracy and academic integrity requirements.
      
    

    
      VET
      
        Vocational education and training provides practical, nationally recognised qualifications in areas of study linked to work and further training.
      
    

    
      School-based apprenticeships and traineeships
      
        These combine paid employment and structured training with school studies, helping students gain workplace experience while working towards a qualification.
      
    
  

  
    Students may pursue different combinations of senior school subjects, vocational qualifications and workplace training. Requirements vary by qualification and training arrangement.
  





Alternative education expands across Queensland



The Parkinson campus is part of a wider network of alternative education providers supporting young people who may not thrive in mainstream school settings.



Independent Schools Queensland reported in November 2026 that enrolments in the state’s independent special assistance schools had increased seven-fold since 2016. The sector had grown from 14 schools to 31, with more than 11,000 students enrolled in 2025.



The figures relate specifically to independent special assistance schools, rather than every alternative education provider in Queensland.



Y Schools Queensland operates campuses across Brisbane, Logan, Ipswich, Redlands, Moreton Bay, Bundaberg and Toowoomba. Its Brisbane South program includes a junior campus in Acacia Ridge and the senior campus in Parkinson.



Students seeking a place at Y Schools must be referred and attend an interview so the school can assess their needs. Referrals may come from current or former school staff, health professionals and family support services. Students may be placed on a waiting list if their preferred year level is full.







Read: Residents Await Answers Over Closed Poinsettia Street Walkway







The Parkinson campus provides a senior schooling option built around flexible learning, formal qualifications and practical training. Its 2025 results show students pursuing several different pathways, while the attendance figures underline that supporting engagement remains an important part of the work.



Published 13-November-2026




]]></description>
<content:encoded><![CDATA[
An alternative senior school in Parkinson is combining flexible learning with vocational training to help students complete their secondary education and prepare for employment, as enrolments in Queensland’s special assistance school sector continue to grow.







Read: Inala Teacher Jessica Neilson-Scott Wins BCE Award for Inclusive Classroom Approach







Y Schools Queensland’s Brisbane South Senior Campus caters for students in Years 10 to 12 who need an alternative approach to senior secondary education.



The campus uses personalised learning plans, smaller classes and practical programs to help students re-engage with learning and work towards their future goals. Its approach also includes vocational education and training (VET), giving students opportunities to develop skills relevant to further study and employment.



Photo credit: Google Maps/Y Schools Brisbane South Senior



Y Schools Queensland’s Brisbane South Annual Report 2026, based on 2025 data, recorded 33 students awarded a Senior Education Profile. The report also recorded four students awarded a Queensland Certificate of Education (QCE), 17 students awarded one or more VET qualifications, and five students completing or having completed a school-based apprenticeship or traineeship.



The qualifications represent different forms of achievement. A Senior Education Profile is an official record of a student’s senior secondary results. It may include a Senior Statement and, where eligibility requirements are met, a QCE or Queensland Certificate of Individual Achievement.



A QCE is Queensland’s senior secondary qualification. Students generally need 20 credits, including at least 12 completed Core credits, and must meet literacy, numeracy and academic integrity requirements.



VET qualifications give students nationally recognised training in particular fields. School-based apprenticeships and traineeships combine paid employment and structured training with school studies, allowing students to gain workplace experience while working towards a qualification.



Photo credit: Facebook/Y Schools Queensland



Y Schools says its Brisbane South Senior Campus provides practical industry experience and pathways into local employment. The school identifies part-time work, apprenticeships and future careers as potential outcomes of its vocational programs.



The 2025 annual report also recorded an average Year 12 attendance rate of 53.53 per cent. The figure provides an important measure of student participation, although the report does not explain individual attendance patterns or the reasons behind absences.





.fln-pathways {
  margin: 24px 0;
  padding: 18px;
  border: 1px solid #d8dfe5;
  border-radius: 10px;
  background: #f7f9fb;
  color: #202830;
  font-family: Arial, sans-serif;
}

.fln-pathways h3 {
  margin: 0 0 8px;
  font-size: 20px;
  line-height: 1.3;
}

.fln-pathways-intro {
  margin: 0 0 16px;
  font-size: 14px;
  line-height: 1.5;
}

.fln-pathways-grid {
  display: grid;
  grid-template-columns: repeat(3, minmax(0, 1fr));
  gap: 12px;
}

.fln-pathway-item {
  padding: 14px;
  border: 1px solid #dce3e9;
  border-radius: 8px;
  background: #fff;
  min-width: 0;
}

.fln-pathway-item h4 {
  margin: 0 0 7px;
  font-size: 16px;
  line-height: 1.3;
}

.fln-pathway-item p {
  margin: 0;
  font-size: 14px;
  line-height: 1.5;
}

.fln-pathways-note {
  margin: 14px 0 0;
  font-size: 12px;
  line-height: 1.5;
  color: #46515c;
}

@media (max-width: 640px) {
  .fln-pathways {
    padding: 14px;
  }

  .fln-pathways-grid {
    grid-template-columns: 1fr;
  }
}



  Understanding Year 12 and Vocational Pathways
  
    Queensland senior students can work towards different qualifications and training outcomes.
  

  
    
      QCE
      
        The Queensland Certificate of Education is the state's senior secondary qualification. Students must meet credit, literacy, numeracy and academic integrity requirements.
      
    

    
      VET
      
        Vocational education and training provides practical, nationally recognised qualifications in areas of study linked to work and further training.
      
    

    
      School-based apprenticeships and traineeships
      
        These combine paid employment and structured training with school studies, helping students gain workplace experience while working towards a qualification.
      
    
  

  
    Students may pursue different combinations of senior school subjects, vocational qualifications and workplace training. Requirements vary by qualification and training arrangement.
  





Alternative education expands across Queensland



The Parkinson campus is part of a wider network of alternative education providers supporting young people who may not thrive in mainstream school settings.



Independent Schools Queensland reported in November 2026 that enrolments in the state’s independent special assistance schools had increased seven-fold since 2016. The sector had grown from 14 schools to 31, with more than 11,000 students enrolled in 2025.



The figures relate specifically to independent special assistance schools, rather than every alternative education provider in Queensland.



Y Schools Queensland operates campuses across Brisbane, Logan, Ipswich, Redlands, Moreton Bay, Bundaberg and Toowoomba. Its Brisbane South program includes a junior campus in Acacia Ridge and the senior campus in Parkinson.



Students seeking a place at Y Schools must be referred and attend an interview so the school can assess their needs. Referrals may come from current or former school staff, health professionals and family support services. Students may be placed on a waiting list if their preferred year level is full.







Read: Residents Await Answers Over Closed Poinsettia Street Walkway







The Parkinson campus provides a senior schooling option built around flexible learning, formal qualifications and practical training. Its 2025 results show students pursuing several different pathways, while the attendance figures underline that supporting engagement remains an important part of the work.



Published 13-November-2026




]]></content:encoded>
</item><item>
<title><![CDATA[Inventions]]></title>
<link>https://forestlakenews.com.au/inventions</link>
<pubDate>Thu, 12 Nov 2026 19:16:35 +0000</pubDate>
<dc:creator><![CDATA[Forest Lake News]]></dc:creator>
<guid isPermaLink="true">https://forestlakenews.com.au/?page_id=14362</guid>
<description><![CDATA[]]></description>
<content:encoded><![CDATA[]]></content:encoded>
</item><item>
<title><![CDATA[Bat Warning Issued After Animal Found at Cascade Drive Park]]></title>
<link>https://forestlakenews.com.au/forest-lake-bat-warning-cascade-drive-park</link>
<media:content url="https://forestlakenews.com.au/wp-content/uploads/2026/11/FI-for-OMC-2026-11-12T102805.137.webp" medium="image"/>
<media:thumbnail url="https://forestlakenews.com.au/wp-content/uploads/2026/11/FI-for-OMC-2026-11-12T102805.137.webp"/>
<enclosure url="https://forestlakenews.com.au/wp-content/uploads/2026/11/FI-for-OMC-2026-11-12T102805.137.webp" length="229470" type="image/webp"/>
<pubDate>Thu, 12 Nov 2026 02:32:16 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[Australian Bat Lyssavirus]]></category>
<category><![CDATA[bats]]></category>
<category><![CDATA[Cascade Drive Park]]></category>
<category><![CDATA[Forest Lake]]></category>
<category><![CDATA[Metro South Health]]></category>
<category><![CDATA[public health]]></category>
<category><![CDATA[Queensland Health]]></category>
<dc:creator><![CDATA[Forest Lake News]]></dc:creator>
<guid isPermaLink="true">https://forestlakenews.com.au/?page_id=14351</guid>
<description><![CDATA[
Forest Lake residents are being urged to keep their distance from bats and flying foxes after an animal was found at Cascade Drive Park, prompting a public health warning from Metro South Health.







Read: Forest Lake Being Monitored After Recent Fish Kill of Unknown Cause







The bat was found at about 3pm on Sunday, November 8, at the park off Kondalilla Parade. Metro South Health's Public Health Unit said the animal's health status was unclear, but warned that any Australian bat could potentially carry Australian Bat Lyssavirus (ABLV).



The November 11 warning comes amid increased bat activity and more reports of interactions between people and bats. Although the risk to the broader community is considered low, anyone who had direct contact with the animal has been advised to call 13 HEALTH on 13 43 25 84 as soon as possible for an assessment.



Photo credit: Pexels/Stuart Robinson



Residents are also being reminded not to touch or pick up bats, even when the animals appear sick, injured or unable to fly. Metro South Health public health doctor Dr Ben Brimblecombe said people could be exposed to ABLV when they attempted to handle bats. The animals may be encountered in residential areas, backyards and public places, making it important to leave them undisturbed.



Parents are being encouraged to explain the risks to children and make sure they know not to approach or handle bats. Children who are bitten or scratched should tell a parent, teacher or another responsible adult immediately. Dr Brimblecombe also stressed that children should not be afraid of getting into trouble if they report an encounter with a bat.



Why health officials are concerned



Australian Bat Lyssavirus is closely related to the rabies virus and can cause a serious illness affecting the nervous system. According to the Australian Centre for Disease Control, human ABLV infections are rare, but the disease is almost always fatal once symptoms develop.



The virus is transmitted when saliva from an infected bat enters the body. This can happen through a bite or scratch, contact with broken skin, or exposure to the eyes, nose or mouth.



Early symptoms can resemble the flu, with fever, fatigue, headaches, loss of appetite and pain or weakness around the site of infection. More severe symptoms can include paralysis, delirium and seizures.



Symptoms may take weeks or months to appear and, in some cases, can develop several years after exposure. Anyone who may have been exposed should therefore seek medical attention immediately rather than waiting for signs of illness.



What to do after contact with a bat



Photo credit: Pexels/Kampus Production



Queensland Health advises anyone bitten or scratched by a bat to wash the affected area gently and thoroughly with soap and clean water for at least 15 minutes. An antiseptic with antiviral properties should be applied afterwards, if available, and urgent medical assessment should follow.



People who get bat saliva in their eyes, nose or mouth should flush the affected area with water for several minutes before seeking urgent medical attention.



Previous rabies vaccination does not remove the need for assessment. Additional post-exposure treatment may still be necessary, depending on the circumstances.







Read: Forest Lake Residents Petition To Return Lake To Its Former Beauty







Residents who encounter an injured bat or flying fox should not attempt to rescue or transport it themselves. Metro South Health recommends contacting the RSPCA on 1300 ANIMAL or a local wildlife care group.



Queensland Health advises that only trained and vaccinated handlers with appropriate protective equipment should handle bats. The warning does not mean residents need to avoid outdoor areas where bats are present. The important distinction is to leave the animals alone and seek prompt medical advice if direct exposure occurs.




.bat-warning-box {
  border: 1px solid #d5dce3;
  border-radius: 8px;
  padding: 18px;
  margin: 22px 0;
  background: #f7f9fb;
  color: #202a35;
  font-family: Arial, sans-serif;
  line-height: 1.6;
}
.bat-warning-box h3 {
  margin: 0 0 14px;
  font-size: 20px;
}
.bat-warning-box h4 {
  margin: 15px 0 5px;
  font-size: 15px;
}
.bat-warning-box ul {
  padding-left: 20px;
  margin: 5px 0;
}
.bat-warning-box li {
  margin-bottom: 5px;
}
.bat-warning-box p {
  margin: 8px 0;
}



  Bat Contact: What Forest Lake Residents Should Know

  If you have had direct contact with a bat
  
    Call 13 HEALTH on 13 43 25 84.
    Wash bites or scratches with soap and clean water for at least 15 minutes.
    Apply an antiseptic with antiviral properties, if available.
    Seek urgent medical attention.
  

  If bat saliva enters your eyes, nose or mouth
  
    Flush the affected area with water for several minutes.
    Seek urgent medical attention.
  

  If you find an injured bat
  
    Do not touch or attempt to rescue it.
    Contact the RSPCA on 1300 ANIMAL or a local wildlife care group.
  

  Important: Only trained and vaccinated handlers
  should handle bats.




Published 12-November-2026
]]></description>
<content:encoded><![CDATA[
Forest Lake residents are being urged to keep their distance from bats and flying foxes after an animal was found at Cascade Drive Park, prompting a public health warning from Metro South Health.







Read: Forest Lake Being Monitored After Recent Fish Kill of Unknown Cause







The bat was found at about 3pm on Sunday, November 8, at the park off Kondalilla Parade. Metro South Health's Public Health Unit said the animal's health status was unclear, but warned that any Australian bat could potentially carry Australian Bat Lyssavirus (ABLV).



The November 11 warning comes amid increased bat activity and more reports of interactions between people and bats. Although the risk to the broader community is considered low, anyone who had direct contact with the animal has been advised to call 13 HEALTH on 13 43 25 84 as soon as possible for an assessment.



Photo credit: Pexels/Stuart Robinson



Residents are also being reminded not to touch or pick up bats, even when the animals appear sick, injured or unable to fly. Metro South Health public health doctor Dr Ben Brimblecombe said people could be exposed to ABLV when they attempted to handle bats. The animals may be encountered in residential areas, backyards and public places, making it important to leave them undisturbed.



Parents are being encouraged to explain the risks to children and make sure they know not to approach or handle bats. Children who are bitten or scratched should tell a parent, teacher or another responsible adult immediately. Dr Brimblecombe also stressed that children should not be afraid of getting into trouble if they report an encounter with a bat.



Why health officials are concerned



Australian Bat Lyssavirus is closely related to the rabies virus and can cause a serious illness affecting the nervous system. According to the Australian Centre for Disease Control, human ABLV infections are rare, but the disease is almost always fatal once symptoms develop.



The virus is transmitted when saliva from an infected bat enters the body. This can happen through a bite or scratch, contact with broken skin, or exposure to the eyes, nose or mouth.



Early symptoms can resemble the flu, with fever, fatigue, headaches, loss of appetite and pain or weakness around the site of infection. More severe symptoms can include paralysis, delirium and seizures.



Symptoms may take weeks or months to appear and, in some cases, can develop several years after exposure. Anyone who may have been exposed should therefore seek medical attention immediately rather than waiting for signs of illness.



What to do after contact with a bat



Photo credit: Pexels/Kampus Production



Queensland Health advises anyone bitten or scratched by a bat to wash the affected area gently and thoroughly with soap and clean water for at least 15 minutes. An antiseptic with antiviral properties should be applied afterwards, if available, and urgent medical assessment should follow.



People who get bat saliva in their eyes, nose or mouth should flush the affected area with water for several minutes before seeking urgent medical attention.



Previous rabies vaccination does not remove the need for assessment. Additional post-exposure treatment may still be necessary, depending on the circumstances.







Read: Forest Lake Residents Petition To Return Lake To Its Former Beauty







Residents who encounter an injured bat or flying fox should not attempt to rescue or transport it themselves. Metro South Health recommends contacting the RSPCA on 1300 ANIMAL or a local wildlife care group.



Queensland Health advises that only trained and vaccinated handlers with appropriate protective equipment should handle bats. The warning does not mean residents need to avoid outdoor areas where bats are present. The important distinction is to leave the animals alone and seek prompt medical advice if direct exposure occurs.




.bat-warning-box {
  border: 1px solid #d5dce3;
  border-radius: 8px;
  padding: 18px;
  margin: 22px 0;
  background: #f7f9fb;
  color: #202a35;
  font-family: Arial, sans-serif;
  line-height: 1.6;
}
.bat-warning-box h3 {
  margin: 0 0 14px;
  font-size: 20px;
}
.bat-warning-box h4 {
  margin: 15px 0 5px;
  font-size: 15px;
}
.bat-warning-box ul {
  padding-left: 20px;
  margin: 5px 0;
}
.bat-warning-box li {
  margin-bottom: 5px;
}
.bat-warning-box p {
  margin: 8px 0;
}



  Bat Contact: What Forest Lake Residents Should Know

  If you have had direct contact with a bat
  
    Call 13 HEALTH on 13 43 25 84.
    Wash bites or scratches with soap and clean water for at least 15 minutes.
    Apply an antiseptic with antiviral properties, if available.
    Seek urgent medical attention.
  

  If bat saliva enters your eyes, nose or mouth
  
    Flush the affected area with water for several minutes.
    Seek urgent medical attention.
  

  If you find an injured bat
  
    Do not touch or attempt to rescue it.
    Contact the RSPCA on 1300 ANIMAL or a local wildlife care group.
  

  Important: Only trained and vaccinated handlers
  should handle bats.




Published 12-November-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Heavy Rain Floods Brisbane Roads as More Storms Threaten South East Queensland]]></title>
<link>https://forestlakenews.com.au/brisbane-roads-flood-more-storms-south-east-queensland/brisbane-roads-flood-more-storms-south-east-queensland</link>
<media:content url="https://forestlakenews.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires.png" medium="image"/>
<media:thumbnail url="https://forestlakenews.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires.png"/>
<enclosure url="https://forestlakenews.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires.png" length="1832827" type="image/png"/>
<pubDate>Thu, 12 Nov 2026 02:03:42 +0000</pubDate>
<dc:creator><![CDATA[Forest Lake News]]></dc:creator>
<guid isPermaLink="true">https://forestlakenews.com.au/brisbane-roads-flood-more-storms-south-east-queensland/</guid>
<description><![CDATA[


Heavy rain has flooded roads across parts of Brisbane as residents in Moreton Bay, Redlands and surrounding South East Queensland communities prepare for another round of potentially severe thunderstorms following Wednesday's destructive weather.



The Bureau of Meteorology has warned that further storms could develop on Thursday, 12 November, bringing damaging winds, large hail and heavy rainfall capable of causing flash flooding.



The renewed threat comes as emergency crews continue clearing fallen trees, repairing damaged powerlines and responding to storm-related property damage. More than 80,000 homes and businesses across South East Queensland lost electricity at the height of Wednesday's storms, with tens of thousands still without power on Thursday morning.



Brisbane, Redlands and Moreton Bay were all affected by intense storm activity, with rainfall observations showing how quickly conditions deteriorated across southern and eastern suburbs.



Intense rainfall floods Brisbane streets



Some of Wednesday's heaviest rainfall was recorded in Brisbane's southern and eastern suburbs, where intense downpours delivered substantial amounts of rain in just half an hour.



Bureau of Meteorology observations recorded 78 millimetres at Wishart in the 30 minutes to 4:39 p.m., while Chandler received 75 millimetres in the 30 minutes to 4:52 p.m. Nearby Burbank recorded 59 millimetres over a similar period.



The short, intense bursts of rainfall created flash-flooding hazards on local roads and placed additional pressure on drainage systems.&nbsp;



In Gumdale, Formosa Road was closed to through traffic between Stanbrough Road and Dairy Swamp Road because of flash flooding. Emergency crews were also called to Gumdale on Wednesday evening after a vehicle became stranded in floodwater. Swiftwater rescue personnel assisted the driver to safety.



Elsewhere in Brisbane, a falling tree struck two vehicles on Logan Road at Eight Mile Plains as severe winds swept through the area.



Brisbane Airport recorded a wind gust of 96 kilometres per hour at 5:03 p.m. on Wednesday, with the severe weather causing flight delays, cancellations and temporary operational disruption.



Motorists are being urged to check road conditions before travelling, particularly in areas affected by heavy rain and fallen trees. Road restrictions may be lifted or introduced as conditions change.




BRISBANE EMERGENCY DASHBOARD








Redlands hit by heavy rain as storms move towards the bay



Redlands also experienced intense rainfall as Wednesday's thunderstorms moved across eastern Brisbane and towards Moreton Bay.



The Bureau recorded 75 millimetres of rain at Leslie Harrison Dam in the 30 minutes to 4:47 p.m., placing the area among the locations that experienced the most intense short-duration rainfall during the event.



At 5:19 p.m., the Bureau issued a severe thunderstorm warning covering parts of Redland City, Brisbane and Moreton Bay. Storms detected around Ormiston and Brisbane Airport were capable of producing damaging winds and heavy rainfall that could lead to flash flooding.



Cleveland, Victoria Point, Ormiston and nearby islands were among the locations identified in warnings as the storms developed during the afternoon.



The State Emergency Service received 16 requests for assistance across Redlands following Wednesday's weather, adding to hundreds of calls received throughout South East Queensland.



Residents in Cleveland, Capalaba, Wellington Point, Victoria Point and surrounding suburbs can check the Redlands Coast Disaster Dashboard for local warnings, road closures, electricity interruptions and emergency information.




REDLANDS COAST DISASTER DASHBOARD








The dashboard also provides evacuation information when relevant. No widespread evacuation order affecting Redlands has been established in the reports reviewed for this article.



Moreton Bay suburbs face further storm threat



Communities across Moreton Bay were also within the path of Wednesday's severe weather, with storm cells developing near Caboolture and Burpengary before moving towards the coast.



The Bureau's afternoon warnings identified conditions capable of producing damaging winds, large hail and intense rainfall across parts of the Moreton Bay region.



By early evening, the warning area extended towards the waters off Redcliffe, with Redcliffe and Scarborough among the locations forecast to be affected as the storms moved north and northeast.



Electricity interruptions were reported across the wider Moreton Bay region during Wednesday's severe weather, although the largest concentration of damage to the Energex network occurred further south in Logan and the Scenic Rim.



For residents in Caboolture, Morayfield, Burpengary, North Lakes, Redcliffe and neighbouring suburbs, the City of Moreton Bay Disaster Dashboard provides a central source of local emergency updates.




CITY OF MORETON BAY DISASTER DASHBOARD








The council's dashboard includes weather warnings, road conditions, power outages and information about emergency facilities and available disaster support services.



Residents should continue checking official updates, particularly where local roads, waterways or properties remain vulnerable to another period of heavy rainfall.



Electricity restoration continues across the south-east



Restoring electricity remains one of the largest recovery operations following Wednesday's storms, with widespread damage to powerlines, poles and other infrastructure.



Energex reported more than 400 sections of powerline brought down across South East Queensland, while more than 120,000 lightning strikes were recorded during the severe weather.



The worst electrical damage was concentrated in Logan and the Scenic Rim, where falling trees and damaged infrastructure left tens of thousands of properties disconnected.



By Thursday morning, approximately 55,000 properties across the region remained without power, according to ABC News reporting based on Energex information. Repair crews were being reinforced as assessments identified damaged poles and lines requiring replacement.



Some customers may face prolonged interruptions, particularly where access is obstructed or major infrastructure repairs are required.



Residents in Brisbane, Redlands and Moreton Bay can use the Energex Outage Finder to check reported power interruptions, affected locations and available restoration estimates.




ENERGEX OUTAGE FINDER








Energex has warned residents to remain clear of fallen electrical wires and to treat damaged powerlines as live. Electrical emergencies can be reported on 13 19 62.



School closures and transport disruption



Wednesday's storms also disrupted education across South East Queensland, with schools in the hardest-hit districts unable to operate normally because of damage and electricity interruptions.



Eleven state schools in the Logan City Council area were reported closed on Thursday morning, including campuses in Marsden, Crestmead, Jimboomba and Yarrabilba. Subsequent reporting placed the number of affected schools in the broader Logan and Jimboomba area at 13.



Within Brisbane, Mansfield State School cancelled a prep orientation session after experiencing telephone and internet disruption.



Parents across Brisbane, Moreton Bay and Redlands can check the Queensland Government's current emergency school closures register for information about affected state, independent and Catholic schools.




QLD SCHOOL CLOSURES








The register should be checked before travelling, as schools may reopen once power, access and safety conditions have been assessed. Families should also consult their school's own communications for local arrangements.



Transport disruption has extended beyond flooded roads. Brisbane Airport experienced delays and cancellations during Wednesday's storms, while local road hazards included fallen branches, damaged traffic infrastructure and standing water.



Drivers can check QLDTraffic or the Transport and Main Roads Road Status Update for restrictions affecting state-controlled roads. Council emergency dashboards provide additional local information.




TMR ROAD STATUS UPDATE








Emergency crews respond to hundreds of calls



The State Emergency Service received more than 320 requests for assistance across South East Queensland after Wednesday's storms.



Logan accounted for the majority of the calls, but emergency crews were also deployed across Brisbane, Redlands and other affected areas.



The requests largely involved fallen trees, damaged roofs, blocked access to properties and other storm-related hazards. Brisbane recorded 41 requests, while Redlands recorded 16.



Emergency workers have been clearing debris, securing damaged structures and helping residents protect properties exposed to further rainfall.



Authorities are also urging residents to avoid floodwater and stay away from fallen electrical infrastructure. Even shallow floodwater can conceal damaged road surfaces, debris and strong currents.



More severe thunderstorms possible



The Bureau of Meteorology has forecast another period of unsettled weather across South East Queensland on Thursday, with severe thunderstorms possible from the Gold Coast through Brisbane and the Sunshine Coast towards Bundaberg.



Forecasters have identified damaging winds, large hail and heavy rainfall leading to flash flooding as the main hazards.



The threat is particularly concerning for communities still dealing with damaged buildings, blocked access and electricity interruptions from Wednesday's storms.



Storm activity may ease in some districts on Friday before increasing again over the weekend as another weather system develops across inland Queensland.



Residents should monitor the Bureau of Meteorology's Queensland warnings and check their local council's emergency information before making travel plans.




BOM QUEENSLAND WARNINGS









  What residents should do
  
    Check weather warnings before travelling
    Avoid flooded roads and never drive through floodwater
    Stay clear of fallen powerlines
    Charge phones and devices while power is available
    Secure loose outdoor items where safe
    Call SES on 132 500 for non-life-threatening storm damage
    Call 000 in a life-threatening emergency
  




Published 12-Nov-2026
]]></description>
<content:encoded><![CDATA[


Heavy rain has flooded roads across parts of Brisbane as residents in Moreton Bay, Redlands and surrounding South East Queensland communities prepare for another round of potentially severe thunderstorms following Wednesday's destructive weather.



The Bureau of Meteorology has warned that further storms could develop on Thursday, 12 November, bringing damaging winds, large hail and heavy rainfall capable of causing flash flooding.



The renewed threat comes as emergency crews continue clearing fallen trees, repairing damaged powerlines and responding to storm-related property damage. More than 80,000 homes and businesses across South East Queensland lost electricity at the height of Wednesday's storms, with tens of thousands still without power on Thursday morning.



Brisbane, Redlands and Moreton Bay were all affected by intense storm activity, with rainfall observations showing how quickly conditions deteriorated across southern and eastern suburbs.



Intense rainfall floods Brisbane streets



Some of Wednesday's heaviest rainfall was recorded in Brisbane's southern and eastern suburbs, where intense downpours delivered substantial amounts of rain in just half an hour.



Bureau of Meteorology observations recorded 78 millimetres at Wishart in the 30 minutes to 4:39 p.m., while Chandler received 75 millimetres in the 30 minutes to 4:52 p.m. Nearby Burbank recorded 59 millimetres over a similar period.



The short, intense bursts of rainfall created flash-flooding hazards on local roads and placed additional pressure on drainage systems.&nbsp;



In Gumdale, Formosa Road was closed to through traffic between Stanbrough Road and Dairy Swamp Road because of flash flooding. Emergency crews were also called to Gumdale on Wednesday evening after a vehicle became stranded in floodwater. Swiftwater rescue personnel assisted the driver to safety.



Elsewhere in Brisbane, a falling tree struck two vehicles on Logan Road at Eight Mile Plains as severe winds swept through the area.



Brisbane Airport recorded a wind gust of 96 kilometres per hour at 5:03 p.m. on Wednesday, with the severe weather causing flight delays, cancellations and temporary operational disruption.



Motorists are being urged to check road conditions before travelling, particularly in areas affected by heavy rain and fallen trees. Road restrictions may be lifted or introduced as conditions change.




BRISBANE EMERGENCY DASHBOARD








Redlands hit by heavy rain as storms move towards the bay



Redlands also experienced intense rainfall as Wednesday's thunderstorms moved across eastern Brisbane and towards Moreton Bay.



The Bureau recorded 75 millimetres of rain at Leslie Harrison Dam in the 30 minutes to 4:47 p.m., placing the area among the locations that experienced the most intense short-duration rainfall during the event.



At 5:19 p.m., the Bureau issued a severe thunderstorm warning covering parts of Redland City, Brisbane and Moreton Bay. Storms detected around Ormiston and Brisbane Airport were capable of producing damaging winds and heavy rainfall that could lead to flash flooding.



Cleveland, Victoria Point, Ormiston and nearby islands were among the locations identified in warnings as the storms developed during the afternoon.



The State Emergency Service received 16 requests for assistance across Redlands following Wednesday's weather, adding to hundreds of calls received throughout South East Queensland.



Residents in Cleveland, Capalaba, Wellington Point, Victoria Point and surrounding suburbs can check the Redlands Coast Disaster Dashboard for local warnings, road closures, electricity interruptions and emergency information.




REDLANDS COAST DISASTER DASHBOARD








The dashboard also provides evacuation information when relevant. No widespread evacuation order affecting Redlands has been established in the reports reviewed for this article.



Moreton Bay suburbs face further storm threat



Communities across Moreton Bay were also within the path of Wednesday's severe weather, with storm cells developing near Caboolture and Burpengary before moving towards the coast.



The Bureau's afternoon warnings identified conditions capable of producing damaging winds, large hail and intense rainfall across parts of the Moreton Bay region.



By early evening, the warning area extended towards the waters off Redcliffe, with Redcliffe and Scarborough among the locations forecast to be affected as the storms moved north and northeast.



Electricity interruptions were reported across the wider Moreton Bay region during Wednesday's severe weather, although the largest concentration of damage to the Energex network occurred further south in Logan and the Scenic Rim.



For residents in Caboolture, Morayfield, Burpengary, North Lakes, Redcliffe and neighbouring suburbs, the City of Moreton Bay Disaster Dashboard provides a central source of local emergency updates.




CITY OF MORETON BAY DISASTER DASHBOARD








The council's dashboard includes weather warnings, road conditions, power outages and information about emergency facilities and available disaster support services.



Residents should continue checking official updates, particularly where local roads, waterways or properties remain vulnerable to another period of heavy rainfall.



Electricity restoration continues across the south-east



Restoring electricity remains one of the largest recovery operations following Wednesday's storms, with widespread damage to powerlines, poles and other infrastructure.



Energex reported more than 400 sections of powerline brought down across South East Queensland, while more than 120,000 lightning strikes were recorded during the severe weather.



The worst electrical damage was concentrated in Logan and the Scenic Rim, where falling trees and damaged infrastructure left tens of thousands of properties disconnected.



By Thursday morning, approximately 55,000 properties across the region remained without power, according to ABC News reporting based on Energex information. Repair crews were being reinforced as assessments identified damaged poles and lines requiring replacement.



Some customers may face prolonged interruptions, particularly where access is obstructed or major infrastructure repairs are required.



Residents in Brisbane, Redlands and Moreton Bay can use the Energex Outage Finder to check reported power interruptions, affected locations and available restoration estimates.




ENERGEX OUTAGE FINDER








Energex has warned residents to remain clear of fallen electrical wires and to treat damaged powerlines as live. Electrical emergencies can be reported on 13 19 62.



School closures and transport disruption



Wednesday's storms also disrupted education across South East Queensland, with schools in the hardest-hit districts unable to operate normally because of damage and electricity interruptions.



Eleven state schools in the Logan City Council area were reported closed on Thursday morning, including campuses in Marsden, Crestmead, Jimboomba and Yarrabilba. Subsequent reporting placed the number of affected schools in the broader Logan and Jimboomba area at 13.



Within Brisbane, Mansfield State School cancelled a prep orientation session after experiencing telephone and internet disruption.



Parents across Brisbane, Moreton Bay and Redlands can check the Queensland Government's current emergency school closures register for information about affected state, independent and Catholic schools.




QLD SCHOOL CLOSURES








The register should be checked before travelling, as schools may reopen once power, access and safety conditions have been assessed. Families should also consult their school's own communications for local arrangements.



Transport disruption has extended beyond flooded roads. Brisbane Airport experienced delays and cancellations during Wednesday's storms, while local road hazards included fallen branches, damaged traffic infrastructure and standing water.



Drivers can check QLDTraffic or the Transport and Main Roads Road Status Update for restrictions affecting state-controlled roads. Council emergency dashboards provide additional local information.




TMR ROAD STATUS UPDATE








Emergency crews respond to hundreds of calls



The State Emergency Service received more than 320 requests for assistance across South East Queensland after Wednesday's storms.



Logan accounted for the majority of the calls, but emergency crews were also deployed across Brisbane, Redlands and other affected areas.



The requests largely involved fallen trees, damaged roofs, blocked access to properties and other storm-related hazards. Brisbane recorded 41 requests, while Redlands recorded 16.



Emergency workers have been clearing debris, securing damaged structures and helping residents protect properties exposed to further rainfall.



Authorities are also urging residents to avoid floodwater and stay away from fallen electrical infrastructure. Even shallow floodwater can conceal damaged road surfaces, debris and strong currents.



More severe thunderstorms possible



The Bureau of Meteorology has forecast another period of unsettled weather across South East Queensland on Thursday, with severe thunderstorms possible from the Gold Coast through Brisbane and the Sunshine Coast towards Bundaberg.



Forecasters have identified damaging winds, large hail and heavy rainfall leading to flash flooding as the main hazards.



The threat is particularly concerning for communities still dealing with damaged buildings, blocked access and electricity interruptions from Wednesday's storms.



Storm activity may ease in some districts on Friday before increasing again over the weekend as another weather system develops across inland Queensland.



Residents should monitor the Bureau of Meteorology's Queensland warnings and check their local council's emergency information before making travel plans.




BOM QUEENSLAND WARNINGS









  What residents should do
  
    Check weather warnings before travelling
    Avoid flooded roads and never drive through floodwater
    Stay clear of fallen powerlines
    Charge phones and devices while power is available
    Secure loose outdoor items where safe
    Call SES on 132 500 for non-life-threatening storm damage
    Call 000 in a life-threatening emergency
  




Published 12-Nov-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Queensland E-Bike Assurance Scheme: What Owners Need to Know]]></title>
<link>https://forestlakenews.com.au/queensland-e-bike-assurance-scheme-inspection-centres-2026/queensland-e-bike-assurance-scheme-inspection-centres-2026</link>
<media:content url="https://forestlakenews.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes.png" medium="image"/>
<media:thumbnail url="https://forestlakenews.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes.png"/>
<enclosure url="https://forestlakenews.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes.png" length="1452970" type="image/png"/>
<pubDate>Wed, 11 Nov 2026 03:16:28 +0000</pubDate>
<dc:creator><![CDATA[Forest Lake News]]></dc:creator>
<guid isPermaLink="true">https://forestlakenews.com.au/queensland-e-bike-assurance-scheme-inspection-centres-2026/</guid>
<description><![CDATA[


Queensland e-bike owners facing new compliance requirements have only nine authorised inspection centres available statewide, with no locations currently listed in several major regional cities.



The Electrically Power-Assisted Cycle (EPAC) Assurance Scheme commenced on 2 November 2026, allowing owners of eligible older e-bikes to have their devices inspected and approved for continued legal use. However, the initial network consists entirely of Trek bicycle stores, most of them concentrated in south-east Queensland.



The state's official directory of authorised verifiers lists three centres in Brisbane, two on the Gold Coast, and one each in Ipswich, Moreton Bay, the Sunshine Coast and Rockhampton. There are no authorised locations currently listed in Townsville, Cairns, Toowoomba or Mackay.



Owners requiring verification must book an appointment and bring their e-bike to an approved retailer. The Department of Transport and Main Roads advises that appointments may take a couple of weeks, depending on individual store capacity.



The department expects additional retailers to join the program over the coming months. Alternative arrangements are also being developed for rural and remote residents without reasonable access to a verifier, with further details expected in early 2027.



Which e-bikes need inspection?



The scheme primarily covers eligible e-bikes manufactured before 1 July 2026 that do not meet the European EN 15194 standard or lack the required compliance label.



To qualify, these older bicycles must have pedals as their primary source of power, a maximum continuous rated motor output of 250 watts, and motor assistance that stops at 25 km/h. Where throttle control is fitted, throttle-only assistance must be limited to 6 km/h to help riders start moving.



Devices must also satisfy other technical and safety requirements before an authorised retailer can approve them. E-bikes that already meet EN 15194 and display the required compliance label do not need another inspection.



For eligible older bicycles, the initial pre-screening is free. A formal assessment may cost up to $50, with a further $20 permitted for issuing a permanent compliance label and recording the verification.



Owners covered by the transition arrangements have until 28 February 2027 to obtain the required label. From 1 March 2027, e-bikes that need verification must display the appropriate compliance label to continue being ridden legally in public.



The scheme cannot be used to legalise high-powered, high-speed or illegally modified devices. It also provides a separate pathway for certain e-bikes and e-trikes designed or adapted for people with disabilities or medical conditions.



A label issued through the scheme confirms that an eligible device has met Queensland's verification requirements. It does not certify full compliance with the European EN 15194 standard.






  
    Queensland E-Bike Inspections: What Owners Need to Know
  

  
    Queensland's new EPAC Assurance Scheme allows eligible older e-bikes to be inspected and approved for continued legal use.
  

  
    Scheme commenced: 2 November 2026
    Compliance deadline: 28 February 2027
    Initial screening: Free
    Formal inspection: Up to $50
    Compliance label: Up to $20
    Total possible cost: $70
    Authorised locations: Nine across Queensland at launch
    Already compliant? E-bikes meeting EN 15194 and displaying the required label do not need another inspection.
    Bookings: Appointments must be arranged with an authorised retailer.
  

  
    Important: The scheme does not legalise high-powered, high-speed or illegally modified devices.
  

  
    Source:
    
      Queensland Department of Transport and Main Roads – EPAC Assurance Scheme
    
  






Cycling advocates highlight the cost of compliance



Bicycle Queensland has supported clearer rules distinguishing lawful pedal-assisted bicycles from illegal high-powered devices, while the cost and accessibility of verification remain concerns for cycling advocates.



In its published explanation of the new laws, the organisation outlines the inspection process and the potential $70 charge facing owners whose existing bicycles require verification.



The fee applies to the formal assessment and labelling process rather than every e-bike owner. Riders whose bicycles already carry the correct EN 15194 label are not required to pay for another inspection.



The limited number of participating retailers also presents a practical question for people living far from an inspection centre, particularly those who rely on their e-bikes for everyday transport.



Bicycle Industries Australia has welcomed the scheme. Its general manager, Peter Bourke, has supported measures that help riders access safe, legal products and said the program would allow bicycle businesses to assist owners in establishing whether their devices meet Queensland's requirements.



The Department of Transport and Main Roads has described the scheme as a practical way for owners of legitimate existing e-bikes to continue riding, while keeping dangerous high-powered and high-speed devices off public roads and paths.



Research shows e-bikes are used across Queensland



The availability of inspection centres takes on wider significance when considered alongside new research into the growing number of Queenslanders using electric bicycles and other e-mobility devices.



A University of Queensland study, released on 21 October 2026, estimated that Queenslanders owned approximately 587,000 e-bikes, accounting for 61 per cent of privately owned e-mobility devices. The study also estimated 352,100 e-scooters and 30,400 other devices.



Researchers found that one in three Queensland households owned an e-mobility device, with total household spending on the devices estimated at $2.2 billion. Ownership was not confined to metropolitan areas. The study found that 28 per cent of households in remote Queensland reported owning an e-mobility device, reinforcing the importance of access to transport options outside major cities.



For one in four e-mobility users surveyed, a private car was their only alternative means of transport. More than half of the primary users of privately owned devices were aged 50 or older. The findings point to the role electric transport now plays in everyday travel, from commuting and shopping to recreation and maintaining independence.



However, the estimated 587,000 e-bikes do not represent the number requiring inspection under the new scheme. Many already meet the relevant standards, while others may be ineligible for verification.



The research also identified safety concerns. About half of privately owned e-mobility devices were classified as non-compliant based on owners' self-reported speed, motor power and throttle characteristics.



Researchers cautioned that the findings covered different types of e-mobility devices and did not establish how many existing e-bikes would require inspection or replacement compliance labels.



Safety reforms target illegal high-powered devices



The assurance scheme forms part of Queensland's broader e-mobility reforms, introduced amid concerns about serious injuries, unsafe riding and devices capable of travelling well beyond the permitted limits.



New rules introduced during 2026 include restrictions on motor power and speed, tighter age and licensing requirements, and expanded police enforcement powers.



Under the state's current e-bike rules, bicycles powered by motors exceeding 250 watts of maximum continuous rated output cannot legally be ridden on public roads or paths as ordinary e-bikes. Devices that depend entirely on throttle power, rather than pedalling, are also prohibited, apart from the limited starting assistance permitted under the rules. Police can issue significant fines and seize illegal devices.



Transport authorities say the verification process is intended to distinguish suitable older bicycles from machines that fail the state's safety requirements. The scheme gives owners of qualifying existing e-bikes a means of keeping their bicycles on the road without requiring them to meet every provision of the European standard introduced for newer devices.



Where owners can get their e-bikes checked



As of 11 November 2026, the Queensland Government lists nine authorised inspection centres, all operated by Trek Bicycle.



RegionAuthorised inspection centreBrisbaneTrek CarindaleBrisbaneTrek WindsorBrisbaneTrek WoolloongabbaIpswichTrek Ipswich, East IpswichMoreton BayTrek North LakesGold CoastTrek Ashmore, MolendinarGold CoastTrek Burleigh HeadsSunshine CoastTrek Sunshine Coast, MinyamaCentral QueenslandTrek Rockhampton, Norman Gardens



Source: Queensland Department of Transport and Main Roads, EPAC Assurance Scheme authorised verifier directory. The government has advised owners to check the directory regularly as more retailers join the scheme.



Owners must contact an authorised retailer to arrange an inspection before visiting. The department recommends bringing any available information about the bicycle's make, model, purchase date and technical specifications.



For eligible riders whose bicycles still need verification, the transition period provides an opportunity to arrange an inspection before the February deadline. Whether the expanding network reaches more regional communities before then remains an important question as the scheme progresses.



Published 10-Nov-2026Featured Image Credit: Brisbane City Council




]]></description>
<content:encoded><![CDATA[


Queensland e-bike owners facing new compliance requirements have only nine authorised inspection centres available statewide, with no locations currently listed in several major regional cities.



The Electrically Power-Assisted Cycle (EPAC) Assurance Scheme commenced on 2 November 2026, allowing owners of eligible older e-bikes to have their devices inspected and approved for continued legal use. However, the initial network consists entirely of Trek bicycle stores, most of them concentrated in south-east Queensland.



The state's official directory of authorised verifiers lists three centres in Brisbane, two on the Gold Coast, and one each in Ipswich, Moreton Bay, the Sunshine Coast and Rockhampton. There are no authorised locations currently listed in Townsville, Cairns, Toowoomba or Mackay.



Owners requiring verification must book an appointment and bring their e-bike to an approved retailer. The Department of Transport and Main Roads advises that appointments may take a couple of weeks, depending on individual store capacity.



The department expects additional retailers to join the program over the coming months. Alternative arrangements are also being developed for rural and remote residents without reasonable access to a verifier, with further details expected in early 2027.



Which e-bikes need inspection?



The scheme primarily covers eligible e-bikes manufactured before 1 July 2026 that do not meet the European EN 15194 standard or lack the required compliance label.



To qualify, these older bicycles must have pedals as their primary source of power, a maximum continuous rated motor output of 250 watts, and motor assistance that stops at 25 km/h. Where throttle control is fitted, throttle-only assistance must be limited to 6 km/h to help riders start moving.



Devices must also satisfy other technical and safety requirements before an authorised retailer can approve them. E-bikes that already meet EN 15194 and display the required compliance label do not need another inspection.



For eligible older bicycles, the initial pre-screening is free. A formal assessment may cost up to $50, with a further $20 permitted for issuing a permanent compliance label and recording the verification.



Owners covered by the transition arrangements have until 28 February 2027 to obtain the required label. From 1 March 2027, e-bikes that need verification must display the appropriate compliance label to continue being ridden legally in public.



The scheme cannot be used to legalise high-powered, high-speed or illegally modified devices. It also provides a separate pathway for certain e-bikes and e-trikes designed or adapted for people with disabilities or medical conditions.



A label issued through the scheme confirms that an eligible device has met Queensland's verification requirements. It does not certify full compliance with the European EN 15194 standard.






  
    Queensland E-Bike Inspections: What Owners Need to Know
  

  
    Queensland's new EPAC Assurance Scheme allows eligible older e-bikes to be inspected and approved for continued legal use.
  

  
    Scheme commenced: 2 November 2026
    Compliance deadline: 28 February 2027
    Initial screening: Free
    Formal inspection: Up to $50
    Compliance label: Up to $20
    Total possible cost: $70
    Authorised locations: Nine across Queensland at launch
    Already compliant? E-bikes meeting EN 15194 and displaying the required label do not need another inspection.
    Bookings: Appointments must be arranged with an authorised retailer.
  

  
    Important: The scheme does not legalise high-powered, high-speed or illegally modified devices.
  

  
    Source:
    
      Queensland Department of Transport and Main Roads – EPAC Assurance Scheme
    
  






Cycling advocates highlight the cost of compliance



Bicycle Queensland has supported clearer rules distinguishing lawful pedal-assisted bicycles from illegal high-powered devices, while the cost and accessibility of verification remain concerns for cycling advocates.



In its published explanation of the new laws, the organisation outlines the inspection process and the potential $70 charge facing owners whose existing bicycles require verification.



The fee applies to the formal assessment and labelling process rather than every e-bike owner. Riders whose bicycles already carry the correct EN 15194 label are not required to pay for another inspection.



The limited number of participating retailers also presents a practical question for people living far from an inspection centre, particularly those who rely on their e-bikes for everyday transport.



Bicycle Industries Australia has welcomed the scheme. Its general manager, Peter Bourke, has supported measures that help riders access safe, legal products and said the program would allow bicycle businesses to assist owners in establishing whether their devices meet Queensland's requirements.



The Department of Transport and Main Roads has described the scheme as a practical way for owners of legitimate existing e-bikes to continue riding, while keeping dangerous high-powered and high-speed devices off public roads and paths.



Research shows e-bikes are used across Queensland



The availability of inspection centres takes on wider significance when considered alongside new research into the growing number of Queenslanders using electric bicycles and other e-mobility devices.



A University of Queensland study, released on 21 October 2026, estimated that Queenslanders owned approximately 587,000 e-bikes, accounting for 61 per cent of privately owned e-mobility devices. The study also estimated 352,100 e-scooters and 30,400 other devices.



Researchers found that one in three Queensland households owned an e-mobility device, with total household spending on the devices estimated at $2.2 billion. Ownership was not confined to metropolitan areas. The study found that 28 per cent of households in remote Queensland reported owning an e-mobility device, reinforcing the importance of access to transport options outside major cities.



For one in four e-mobility users surveyed, a private car was their only alternative means of transport. More than half of the primary users of privately owned devices were aged 50 or older. The findings point to the role electric transport now plays in everyday travel, from commuting and shopping to recreation and maintaining independence.



However, the estimated 587,000 e-bikes do not represent the number requiring inspection under the new scheme. Many already meet the relevant standards, while others may be ineligible for verification.



The research also identified safety concerns. About half of privately owned e-mobility devices were classified as non-compliant based on owners' self-reported speed, motor power and throttle characteristics.



Researchers cautioned that the findings covered different types of e-mobility devices and did not establish how many existing e-bikes would require inspection or replacement compliance labels.



Safety reforms target illegal high-powered devices



The assurance scheme forms part of Queensland's broader e-mobility reforms, introduced amid concerns about serious injuries, unsafe riding and devices capable of travelling well beyond the permitted limits.



New rules introduced during 2026 include restrictions on motor power and speed, tighter age and licensing requirements, and expanded police enforcement powers.



Under the state's current e-bike rules, bicycles powered by motors exceeding 250 watts of maximum continuous rated output cannot legally be ridden on public roads or paths as ordinary e-bikes. Devices that depend entirely on throttle power, rather than pedalling, are also prohibited, apart from the limited starting assistance permitted under the rules. Police can issue significant fines and seize illegal devices.



Transport authorities say the verification process is intended to distinguish suitable older bicycles from machines that fail the state's safety requirements. The scheme gives owners of qualifying existing e-bikes a means of keeping their bicycles on the road without requiring them to meet every provision of the European standard introduced for newer devices.



Where owners can get their e-bikes checked



As of 11 November 2026, the Queensland Government lists nine authorised inspection centres, all operated by Trek Bicycle.



RegionAuthorised inspection centreBrisbaneTrek CarindaleBrisbaneTrek WindsorBrisbaneTrek WoolloongabbaIpswichTrek Ipswich, East IpswichMoreton BayTrek North LakesGold CoastTrek Ashmore, MolendinarGold CoastTrek Burleigh HeadsSunshine CoastTrek Sunshine Coast, MinyamaCentral QueenslandTrek Rockhampton, Norman Gardens



Source: Queensland Department of Transport and Main Roads, EPAC Assurance Scheme authorised verifier directory. The government has advised owners to check the directory regularly as more retailers join the scheme.



Owners must contact an authorised retailer to arrange an inspection before visiting. The department recommends bringing any available information about the bicycle's make, model, purchase date and technical specifications.



For eligible riders whose bicycles still need verification, the transition period provides an opportunity to arrange an inspection before the February deadline. Whether the expanding network reaches more regional communities before then remains an important question as the scheme progresses.



Published 10-Nov-2026Featured Image Credit: Brisbane City Council




]]></content:encoded>
</item><item>
<title><![CDATA[Richlands P-Plater Issued $966 in Motorcycle Fines on Centenary Highway]]></title>
<link>https://forestlakenews.com.au/richlands-motorcycle-fines-centenary-highway</link>
<media:content url="https://forestlakenews.com.au/wp-content/uploads/2026/11/Motorcycle-Awareness-FI.png" medium="image"/>
<media:thumbnail url="https://forestlakenews.com.au/wp-content/uploads/2026/11/Motorcycle-Awareness-FI.png"/>
<enclosure url="https://forestlakenews.com.au/wp-content/uploads/2026/11/Motorcycle-Awareness-FI.png" length="939650" type="image/png"/>
<pubDate>Sun, 01 Nov 2026 23:46:28 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[Brisbane road safety]]></category>
<category><![CDATA[Centenary Highway]]></category>
<category><![CDATA[ichlands]]></category>
<category><![CDATA[motorcycle edge filtering]]></category>
<category><![CDATA[motorcycle fines]]></category>
<category><![CDATA[motorcycle lane filtering]]></category>
<category><![CDATA[Mount Ommaney Highway Patrol]]></category>
<category><![CDATA[provisional licence]]></category>
<category><![CDATA[Queensland Police]]></category>
<category><![CDATA[traffic infringements]]></category>
<dc:creator><![CDATA[Forest Lake News]]></dc:creator>
<guid isPermaLink="true">https://forestlakenews.com.au/?page_id=14318</guid>
<description><![CDATA[
A 22-year-old provisional motorcycle rider has been issued $966 in traffic infringement notices after police detected alleged unlawful filtering and road-line offences on the Centenary Highway near Richlands.



Read: Inala Road Upgrade Moves Forward After Years of Safety Concerns



The incident was among several motorcycle offences highlighted by the Queensland Police Service (QPS) on 31 October 2026, following a month of targeted enforcement across Brisbane during Motorcycle Awareness Month.



An officer from Mount Ommaney Highway Patrol spotted the rider allegedly filtering unlawfully through traffic before intercepting him. Police issued three infringement notices carrying a combined six demerit points.



Three infringements carry six demerit points



The rider received a $518 infringement and three demerit points for unlawful motorcycle edge filtering. A second infringement, carrying a $310 fine and three demerit points, was issued for crossing continuous lines beside a painted island.



Police also issued a $138 infringement for crossing a continuous line dividing lanes on a multi-lane road. The two road-line infringements are separate offences from unlawful motorcycle filtering.



The six demerit points could have significant consequences for the rider's provisional licence. Under Queensland's demerit point system, provisional licence holders who accumulate four or more points within a continuous 12-month period must choose between a three-month licence suspension and a 12-month good driving behaviour period.



Police have not disclosed the rider's previous demerit point balance or whether any licence sanction has been imposed.



Provisional riders prohibited from lane and edge filtering



Queensland allows fully licensed motorcyclists to filter through traffic under specific conditions, but learner and provisional licence holders are prohibited from both lane filtering and edge filtering.



Lane filtering involves riding between adjacent lanes of traffic travelling in the same direction. Eligible riders must travel at no more than 30 km/h and only undertake the manoeuvre when it is safe.



Edge filtering involves riding along a road shoulder or emergency stopping lane to pass stationary or slow-moving traffic. It is permitted only for eligible riders on roads with a speed limit of at least 90 km/h, subject to additional restrictions.



Motorcyclists cannot legally edge filter through tunnels or roadworks, use unsealed shoulders or undertake the manoeuvre when conditions make it unsafe.



Lane filtering is also prohibited in operating school zones and areas where filtering restrictions apply. Queensland's road rules restrict both forms of filtering to riders holding an open motorcycle licence.



Brisbane police to maintain motorcycle enforcement



South Brisbane District Inspector Mat Kelly said motorcycle enforcement would continue beyond October, with officers targeting speeding, unlawful filtering and other dangerous riding behaviour.



Police had detected riders crossing double lines, operating motorcycles dangerously and travelling without appropriate protective clothing, including gloves, jackets and protective trousers.



Inspector Kelly also raised concerns about riders failing to adjust their speed to changing weather and road conditions. Heavy rain, reduced visibility and slower traffic could make travelling at the posted speed limit unsafe.



Queensland Police will continue stationary and mobile enforcement activities across Brisbane. Officers have also warned that riders who fail to stop when directed may face further investigation, with police pursuing alleged offenders after the initial incident.



Read: QPS Confirms Legitimacy of ‘Fake’ Richlands Parking Ticket



The enforcement campaign comes amid continuing concerns about motorcycle crashes, with riders facing a greater risk of serious injury because they have less physical protection than occupants of passenger vehicles.



Published 31-Oct-2026




]]></description>
<content:encoded><![CDATA[
A 22-year-old provisional motorcycle rider has been issued $966 in traffic infringement notices after police detected alleged unlawful filtering and road-line offences on the Centenary Highway near Richlands.



Read: Inala Road Upgrade Moves Forward After Years of Safety Concerns



The incident was among several motorcycle offences highlighted by the Queensland Police Service (QPS) on 31 October 2026, following a month of targeted enforcement across Brisbane during Motorcycle Awareness Month.



An officer from Mount Ommaney Highway Patrol spotted the rider allegedly filtering unlawfully through traffic before intercepting him. Police issued three infringement notices carrying a combined six demerit points.



Three infringements carry six demerit points



The rider received a $518 infringement and three demerit points for unlawful motorcycle edge filtering. A second infringement, carrying a $310 fine and three demerit points, was issued for crossing continuous lines beside a painted island.



Police also issued a $138 infringement for crossing a continuous line dividing lanes on a multi-lane road. The two road-line infringements are separate offences from unlawful motorcycle filtering.



The six demerit points could have significant consequences for the rider's provisional licence. Under Queensland's demerit point system, provisional licence holders who accumulate four or more points within a continuous 12-month period must choose between a three-month licence suspension and a 12-month good driving behaviour period.



Police have not disclosed the rider's previous demerit point balance or whether any licence sanction has been imposed.



Provisional riders prohibited from lane and edge filtering



Queensland allows fully licensed motorcyclists to filter through traffic under specific conditions, but learner and provisional licence holders are prohibited from both lane filtering and edge filtering.



Lane filtering involves riding between adjacent lanes of traffic travelling in the same direction. Eligible riders must travel at no more than 30 km/h and only undertake the manoeuvre when it is safe.



Edge filtering involves riding along a road shoulder or emergency stopping lane to pass stationary or slow-moving traffic. It is permitted only for eligible riders on roads with a speed limit of at least 90 km/h, subject to additional restrictions.



Motorcyclists cannot legally edge filter through tunnels or roadworks, use unsealed shoulders or undertake the manoeuvre when conditions make it unsafe.



Lane filtering is also prohibited in operating school zones and areas where filtering restrictions apply. Queensland's road rules restrict both forms of filtering to riders holding an open motorcycle licence.



Brisbane police to maintain motorcycle enforcement



South Brisbane District Inspector Mat Kelly said motorcycle enforcement would continue beyond October, with officers targeting speeding, unlawful filtering and other dangerous riding behaviour.



Police had detected riders crossing double lines, operating motorcycles dangerously and travelling without appropriate protective clothing, including gloves, jackets and protective trousers.



Inspector Kelly also raised concerns about riders failing to adjust their speed to changing weather and road conditions. Heavy rain, reduced visibility and slower traffic could make travelling at the posted speed limit unsafe.



Queensland Police will continue stationary and mobile enforcement activities across Brisbane. Officers have also warned that riders who fail to stop when directed may face further investigation, with police pursuing alleged offenders after the initial incident.



Read: QPS Confirms Legitimacy of ‘Fake’ Richlands Parking Ticket



The enforcement campaign comes amid continuing concerns about motorcycle crashes, with riders facing a greater risk of serious injury because they have less physical protection than occupants of passenger vehicles.



Published 31-Oct-2026




]]></content:encoded>
</item><item>
<title><![CDATA[Baby Rhyme Time Brings a Little Rhythm to Brisbane’s Libraries]]></title>
<link>https://forestlakenews.com.au/baby-rhyme-time-brings-a-little-rhythm-to-brisbanes-libraries/baby-rhyme-time-brings-a-little-rhythm-to-brisbanes-libraries</link>
<media:content url="https://forestlakenews.com.au/wp-content/uploads/2026/10/BSON_First5Forever-1.jpg" medium="image"/>
<media:thumbnail url="https://forestlakenews.com.au/wp-content/uploads/2026/10/BSON_First5Forever-1.jpg"/>
<enclosure url="https://forestlakenews.com.au/wp-content/uploads/2026/10/BSON_First5Forever-1.jpg" length="82202" type="image/jpeg"/>
<pubDate>Wed, 28 Oct 2026 06:36:54 +0000</pubDate>
<dc:creator><![CDATA[Forest Lake News]]></dc:creator>
<guid isPermaLink="true">https://forestlakenews.com.au/baby-rhyme-time-brings-a-little-rhythm-to-brisbanes-libraries/</guid>
<description><![CDATA[


Baby rhyme time is one of those small library events that quietly earns its keep. It is free, simple and aimed at babies up to one year old. The November schedule shows it at Indooroopilly, with the wider run also reaching libraries across Brisbane. That makes it an easy one for local families to actually use.



A quick outing that feels close to home 



The event page keeps things plain. Families can meet other parents and babies for singing, clapping and dancing. There is no booking needed, which keeps the whole thing easy. At the same time, places are limited, so a session can close if it fills up.



That balance suits a library pretty well. It is open, but not chaotic. It is friendly, but still orderly. For parents juggling naps, bottles and everything else, that sort of setup matters more than people might think. 



The bigger schedule gives the program a wider reach. Alongside Indooroopilly, it also shows sessions at places like Holland Park, Chermside, Carina, Banyo, Nundah and Zillmere. So this is not just one nice little event in one suburb. It is a regular community rhythm across several parts of the city. 



The kind of noise libraries can welcome 



Baby rhyme time works because it is built for the early months. The event listing says the songs and action rhymes help nurture pre-literacy, communication, language and social skills. That sounds formal, but the idea behind it is pretty simple. Babies hear words, watch faces and start getting used to the sound of language. 



That is where libraries come into their own. They are already calm places. They already belong to the community. So a session like this feels natural there, not bolted on. 



And honestly, that is part of the appeal. Parents do not need a grand plan for the morning. They just need something local, useful and low-fuss. Baby rhyme time gives them that. 



A small session worth repeating 



First 5 Forever backs the program, with the State Library of Queensland coordinating it in partnership with local government. That gives the session a proper public purpose, but the benefit is still felt at the local level. One suburb gets a room full of songs. Another suburb gets the same thing on a different day. 



That is the charm of it. Baby rhyme time is not trying to be bigger than it needs to be. It just gives babies, parents and carers a warm little place to start. In a city as busy as Brisbane, that feels worth keeping on the calendar.




  
    
      Place
      Date
      Time
    
  
  
    Annerley Library11/6/20269:15AM - 9:45 AM
    Annerley Library11/13/20269:15AM - 9:45 AM
    Annerley Library11/20/20269:15AM - 9:45 AM
    Annerley Library11/27/20269:15AM - 9:45 AM

    Ashgrove Library11/4/20269:30AM - 10:00 AM
    Ashgrove Library11/11/20269:30AM - 10:00 AM
    Ashgrove Library11/18/20269:30AM - 10:00 AM
    Ashgrove Library11/25/20269:30AM - 10:00 AM

    Banyo Library11/5/202611:30AM - 12:00PM
    Banyo Library11/12/202611:30AM - 12:00PM
    Banyo Library11/19/202611:30AM - 12:00PM
    Banyo Library11/26/202611:30AM - 12:00PM

    Bracken Ridge Library11/6/202610:00AM - 10:30 AM
    Bracken Ridge Library11/13/202610:00AM - 10:30 AM
    Bracken Ridge Library11/20/202610:00AM - 10:30 AM
    Bracken Ridge Library11/27/202610:00AM - 10:30 AM

    Brisbane Square Library11/5/202611:30AM - 12:00PM
    Brisbane Square Library11/12/202611:30AM - 12:00PM
    Brisbane Square Library11/19/202611:30AM - 12:00PM
    Brisbane Square Library11/26/202611:30AM - 12:00PM

    Bulimba Library11/5/202610:00AM - 10:30 AM
    Bulimba Library11/12/202610:00AM - 10:30 AM
    Bulimba Library11/19/202610:00AM - 10:30 AM
    Bulimba Library11/26/202610:00AM - 10:30 AM

    Carina Library11/2/202610:30AM- 11:00AM
    Carina Library11/9/202610:30AM- 11:00AM
    Carina Library11/16/202610:30AM- 11:00AM
    Carina Library11/23/202610:30AM- 11:00AM
    Carina Library11/30/202610:30AM- 11:00AM

    Carindale Library11/3/202610:45AM - 11:15AM
    Carindale Library11/4/202610:30AM- 11:00AM
    Carindale Library11/10/202610:45AM - 11:15AM
    Carindale Library11/11/202610:00AM - 10:30 AM
    Carindale Library11/17/202610:45AM - 11:15AM
    Carindale Library11/18/202610:00AM - 10:30 AM
    Carindale Library11/24/202610:45AM - 11:15AM
    Carindale Library11/25/202610:00AM - 10:30 AM

    Chermside Library11/3/202610:00AM - 10:30 AM
    Chermside Library11/3/202611:00AM - 11:30 AM
    Chermside Library11/4/202611:00AM - 11:30 AM
    Chermside Library11/10/202610:00AM - 10:30 AM
    Chermside Library11/10/202611:00AM - 11:30 AM
    Chermside Library11/11/202611:00AM - 11:30 AM
    Chermside Library11/17/202610:00AM - 10:30 AM
    Chermside Library11/17/202611:00AM - 11:30 AM
    Chermside Library11/18/202611:00AM - 11:30 AM
    Chermside Library11/24/202610:00AM - 10:30 AM
    Chermside Library11/24/202611:00AM - 11:30 AM
    Chermside Library11/25/202611:00AM - 11:30 AM

    Coopers Plain Library11/5/202610:00AM - 10:30 AM
    Coopers Plain Library11/12/202610:00AM - 10:30 AM
    Coopers Plain Library11/19/202610:00AM - 10:30 AM
    Coopers Plain Library11/26/202610:00AM - 10:30 AM

    Corinda Library11/6/20269:15AM - 9:45 AM
    Corinda Library11/13/20269:15AM - 9:45 AM
    Corinda Library11/20/20269:15AM - 9:45 AM
    Corinda Library11/27/20269:15AM - 9:45 AM

    Everton Park LIbrary11/3/202611:00AM - 11:30 AM
    Everton Park LIbrary11/10/202611:00AM - 11:30 AM
    Everton Park LIbrary11/17/202611:00AM - 11:30 AM
    Everton Park LIbrary11/24/202611:00AM - 11:30 AM

    Fairfield Library11/4/20269:30AM - 10:00 AM
    Fairfield Library11/11/20269:30AM - 10:00 AM
    Fairfield Library11/18/20269:30AM - 10:00 AM
    Fairfield Library11/25/20269:30AM - 10:00 AM

    Garden City Library11/2/202610:30AM- 11:00AM
    Garden City Library11/4/202610:30AM- 11:00AM
    Garden City Library11/9/202610:30AM- 11:00AM
    Garden City Library11/11/202610:30AM- 11:00AM
    Garden City Library11/16/202610:30AM- 11:00AM
    Garden City Library11/18/202610:30AM- 11:00AM
    Garden City Library11/23/202610:30AM- 11:00AM
    Garden City Library11/25/202610:30AM- 11:00AM
    Garden City Library11/30/202610:30AM- 11:00AM

    Grange Library11/5/202611:15AM - 11:45AM
    Grange Library11/12/202611:15AM - 11:45AM
    Grange Library11/19/202611:15AM - 11:45AM
    Grange Library11/26/202611:15AM - 11:45AM

    Holland Park Library11/4/20262:00PM - 2:30PM
    Holland Park Library11/11/20262:00PM - 2:30PM
    Holland Park Library11/18/20262:00PM - 2:30PM
    Holland Park Library11/25/20262:00PM - 2:30PM

    Inala Library11/3/20262:00PM - 2:30PM
    Inala Library11/10/20262:00PM - 2:30PM
    Inala Library11/17/20262:00PM - 2:30PM
    Inala Library11/24/20262:00PM - 2:30PM

    Indooroopilly Library11/2/202610:15AM - 10:45AM
    Indooroopilly Library11/6/202610:15AM - 10:45AM
    Indooroopilly Library11/9/202610:15AM - 10:45AM
    Indooroopilly Library11/13/202610:15AM - 10:45AM
    Indooroopilly Library11/16/202610:15AM - 10:45AM
    Indooroopilly Library11/20/202610:15AM - 10:45AM
    Indooroopilly Library11/23/202610:15AM - 10:45AM
    Indooroopilly Library11/27/202610:15AM - 10:45AM
    Indooroopilly Library11/30/202610:15AM - 10:45AM

    Kenmore Library11/4/202610:30AM- 11:00AM
    Kenmore Library11/11/202610:30AM- 11:00AM
    Kenmore Library11/18/202610:30AM- 11:00AM
    Kenmore Library11/25/202610:30AM- 11:00AM

    Mitchelton Library11/6/202611:00AM - 11:30 AM
    Mitchelton Library11/13/202611:00AM - 11:30 AM
    Mitchelton Library11/20/202611:00AM - 11:30 AM
    Mitchelton Library11/27/202611:00AM - 11:30 AM

    Mount Gravatt Library11/6/20269:30AM - 10:00 AM
    Mount Gravatt Library11/13/20269:30AM - 10:00 AM
    Mount Gravatt Library11/20/20269:30AM - 10:00 AM
    Mount Gravatt Library11/27/20269:30AM - 10:00 AM

    Mt Ommaney Library11/4/20269:30AM - 10:00 AM
    Mt Ommaney Library11/11/20269:30AM - 10:00 AM
    Mt Ommaney Library11/18/20269:30AM - 10:00 AM
    Mt Ommaney Library11/25/20269:30AM - 10:00 AM

    New Farm Library11/4/202611:00AM - 11:30 AM
    New Farm Library11/11/202611:00AM - 11:30 AM
    New Farm Library11/18/202611:00AM - 11:30 AM
    New Farm Library11/25/202611:00AM - 11:30 AM

    Nundah Library11/5/20269:30AM - 10:00 AM
    Nundah Library11/12/20269:30AM - 10:00 AM
    Nundah Library11/19/20269:30AM - 10:00 AM
    Nundah Library11/26/20269:30AM - 10:00 AM

    Sandgate Library11/6/202610:00AM - 10:30 AM
    Sandgate Library11/13/202610:00AM - 10:30 AM
    Sandgate Library11/20/202610:00AM - 10:30 AM
    Sandgate Library11/27/202610:00AM - 10:30 AM

    Stones Corner Library11/6/20269:30AM - 10:00 AM
    Stones Corner Library11/13/20269:30AM - 10:00 AM
    Stones Corner Library11/20/20269:30AM - 10:00 AM
    Stones Corner Library11/27/20269:30AM - 10:00 AM

    Sunnybank Hills Library11/2/202610:30AM- 11:00AM
    Sunnybank Hills Library11/9/202610:30AM- 11:00AM
    Sunnybank Hills Library11/16/202610:30AM- 11:00AM
    Sunnybank Hills Library11/23/202610:30AM- 11:00AM
    Sunnybank Hills Library11/30/202610:30AM- 11:00AM

    Toowong Library11/3/202611:30AM - 12:00PM
    Toowong Library11/10/202611:30AM - 12:00PM
    Toowong Library11/17/202611:30AM - 12:00PM
    Toowong Library11/24/202611:30AM - 12:00PM

    West End Library11/4/20269:15AM - 9:45 AM
    West End Library11/11/20269:15AM - 9:45 AM
    West End Library11/18/20269:15AM - 9:45 AM
    West End Library11/25/20269:15AM - 9:45 AM

    Wynnum Library11/6/20269:15AM - 9:45 AM
    Wynnum Library11/13/20269:15AM - 9:45 AM
    Wynnum Library11/20/20269:15AM - 9:45 AM
    Wynnum Library11/27/20269:15AM - 9:45 AM

    Zillmere Library11/5/202610:30AM- 11:00AM
    Zillmere Library11/12/202610:30AM- 11:00AM
    Zillmere Library11/19/202610:30AM- 11:00AM
    Zillmere Library11/26/202610:30AM- 11:00AM
  




Published 28-October-2026
]]></description>
<content:encoded><![CDATA[


Baby rhyme time is one of those small library events that quietly earns its keep. It is free, simple and aimed at babies up to one year old. The November schedule shows it at Indooroopilly, with the wider run also reaching libraries across Brisbane. That makes it an easy one for local families to actually use.



A quick outing that feels close to home 



The event page keeps things plain. Families can meet other parents and babies for singing, clapping and dancing. There is no booking needed, which keeps the whole thing easy. At the same time, places are limited, so a session can close if it fills up.



That balance suits a library pretty well. It is open, but not chaotic. It is friendly, but still orderly. For parents juggling naps, bottles and everything else, that sort of setup matters more than people might think. 



The bigger schedule gives the program a wider reach. Alongside Indooroopilly, it also shows sessions at places like Holland Park, Chermside, Carina, Banyo, Nundah and Zillmere. So this is not just one nice little event in one suburb. It is a regular community rhythm across several parts of the city. 



The kind of noise libraries can welcome 



Baby rhyme time works because it is built for the early months. The event listing says the songs and action rhymes help nurture pre-literacy, communication, language and social skills. That sounds formal, but the idea behind it is pretty simple. Babies hear words, watch faces and start getting used to the sound of language. 



That is where libraries come into their own. They are already calm places. They already belong to the community. So a session like this feels natural there, not bolted on. 



And honestly, that is part of the appeal. Parents do not need a grand plan for the morning. They just need something local, useful and low-fuss. Baby rhyme time gives them that. 



A small session worth repeating 



First 5 Forever backs the program, with the State Library of Queensland coordinating it in partnership with local government. That gives the session a proper public purpose, but the benefit is still felt at the local level. One suburb gets a room full of songs. Another suburb gets the same thing on a different day. 



That is the charm of it. Baby rhyme time is not trying to be bigger than it needs to be. It just gives babies, parents and carers a warm little place to start. In a city as busy as Brisbane, that feels worth keeping on the calendar.




  
    
      Place
      Date
      Time
    
  
  
    Annerley Library11/6/20269:15AM - 9:45 AM
    Annerley Library11/13/20269:15AM - 9:45 AM
    Annerley Library11/20/20269:15AM - 9:45 AM
    Annerley Library11/27/20269:15AM - 9:45 AM

    Ashgrove Library11/4/20269:30AM - 10:00 AM
    Ashgrove Library11/11/20269:30AM - 10:00 AM
    Ashgrove Library11/18/20269:30AM - 10:00 AM
    Ashgrove Library11/25/20269:30AM - 10:00 AM

    Banyo Library11/5/202611:30AM - 12:00PM
    Banyo Library11/12/202611:30AM - 12:00PM
    Banyo Library11/19/202611:30AM - 12:00PM
    Banyo Library11/26/202611:30AM - 12:00PM

    Bracken Ridge Library11/6/202610:00AM - 10:30 AM
    Bracken Ridge Library11/13/202610:00AM - 10:30 AM
    Bracken Ridge Library11/20/202610:00AM - 10:30 AM
    Bracken Ridge Library11/27/202610:00AM - 10:30 AM

    Brisbane Square Library11/5/202611:30AM - 12:00PM
    Brisbane Square Library11/12/202611:30AM - 12:00PM
    Brisbane Square Library11/19/202611:30AM - 12:00PM
    Brisbane Square Library11/26/202611:30AM - 12:00PM

    Bulimba Library11/5/202610:00AM - 10:30 AM
    Bulimba Library11/12/202610:00AM - 10:30 AM
    Bulimba Library11/19/202610:00AM - 10:30 AM
    Bulimba Library11/26/202610:00AM - 10:30 AM

    Carina Library11/2/202610:30AM- 11:00AM
    Carina Library11/9/202610:30AM- 11:00AM
    Carina Library11/16/202610:30AM- 11:00AM
    Carina Library11/23/202610:30AM- 11:00AM
    Carina Library11/30/202610:30AM- 11:00AM

    Carindale Library11/3/202610:45AM - 11:15AM
    Carindale Library11/4/202610:30AM- 11:00AM
    Carindale Library11/10/202610:45AM - 11:15AM
    Carindale Library11/11/202610:00AM - 10:30 AM
    Carindale Library11/17/202610:45AM - 11:15AM
    Carindale Library11/18/202610:00AM - 10:30 AM
    Carindale Library11/24/202610:45AM - 11:15AM
    Carindale Library11/25/202610:00AM - 10:30 AM

    Chermside Library11/3/202610:00AM - 10:30 AM
    Chermside Library11/3/202611:00AM - 11:30 AM
    Chermside Library11/4/202611:00AM - 11:30 AM
    Chermside Library11/10/202610:00AM - 10:30 AM
    Chermside Library11/10/202611:00AM - 11:30 AM
    Chermside Library11/11/202611:00AM - 11:30 AM
    Chermside Library11/17/202610:00AM - 10:30 AM
    Chermside Library11/17/202611:00AM - 11:30 AM
    Chermside Library11/18/202611:00AM - 11:30 AM
    Chermside Library11/24/202610:00AM - 10:30 AM
    Chermside Library11/24/202611:00AM - 11:30 AM
    Chermside Library11/25/202611:00AM - 11:30 AM

    Coopers Plain Library11/5/202610:00AM - 10:30 AM
    Coopers Plain Library11/12/202610:00AM - 10:30 AM
    Coopers Plain Library11/19/202610:00AM - 10:30 AM
    Coopers Plain Library11/26/202610:00AM - 10:30 AM

    Corinda Library11/6/20269:15AM - 9:45 AM
    Corinda Library11/13/20269:15AM - 9:45 AM
    Corinda Library11/20/20269:15AM - 9:45 AM
    Corinda Library11/27/20269:15AM - 9:45 AM

    Everton Park LIbrary11/3/202611:00AM - 11:30 AM
    Everton Park LIbrary11/10/202611:00AM - 11:30 AM
    Everton Park LIbrary11/17/202611:00AM - 11:30 AM
    Everton Park LIbrary11/24/202611:00AM - 11:30 AM

    Fairfield Library11/4/20269:30AM - 10:00 AM
    Fairfield Library11/11/20269:30AM - 10:00 AM
    Fairfield Library11/18/20269:30AM - 10:00 AM
    Fairfield Library11/25/20269:30AM - 10:00 AM

    Garden City Library11/2/202610:30AM- 11:00AM
    Garden City Library11/4/202610:30AM- 11:00AM
    Garden City Library11/9/202610:30AM- 11:00AM
    Garden City Library11/11/202610:30AM- 11:00AM
    Garden City Library11/16/202610:30AM- 11:00AM
    Garden City Library11/18/202610:30AM- 11:00AM
    Garden City Library11/23/202610:30AM- 11:00AM
    Garden City Library11/25/202610:30AM- 11:00AM
    Garden City Library11/30/202610:30AM- 11:00AM

    Grange Library11/5/202611:15AM - 11:45AM
    Grange Library11/12/202611:15AM - 11:45AM
    Grange Library11/19/202611:15AM - 11:45AM
    Grange Library11/26/202611:15AM - 11:45AM

    Holland Park Library11/4/20262:00PM - 2:30PM
    Holland Park Library11/11/20262:00PM - 2:30PM
    Holland Park Library11/18/20262:00PM - 2:30PM
    Holland Park Library11/25/20262:00PM - 2:30PM

    Inala Library11/3/20262:00PM - 2:30PM
    Inala Library11/10/20262:00PM - 2:30PM
    Inala Library11/17/20262:00PM - 2:30PM
    Inala Library11/24/20262:00PM - 2:30PM

    Indooroopilly Library11/2/202610:15AM - 10:45AM
    Indooroopilly Library11/6/202610:15AM - 10:45AM
    Indooroopilly Library11/9/202610:15AM - 10:45AM
    Indooroopilly Library11/13/202610:15AM - 10:45AM
    Indooroopilly Library11/16/202610:15AM - 10:45AM
    Indooroopilly Library11/20/202610:15AM - 10:45AM
    Indooroopilly Library11/23/202610:15AM - 10:45AM
    Indooroopilly Library11/27/202610:15AM - 10:45AM
    Indooroopilly Library11/30/202610:15AM - 10:45AM

    Kenmore Library11/4/202610:30AM- 11:00AM
    Kenmore Library11/11/202610:30AM- 11:00AM
    Kenmore Library11/18/202610:30AM- 11:00AM
    Kenmore Library11/25/202610:30AM- 11:00AM

    Mitchelton Library11/6/202611:00AM - 11:30 AM
    Mitchelton Library11/13/202611:00AM - 11:30 AM
    Mitchelton Library11/20/202611:00AM - 11:30 AM
    Mitchelton Library11/27/202611:00AM - 11:30 AM

    Mount Gravatt Library11/6/20269:30AM - 10:00 AM
    Mount Gravatt Library11/13/20269:30AM - 10:00 AM
    Mount Gravatt Library11/20/20269:30AM - 10:00 AM
    Mount Gravatt Library11/27/20269:30AM - 10:00 AM

    Mt Ommaney Library11/4/20269:30AM - 10:00 AM
    Mt Ommaney Library11/11/20269:30AM - 10:00 AM
    Mt Ommaney Library11/18/20269:30AM - 10:00 AM
    Mt Ommaney Library11/25/20269:30AM - 10:00 AM

    New Farm Library11/4/202611:00AM - 11:30 AM
    New Farm Library11/11/202611:00AM - 11:30 AM
    New Farm Library11/18/202611:00AM - 11:30 AM
    New Farm Library11/25/202611:00AM - 11:30 AM

    Nundah Library11/5/20269:30AM - 10:00 AM
    Nundah Library11/12/20269:30AM - 10:00 AM
    Nundah Library11/19/20269:30AM - 10:00 AM
    Nundah Library11/26/20269:30AM - 10:00 AM

    Sandgate Library11/6/202610:00AM - 10:30 AM
    Sandgate Library11/13/202610:00AM - 10:30 AM
    Sandgate Library11/20/202610:00AM - 10:30 AM
    Sandgate Library11/27/202610:00AM - 10:30 AM

    Stones Corner Library11/6/20269:30AM - 10:00 AM
    Stones Corner Library11/13/20269:30AM - 10:00 AM
    Stones Corner Library11/20/20269:30AM - 10:00 AM
    Stones Corner Library11/27/20269:30AM - 10:00 AM

    Sunnybank Hills Library11/2/202610:30AM- 11:00AM
    Sunnybank Hills Library11/9/202610:30AM- 11:00AM
    Sunnybank Hills Library11/16/202610:30AM- 11:00AM
    Sunnybank Hills Library11/23/202610:30AM- 11:00AM
    Sunnybank Hills Library11/30/202610:30AM- 11:00AM

    Toowong Library11/3/202611:30AM - 12:00PM
    Toowong Library11/10/202611:30AM - 12:00PM
    Toowong Library11/17/202611:30AM - 12:00PM
    Toowong Library11/24/202611:30AM - 12:00PM

    West End Library11/4/20269:15AM - 9:45 AM
    West End Library11/11/20269:15AM - 9:45 AM
    West End Library11/18/20269:15AM - 9:45 AM
    West End Library11/25/20269:15AM - 9:45 AM

    Wynnum Library11/6/20269:15AM - 9:45 AM
    Wynnum Library11/13/20269:15AM - 9:45 AM
    Wynnum Library11/20/20269:15AM - 9:45 AM
    Wynnum Library11/27/20269:15AM - 9:45 AM

    Zillmere Library11/5/202610:30AM- 11:00AM
    Zillmere Library11/12/202610:30AM- 11:00AM
    Zillmere Library11/19/202610:30AM- 11:00AM
    Zillmere Library11/26/202610:30AM- 11:00AM
  




Published 28-October-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Brisbane Metro Expansion Survey Opens as Residents Asked About Local Transport Problems]]></title>
<link>https://forestlakenews.com.au/brisbane-metro-expansion-survey-opens-as-residents-asked-about-local-transport-problems/brisbane-metro-expansion-survey-opens-as-residents-asked-about-local-transport-problems</link>
<media:content url="https://forestlakenews.com.au/wp-content/uploads/2026/10/Brisbane-Metro-FI.png" medium="image"/>
<media:thumbnail url="https://forestlakenews.com.au/wp-content/uploads/2026/10/Brisbane-Metro-FI.png"/>
<enclosure url="https://forestlakenews.com.au/wp-content/uploads/2026/10/Brisbane-Metro-FI.png" length="1526806" type="image/png"/>
<pubDate>Wed, 28 Oct 2026 00:24:23 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<dc:creator><![CDATA[Forest Lake News]]></dc:creator>
<guid isPermaLink="true">https://forestlakenews.com.au/brisbane-metro-expansion-survey-opens-as-residents-asked-about-local-transport-problems/</guid>
<description><![CDATA[


Brisbane residents are being invited to share their public transport concerns and suggest improvements as community consultation begins on proposed Metro expansions across the city's northern, eastern, southern and airport corridors.



Submissions close on Sunday, 13 December 2026, giving commuters an opportunity to describe difficulties with existing services and suggest improvements. Their feedback will help inform a business case examining how Brisbane Metro could reach more suburbs.



Four corridors bring different transport questions



The proposed Northern Metro would connect the CBD with Carseldine, extending services through Lutwyche, Kedron, Chermside and Aspley. Gympie Road has been identified as a potential corridor, raising questions about how dedicated bus infrastructure could improve journeys along one of Brisbane's major northern transport routes.



For residents in these suburbs, the consultation provides an opportunity to describe existing problems involving bus connections, journey reliability and access to public transport. Final station locations and the infrastructure needed for a northern extension remain undecided.



The Eastern Metro proposal would connect central Brisbane with Capalaba through the eastern suburbs, with Old Cleveland Road identified as a potential route. Commuters travelling through areas including Coorparoo could provide feedback about existing services, transfers and difficulties encountered during their journeys.



South of the city, the proposed Southern Metro would connect the CBD with Springwood, complementing the South East Busway extension and linking with the existing M1 service at Eight Mile Plains busway station.



The fourth corridor would create express Metro connections between Brisbane Airport's domestic and international terminals and the CBD. Planning will examine how those services could fit into the wider public transport network.



All four corridors remain proposals, with their potential alignments and infrastructure needs to be examined through the business case.



Photo Credit: BCC



Population growth adds pressure to existing routes



Council forecasts substantial population growth along the three residential corridors over the next 20 years.



Its projections indicate increases of 60 per cent along the CBD-to-Carseldine corridor, 29 per cent towards Capalaba and 96 per cent towards Springwood. Approximately 88,000 additional residents are expected in areas surrounding those corridors.



Brisbane's latest expansion proposals also revisit ambitions from the South East Queensland Integrated Regional Transport Plan developed in the 1990s. The earlier plan proposed approximately 75 kilometres of busways, but only about 25 kilometres were ultimately built.



Infrastructure Australia has identified the Metro expansion as an early-stage investment proposal that could improve public transport capacity, interchange connections and service reliability. Potential benefits remain subject to further planning and assessment.



Council wants to hear where journeys fall short



The consultation focuses on residents' current travel experiences and suggestions for improving bus services along the proposed corridors, rather than asking them to comment on completed designs.



Issues such as unreliable travel times, inconvenient transfers, access to stops and gaps in service coverage could be raised by residents. Council has not indicated that participants will be able to vote on final station locations or select specific route alignments.



The consultation follows the introduction of Brisbane Metro's M1 and M2 services in 2025, alongside changes to the city's wider bus network. Council is now investigating how similar high-capacity services could operate beyond the existing network.



LM Adrian Schrinner has encouraged residents to contribute to the expansion plans, arguing that the Metro model should be extended into other parts of Brisbane.



Civic Cabinet Chair for Transport Cr Andrew Wines has also sought feedback from regular passengers and people who would consider using public transport if better services were available.







Construction funding and 2032 timetable remain uncertain



Brisbane City Council is working with the Queensland and Australian governments on the Brisbane Metro Expansions Business Case, with Jacobs Group (Australia) engaged to undertake the work.



The business case will investigate possible route alignments, depot locations, network improvements, infrastructure requirements and the order in which different sections could be delivered.



The Australian Government has committed $50 million to support development of the final business case and related expansion planning. However, construction funding for the proposed corridors has not been secured, and major infrastructure works would require substantial additional investment.



Mr Schrinner has declined to guarantee that any of the proposed extensions will be completed before the Brisbane 2032 Olympic and Paralympic Games.



The distinction between long-term expansion plans and present-day transport needs has also attracted criticism. Opposition Leader Cr Jared Cassidy has called for more suburban bus services now, rather than waiting years for major infrastructure projects.



Council expects the expansion business case to be completed in late 2027. Any subsequent construction would depend on funding availability, relevant approvals and decisions about which sections should proceed.



How residents can have their say



The survey is open until Sunday, 13 December 2026. Council has also provided an option for residents to register for project updates as the business case progresses.




HAVE YOUR SAY










.bson-metro-box {
  box-sizing: border-box;
  max-width: 100%;
  padding: 20px;
  margin: 24px 0;
  border: 1px solid #d5dee8;
  border-left: 4px solid #235b87;
  border-radius: 6px;
  background: #f6f9fc;
  color: #1e293b;
  font-family: inherit;
  line-height: 1.6;
}
.bson-metro-box * { box-sizing: border-box; }
.bson-metro-box h3 {
  margin: 0 0 12px;
  font-size: 1.3rem;
  line-height: 1.35;
  color: #163c5c;
}
.bson-metro-box p { margin: 0 0 12px; }
.bson-metro-box ul {
  margin: 8px 0 16px;
  padding-left: 22px;
}
.bson-metro-box li { margin: 4px 0; }
.bson-metro-box a.bson-metro-link {
  display: inline-block;
  max-width: 100%;
  padding: 10px 15px;
  border-radius: 4px;
  background: #235b87;
  color: #fff;
  font-weight: 700;
  text-decoration: none;
  overflow-wrap: anywhere;
}
.bson-metro-box a.bson-metro-link:hover,
.bson-metro-box a.bson-metro-link:focus {
  background: #163c5c;
  color: #fff;
  text-decoration: underline;
}
.bson-metro-box .bson-metro-note {
  margin: 12px 0 0;
  font-size: .87rem;
  color: #475569;
}
@media (max-width: 480px) {
  .bson-metro-box { padding: 15px; }
  .bson-metro-box h3 { font-size: 1.15rem; }
  .bson-metro-box a.bson-metro-link {
    display: block;
    text-align: center;
  }
}



  Have Your Say on Brisbane Metro

  Survey closes:
  Sunday, 13 December 2026

  Brisbane City Council is seeking feedback
  about current travel experiences and
  potential bus network improvements.

  Proposed expansion corridors:
  
    Northern: CBD to Carseldine
    Eastern: CBD to Capalaba
    Southern: CBD to Springwood
    Airport: CBD to Brisbane Airport
  

  
    
      View Consultation and Survey
    
  

  
    The proposed corridors remain subject to
    the business case, funding and approvals.
    No final routes or construction timetable
    have been confirmed.
  





The&nbsp;online community survey&nbsp;can be accessed directly, while questions about the project can be sent to&nbsp;metroexpansions@brisbane.qld.gov.au.



Feedback gathered during the consultation will contribute to the business case, which is expected to provide more detailed information about potential routes, infrastructure requirements and delivery stages in late 2027.



Published 28-Oct-2026



Featured Image Credit: Wikipedia/Kyethepie21/CC0




]]></description>
<content:encoded><![CDATA[


Brisbane residents are being invited to share their public transport concerns and suggest improvements as community consultation begins on proposed Metro expansions across the city's northern, eastern, southern and airport corridors.



Submissions close on Sunday, 13 December 2026, giving commuters an opportunity to describe difficulties with existing services and suggest improvements. Their feedback will help inform a business case examining how Brisbane Metro could reach more suburbs.



Four corridors bring different transport questions



The proposed Northern Metro would connect the CBD with Carseldine, extending services through Lutwyche, Kedron, Chermside and Aspley. Gympie Road has been identified as a potential corridor, raising questions about how dedicated bus infrastructure could improve journeys along one of Brisbane's major northern transport routes.



For residents in these suburbs, the consultation provides an opportunity to describe existing problems involving bus connections, journey reliability and access to public transport. Final station locations and the infrastructure needed for a northern extension remain undecided.



The Eastern Metro proposal would connect central Brisbane with Capalaba through the eastern suburbs, with Old Cleveland Road identified as a potential route. Commuters travelling through areas including Coorparoo could provide feedback about existing services, transfers and difficulties encountered during their journeys.



South of the city, the proposed Southern Metro would connect the CBD with Springwood, complementing the South East Busway extension and linking with the existing M1 service at Eight Mile Plains busway station.



The fourth corridor would create express Metro connections between Brisbane Airport's domestic and international terminals and the CBD. Planning will examine how those services could fit into the wider public transport network.



All four corridors remain proposals, with their potential alignments and infrastructure needs to be examined through the business case.



Photo Credit: BCC



Population growth adds pressure to existing routes



Council forecasts substantial population growth along the three residential corridors over the next 20 years.



Its projections indicate increases of 60 per cent along the CBD-to-Carseldine corridor, 29 per cent towards Capalaba and 96 per cent towards Springwood. Approximately 88,000 additional residents are expected in areas surrounding those corridors.



Brisbane's latest expansion proposals also revisit ambitions from the South East Queensland Integrated Regional Transport Plan developed in the 1990s. The earlier plan proposed approximately 75 kilometres of busways, but only about 25 kilometres were ultimately built.



Infrastructure Australia has identified the Metro expansion as an early-stage investment proposal that could improve public transport capacity, interchange connections and service reliability. Potential benefits remain subject to further planning and assessment.



Council wants to hear where journeys fall short



The consultation focuses on residents' current travel experiences and suggestions for improving bus services along the proposed corridors, rather than asking them to comment on completed designs.



Issues such as unreliable travel times, inconvenient transfers, access to stops and gaps in service coverage could be raised by residents. Council has not indicated that participants will be able to vote on final station locations or select specific route alignments.



The consultation follows the introduction of Brisbane Metro's M1 and M2 services in 2025, alongside changes to the city's wider bus network. Council is now investigating how similar high-capacity services could operate beyond the existing network.



LM Adrian Schrinner has encouraged residents to contribute to the expansion plans, arguing that the Metro model should be extended into other parts of Brisbane.



Civic Cabinet Chair for Transport Cr Andrew Wines has also sought feedback from regular passengers and people who would consider using public transport if better services were available.







Construction funding and 2032 timetable remain uncertain



Brisbane City Council is working with the Queensland and Australian governments on the Brisbane Metro Expansions Business Case, with Jacobs Group (Australia) engaged to undertake the work.



The business case will investigate possible route alignments, depot locations, network improvements, infrastructure requirements and the order in which different sections could be delivered.



The Australian Government has committed $50 million to support development of the final business case and related expansion planning. However, construction funding for the proposed corridors has not been secured, and major infrastructure works would require substantial additional investment.



Mr Schrinner has declined to guarantee that any of the proposed extensions will be completed before the Brisbane 2032 Olympic and Paralympic Games.



The distinction between long-term expansion plans and present-day transport needs has also attracted criticism. Opposition Leader Cr Jared Cassidy has called for more suburban bus services now, rather than waiting years for major infrastructure projects.



Council expects the expansion business case to be completed in late 2027. Any subsequent construction would depend on funding availability, relevant approvals and decisions about which sections should proceed.



How residents can have their say



The survey is open until Sunday, 13 December 2026. Council has also provided an option for residents to register for project updates as the business case progresses.




HAVE YOUR SAY










.bson-metro-box {
  box-sizing: border-box;
  max-width: 100%;
  padding: 20px;
  margin: 24px 0;
  border: 1px solid #d5dee8;
  border-left: 4px solid #235b87;
  border-radius: 6px;
  background: #f6f9fc;
  color: #1e293b;
  font-family: inherit;
  line-height: 1.6;
}
.bson-metro-box * { box-sizing: border-box; }
.bson-metro-box h3 {
  margin: 0 0 12px;
  font-size: 1.3rem;
  line-height: 1.35;
  color: #163c5c;
}
.bson-metro-box p { margin: 0 0 12px; }
.bson-metro-box ul {
  margin: 8px 0 16px;
  padding-left: 22px;
}
.bson-metro-box li { margin: 4px 0; }
.bson-metro-box a.bson-metro-link {
  display: inline-block;
  max-width: 100%;
  padding: 10px 15px;
  border-radius: 4px;
  background: #235b87;
  color: #fff;
  font-weight: 700;
  text-decoration: none;
  overflow-wrap: anywhere;
}
.bson-metro-box a.bson-metro-link:hover,
.bson-metro-box a.bson-metro-link:focus {
  background: #163c5c;
  color: #fff;
  text-decoration: underline;
}
.bson-metro-box .bson-metro-note {
  margin: 12px 0 0;
  font-size: .87rem;
  color: #475569;
}
@media (max-width: 480px) {
  .bson-metro-box { padding: 15px; }
  .bson-metro-box h3 { font-size: 1.15rem; }
  .bson-metro-box a.bson-metro-link {
    display: block;
    text-align: center;
  }
}



  Have Your Say on Brisbane Metro

  Survey closes:
  Sunday, 13 December 2026

  Brisbane City Council is seeking feedback
  about current travel experiences and
  potential bus network improvements.

  Proposed expansion corridors:
  
    Northern: CBD to Carseldine
    Eastern: CBD to Capalaba
    Southern: CBD to Springwood
    Airport: CBD to Brisbane Airport
  

  
    
      View Consultation and Survey
    
  

  
    The proposed corridors remain subject to
    the business case, funding and approvals.
    No final routes or construction timetable
    have been confirmed.
  





The&nbsp;online community survey&nbsp;can be accessed directly, while questions about the project can be sent to&nbsp;metroexpansions@brisbane.qld.gov.au.



Feedback gathered during the consultation will contribute to the business case, which is expected to provide more detailed information about potential routes, infrastructure requirements and delivery stages in late 2027.



Published 28-Oct-2026



Featured Image Credit: Wikipedia/Kyethepie21/CC0




]]></content:encoded>
</item><item>
<title><![CDATA[Queensland’s Smoke Alarm Deadline Is Near — Is Your Family Really Protected?]]></title>
<link>https://forestlakenews.com.au/queensland-smoke-alarm-deadline-2027-home-safety/queensland-smoke-alarm-deadline-2027-home-safety</link>
<media:content url="https://forestlakenews.com.au/wp-content/uploads/2026/11/Brooks-Kenmore-1.jpeg" medium="image"/>
<media:thumbnail url="https://forestlakenews.com.au/wp-content/uploads/2026/11/Brooks-Kenmore-1.jpeg"/>
<enclosure url="https://forestlakenews.com.au/wp-content/uploads/2026/11/Brooks-Kenmore-1.jpeg" length="298570" type="image/jpeg"/>
<pubDate>Wed, 11 Nov 2026 10:19:00 +0000</pubDate>
<dc:creator><![CDATA[Forest Lake News]]></dc:creator>
<guid isPermaLink="true">https://forestlakenews.com.au/queensland-smoke-alarm-deadline-2027-home-safety/</guid>
<description><![CDATA[




By Cathy Brand | Fire Safety Advocate and CEO of Brooks Australia



A Queensland homeowner could have several working smoke alarms throughout their property and still fall short of the state's requirements when the final stage of its smoke alarm reforms takes effect on 1 January 2027.



The changes go well beyond replacing ageing devices. They affect where alarms must be installed, how they communicate with one another and the type of technology permitted. For households that have relied on the same arrangement for years, becoming compliant may involve a more substantial upgrade than expected.



With just over two months remaining, the approaching deadline also presents an opportunity to consider whether the warning system provides everyone in the home with the best possible chance of escaping a fire.



A decade of reform reaches its final deadline



Queensland's smoke alarm reforms have been introduced progressively over the past decade, beginning with new homes and substantial renovations in 2017. Properties being sold or leased were required to meet the upgraded standards from January 2022, while the final stage, commencing on 1 January 2027, applies to the remaining domestic dwellings.




  
    .cb-history-box,
    .cb-history-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-history-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px 26px;
      background: #f5f6f7;
      border: 1px solid #d9dee2;
      border-left: 5px solid #40566a;
      border-radius: 7px;
      color: #26323b;
      font: 16px/1.65 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-history-box h3 {
      margin: 0 0 17px;
      color: #203b50;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
      hyphens: none;
    }

    .cb-history-box p {
      margin: 0 0 14px;
      line-height: 1.65;
      hyphens: none;
    }

    .cb-history-box p:last-child {
      margin-bottom: 0;
    }

    .cb-history-box strong {
      color: #203b50;
    }

    .cb-history-box a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-history-box a:hover,
    .cb-history-box a:focus {
      color: #40566a;
    }

    @media (max-width: 600px) {
      .cb-history-box {
        padding: 19px 16px;
        margin: 22px 0;
        font-size: 15px;
      }

      .cb-history-box h3 {
        font-size: 19px;
      }
    }
  

  The Slacks Creek Tragedy That Changed Queensland's Smoke Alarm Laws

  
    On 24 August 2011, a house fire at Slacks Creek,
    south of Brisbane, claimed 11 lives, including
    eight children. The disaster became
    a defining tragedy in Queensland's
    approach to residential fire safety,
    ultimately helping drive some of the country's
    most significant smoke alarm reforms.
  

  
    The coronial inquest, whose findings were
    delivered on 28 November 2014, examined
    the failure of the home's smoke alarms.
    The coroner concluded there was a reasonable
    prospect that some or all of those who died
    could have escaped had the alarms been working.
  

  
    The coroner's recommendations helped shape
    sweeping changes to Queensland's smoke alarm
    laws. Legislation passed in 2016 introduced
    a ten-year transition towards photoelectric,
    interconnected alarms installed in bedrooms,
    connecting hallways and on every storey.
  

  
    The reforms began taking effect in January 2017,
    with the final stage due on 1 January 2027.
  

  
    The changes reflect a fundamental lesson from
    the tragedy: providing an earlier warning
    throughout a home can give occupants more
    time to escape.
  




The legislation requires photoelectric smoke alarms complying with Australian Standard AS 3786:2014, without an ionisation sensor. They must be less than ten years old, operate when tested and be interconnected so that when one alarm activates, all connected alarms sound.



Placement is equally important. Alarms are required in every bedroom, in hallways connecting bedrooms to the rest of the dwelling and on each storey, with additional provisions for levels without bedrooms. A home with functioning alarms in its hallways, for example, may still need additional units inside bedrooms to satisfy the requirements.



One common misconception is that compliance necessarily involves extensive rewiring. Queensland permits compliant alarms powered by non-removable ten-year batteries in existing dwellings where appropriate, and wireless interconnection can provide an alternative to running interconnect cables throughout a property.



However, an existing hardwired smoke alarm must be replaced with another hardwired unit, with the electrical work undertaken by a licensed electrician. New homes and substantial renovations have separate hardwiring requirements. Depending on the home's existing installation, a combination of hardwired and compatible wireless interconnected alarms may also be suitable.





  
    .cb-compliance-box,
    .cb-compliance-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-compliance-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px;
      background: #fff7f8;
      border: 1px solid #e8cbd1;
      border-left: 5px solid #CF0A2C;
      border-radius: 7px;
      color: #2E2A25;
      font: 16px/1.55 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-box h3 {
      margin: 0 0 12px;
      color: #CF0A2C;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-box .cb-intro {
      margin: 0 0 19px;
      line-height: 1.6;
    }

    .cb-compliance-grid {
      display: grid;
      grid-template-columns: repeat(2, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-compliance-item {
      min-width: 0;
      padding: 14px 15px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-item strong {
      display: block;
      margin-bottom: 5px;
      color: #CF0A2C;
      font-size: 15px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-item p {
      margin: 0;
      color: #2E2A25;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-install-section {
      margin-top: 24px;
      padding-top: 19px;
      border-top: 2px solid #e8cbd1;
    }

    .cb-install-section h4 {
      margin: 0 0 8px;
      color: #CF0A2C;
      font-size: 19px;
      line-height: 1.35;
      font-weight: 700;
    }

    .cb-install-intro {
      margin: 0 0 15px;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-install-grid {
      display: grid;
      grid-template-columns: repeat(3, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-install-item {
      min-width: 0;
      padding: 14px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
    }

    .cb-install-item strong {
      display: block;
      margin-bottom: 7px;
      color: #CF0A2C;
      font-size: 15px;
      line-height: 1.4;
    }

    .cb-install-item p {
      margin: 0;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-compliance-note {
      margin: 20px 0 0;
      padding-top: 14px;
      border-top: 1px solid #e8cbd1;
      color: #403a37;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-compliance-note strong {
      color: #CF0A2C;
    }

    @media (max-width: 650px) {
      .cb-compliance-box {
        padding: 18px 15px;
        margin: 22px 0;
      }

      .cb-compliance-box h3 {
        font-size: 19px;
      }

      .cb-compliance-grid,
      .cb-install-grid {
        grid-template-columns: minmax(0, 1fr);
        gap: 9px;
      }

      .cb-compliance-item,
      .cb-install-item {
        padding: 12px 13px;
      }

      .cb-install-section h4 {
        font-size: 18px;
      }

      .cb-compliance-note {
        font-size: 13px;
      }
    }
  

  
    Queensland's 2027 Smoke Alarm Rules:
    A Homeowner's Checklist
  

  
    By 1 January 2027, all remaining private homes,
    townhouses and units in Queensland must comply
    with the state's upgraded smoke alarm requirements.
  

  

    
      Alarm type
      
        Required alarms must be photoelectric,
        comply with AS 3786:2014 and contain
        no ionisation sensor.
      
    

    
      Age
      
        Alarms must be less than ten years old
        from their manufacture date.
      
    

    
      Interconnection
      
        All required alarms must be interconnected
        so that when one activates, they all sound.
      
    

    
      Bedrooms
      
        An alarm must be installed in every bedroom.
      
    

    
      Hallways
      
        Alarms must be installed in hallways connecting
        bedrooms to the rest of the dwelling. Where
        there is no hallway, an alarm must be installed
        between the bedrooms and other parts
        of the storey.
      
    

    
      Every storey
      
        Each level requires appropriate coverage.
        On storeys without bedrooms, an alarm must
        be installed in the most likely path of
        travel to an exit.
      
    

    
      Power source
      
        Alarms must be hardwired or use a
        non-removable ten-year battery, as permitted
        for the property. New homes and substantial
        renovations require hardwired alarms.
      
    

    
      Hardwired replacements
      
        Existing 240V hardwired smoke alarms must
        be replaced with compliant hardwired
        photoelectric alarms, not battery-only models.
        A licensed electrician must carry out
        the electrical replacement.
      
    

    
      Operation
      
        All alarms must work when tested.
      
    

  

  

    Who Can Install Your Smoke Alarms?

    
      Queensland law does not require every smoke
      alarm to be installed by an electrician.
      The requirements depend on the alarm's
      power source and whether electrical work
      is involved.
    

    

      
        1. New hardwired alarms
        
          A licensed electrician is required
          to install 240V hardwired smoke alarms.
          This includes electrical wiring and
          connections to mains power.
        
      

      
        2. Battery-powered alarms
        
          Homeowners can generally install compliant
          photoelectric alarms powered by non-removable
          ten-year batteries themselves, provided
          no electrical work is required. All alarms
          must be correctly positioned and interconnected
          in accordance with Queensland's prescribed
          placement distances and installation requirements.
        
      

      
        3. Replacing hardwired alarms
        
          Existing 240V hardwired smoke alarms
          must be replaced with compliant
          hardwired photoelectric alarms,
          not battery-only models.
          A licensed electrician must carry
          out the electrical replacement.
        
      

    

  

  
    Important:
    Smoke alarm placement and power-source requirements
    depend on the dwelling's layout and existing
    installation. Consult the
    
      Queensland Fire Department's official guidance
    
    or a suitably qualified installer if uncertain.
  






A fire doesn't wait for smoke to reach your bedroom



A fire may begin in a part of the house far removed from where occupants are sleeping. In a conventional arrangement of independent alarms, someone at the opposite end of the property may not receive a warning until smoke reaches an alarm closer to their bedroom.



Interconnected alarms address that delay by activating throughout the home when any one of the connected devices detects smoke.



The practical importance becomes particularly clear in larger houses, multi-storey properties and homes where bedroom doors are kept closed overnight. A fire starting in one sleeping area can trigger alarms elsewhere, alerting other occupants who may be able to assist.



In my own home, our bedroom is at one end of the house and our children's bedrooms are at the other. They sleep with their doors closed, as many children do. If a fire were to start in one of their rooms, I would want to know immediately, rather than wait for smoke to reach an alarm closer to where we sleep.



That is why interconnection matters. We want the warning travelling through the house faster than the smoke, giving everyone the earliest possible opportunity to respond.



The last-minute rush Queenslanders could do without



Despite years of public information campaigns, awareness of the legislation has not necessarily translated into completed installations.



The Queensland Fire Department's 2025 Community Insights Survey found that 72 per cent of respondents were aware of the interconnected smoke alarm legislation, but only 54 per cent knew about the 1 January 2027 deadline. At the time of the survey, 52 per cent reported having interconnected alarms installed.



These figures reflect what respondents reported rather than independently verified compliance, but they indicate that a substantial number of Queensland households may still need to review their arrangements.



A concentrated rush in the final weeks could also place pressure on product availability and electrician appointments. While shortages are not inevitable, households that act earlier have more time to understand their options, obtain advice and arrange any necessary installation work.



An initial assessment need not be complicated. Homeowners can begin by checking the location and manufacture date of their existing alarms, confirming whether they are photoelectric and interconnected, and testing that they operate correctly. They should also establish whether every required sleeping area and storey has appropriate coverage.



For households with existing hardwired systems, advice from a licensed electrician can help determine what needs replacing and how additional alarms can be incorporated.



A compliant home isn't necessarily a safer home for everyone



Queensland's legislation establishes a minimum standard for residential smoke alarm protection, but the circumstances of the people living in each home can be just as important as the building itself.



An audible warning, for example, may not be sufficient for someone who is deaf or hard of hearing, while a person with limited mobility may require additional time or assistance to evacuate. These considerations do not change the legal requirements, but they can influence whether a household needs supplementary warning equipment or other safety arrangements.



Families should also develop and practise an escape plan that accounts for the needs of everyone living in the home, including children, older residents and people who may require assistance. Installing compliant alarms is important, but knowing how to respond when they sound is another essential part of household fire safety.



Homeowners who have yet to complete their upgrades should begin by reviewing their existing alarms, checking the requirements for their property and arranging professional advice where needed. Leaving the work until the final weeks of December may unnecessarily limit their options.



Queensland's smoke alarm reforms were introduced to improve the warning people receive when fire breaks out at home. Meeting the requirements before 1 January 2027 is an important step, but the greater responsibility is ensuring that everyone in the household knows what to do when those alarms sound.




  
    .cb-author-box,
    .cb-author-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-author-box {
      width: 100%;
      max-width: 100%;
      margin: 30px 0;
      padding: 23px;
      background: #f7f8f9;
      border: 1px solid #dce1e5;
      border-radius: 7px;
      color: #283740;
      font: 15px/1.6 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      hyphens: none;
    }

    .cb-author-main {
      display: grid;
      grid-template-columns: 145px minmax(0, 1fr);
      gap: 22px;
      align-items: start;
    }

    .cb-author-photo {
      width: 145px;
      max-width: 100%;
      height: auto;
      display: block;
      border-radius: 5px;
      object-fit: contain;
    }

    .cb-author-copy h3 {
      margin: 0 0 10px;
      color: #203b50;
      font-size: 21px;
      line-height: 1.3;
      font-weight: 700;
    }

    .cb-author-copy p {
      margin: 0;
      line-height: 1.65;
    }

    .cb-author-copy a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-author-copy a:hover,
    .cb-author-copy a:focus {
      color: #40566a;
    }

    .cb-author-box .cb-series-note {
      margin: 19px 0 0;
      padding: 13px 0 0;
      border-top: 1px solid #dce1e5;
      color: #586670;
      font-size: 13px;
      line-height: 1.6;
      font-style: italic;
    }

    @media (max-width: 600px) {
      .cb-author-box {
        padding: 19px 16px;
        margin: 24px 0;
      }

      .cb-author-main {
        grid-template-columns: minmax(0, 1fr);
        gap: 15px;
      }

      .cb-author-photo {
        width: 150px;
        max-width: 65%;
        height: auto;
        margin: 0 auto;
      }

      .cb-author-copy h3 {
        font-size: 20px;
      }
    }
  

  

    
      
    

    
      About Cathy Brand

      
        Cathy Brand is the Chief
        Executive Officer of
        Brooks Australia,
        a provider of fire detection and warning
        technology. Through her work in the fire
        safety industry, she advocates for greater
        awareness of residential fire protection,
        interconnected smoke alarm systems and
        solutions that consider the needs of
        different households.
      
    

  

  
    Home Fire Safety with Cathy Brand is a five-part
    sponsored editorial series presented in
    partnership with Brooks Australia.
  




Published 27-October-2026




]]></description>
<content:encoded><![CDATA[




By Cathy Brand | Fire Safety Advocate and CEO of Brooks Australia



A Queensland homeowner could have several working smoke alarms throughout their property and still fall short of the state's requirements when the final stage of its smoke alarm reforms takes effect on 1 January 2027.



The changes go well beyond replacing ageing devices. They affect where alarms must be installed, how they communicate with one another and the type of technology permitted. For households that have relied on the same arrangement for years, becoming compliant may involve a more substantial upgrade than expected.



With just over two months remaining, the approaching deadline also presents an opportunity to consider whether the warning system provides everyone in the home with the best possible chance of escaping a fire.



A decade of reform reaches its final deadline



Queensland's smoke alarm reforms have been introduced progressively over the past decade, beginning with new homes and substantial renovations in 2017. Properties being sold or leased were required to meet the upgraded standards from January 2022, while the final stage, commencing on 1 January 2027, applies to the remaining domestic dwellings.




  
    .cb-history-box,
    .cb-history-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-history-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px 26px;
      background: #f5f6f7;
      border: 1px solid #d9dee2;
      border-left: 5px solid #40566a;
      border-radius: 7px;
      color: #26323b;
      font: 16px/1.65 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-history-box h3 {
      margin: 0 0 17px;
      color: #203b50;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
      hyphens: none;
    }

    .cb-history-box p {
      margin: 0 0 14px;
      line-height: 1.65;
      hyphens: none;
    }

    .cb-history-box p:last-child {
      margin-bottom: 0;
    }

    .cb-history-box strong {
      color: #203b50;
    }

    .cb-history-box a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-history-box a:hover,
    .cb-history-box a:focus {
      color: #40566a;
    }

    @media (max-width: 600px) {
      .cb-history-box {
        padding: 19px 16px;
        margin: 22px 0;
        font-size: 15px;
      }

      .cb-history-box h3 {
        font-size: 19px;
      }
    }
  

  The Slacks Creek Tragedy That Changed Queensland's Smoke Alarm Laws

  
    On 24 August 2011, a house fire at Slacks Creek,
    south of Brisbane, claimed 11 lives, including
    eight children. The disaster became
    a defining tragedy in Queensland's
    approach to residential fire safety,
    ultimately helping drive some of the country's
    most significant smoke alarm reforms.
  

  
    The coronial inquest, whose findings were
    delivered on 28 November 2014, examined
    the failure of the home's smoke alarms.
    The coroner concluded there was a reasonable
    prospect that some or all of those who died
    could have escaped had the alarms been working.
  

  
    The coroner's recommendations helped shape
    sweeping changes to Queensland's smoke alarm
    laws. Legislation passed in 2016 introduced
    a ten-year transition towards photoelectric,
    interconnected alarms installed in bedrooms,
    connecting hallways and on every storey.
  

  
    The reforms began taking effect in January 2017,
    with the final stage due on 1 January 2027.
  

  
    The changes reflect a fundamental lesson from
    the tragedy: providing an earlier warning
    throughout a home can give occupants more
    time to escape.
  




The legislation requires photoelectric smoke alarms complying with Australian Standard AS 3786:2014, without an ionisation sensor. They must be less than ten years old, operate when tested and be interconnected so that when one alarm activates, all connected alarms sound.



Placement is equally important. Alarms are required in every bedroom, in hallways connecting bedrooms to the rest of the dwelling and on each storey, with additional provisions for levels without bedrooms. A home with functioning alarms in its hallways, for example, may still need additional units inside bedrooms to satisfy the requirements.



One common misconception is that compliance necessarily involves extensive rewiring. Queensland permits compliant alarms powered by non-removable ten-year batteries in existing dwellings where appropriate, and wireless interconnection can provide an alternative to running interconnect cables throughout a property.



However, an existing hardwired smoke alarm must be replaced with another hardwired unit, with the electrical work undertaken by a licensed electrician. New homes and substantial renovations have separate hardwiring requirements. Depending on the home's existing installation, a combination of hardwired and compatible wireless interconnected alarms may also be suitable.





  
    .cb-compliance-box,
    .cb-compliance-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-compliance-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px;
      background: #fff7f8;
      border: 1px solid #e8cbd1;
      border-left: 5px solid #CF0A2C;
      border-radius: 7px;
      color: #2E2A25;
      font: 16px/1.55 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-box h3 {
      margin: 0 0 12px;
      color: #CF0A2C;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-box .cb-intro {
      margin: 0 0 19px;
      line-height: 1.6;
    }

    .cb-compliance-grid {
      display: grid;
      grid-template-columns: repeat(2, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-compliance-item {
      min-width: 0;
      padding: 14px 15px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-item strong {
      display: block;
      margin-bottom: 5px;
      color: #CF0A2C;
      font-size: 15px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-item p {
      margin: 0;
      color: #2E2A25;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-install-section {
      margin-top: 24px;
      padding-top: 19px;
      border-top: 2px solid #e8cbd1;
    }

    .cb-install-section h4 {
      margin: 0 0 8px;
      color: #CF0A2C;
      font-size: 19px;
      line-height: 1.35;
      font-weight: 700;
    }

    .cb-install-intro {
      margin: 0 0 15px;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-install-grid {
      display: grid;
      grid-template-columns: repeat(3, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-install-item {
      min-width: 0;
      padding: 14px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
    }

    .cb-install-item strong {
      display: block;
      margin-bottom: 7px;
      color: #CF0A2C;
      font-size: 15px;
      line-height: 1.4;
    }

    .cb-install-item p {
      margin: 0;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-compliance-note {
      margin: 20px 0 0;
      padding-top: 14px;
      border-top: 1px solid #e8cbd1;
      color: #403a37;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-compliance-note strong {
      color: #CF0A2C;
    }

    @media (max-width: 650px) {
      .cb-compliance-box {
        padding: 18px 15px;
        margin: 22px 0;
      }

      .cb-compliance-box h3 {
        font-size: 19px;
      }

      .cb-compliance-grid,
      .cb-install-grid {
        grid-template-columns: minmax(0, 1fr);
        gap: 9px;
      }

      .cb-compliance-item,
      .cb-install-item {
        padding: 12px 13px;
      }

      .cb-install-section h4 {
        font-size: 18px;
      }

      .cb-compliance-note {
        font-size: 13px;
      }
    }
  

  
    Queensland's 2027 Smoke Alarm Rules:
    A Homeowner's Checklist
  

  
    By 1 January 2027, all remaining private homes,
    townhouses and units in Queensland must comply
    with the state's upgraded smoke alarm requirements.
  

  

    
      Alarm type
      
        Required alarms must be photoelectric,
        comply with AS 3786:2014 and contain
        no ionisation sensor.
      
    

    
      Age
      
        Alarms must be less than ten years old
        from their manufacture date.
      
    

    
      Interconnection
      
        All required alarms must be interconnected
        so that when one activates, they all sound.
      
    

    
      Bedrooms
      
        An alarm must be installed in every bedroom.
      
    

    
      Hallways
      
        Alarms must be installed in hallways connecting
        bedrooms to the rest of the dwelling. Where
        there is no hallway, an alarm must be installed
        between the bedrooms and other parts
        of the storey.
      
    

    
      Every storey
      
        Each level requires appropriate coverage.
        On storeys without bedrooms, an alarm must
        be installed in the most likely path of
        travel to an exit.
      
    

    
      Power source
      
        Alarms must be hardwired or use a
        non-removable ten-year battery, as permitted
        for the property. New homes and substantial
        renovations require hardwired alarms.
      
    

    
      Hardwired replacements
      
        Existing 240V hardwired smoke alarms must
        be replaced with compliant hardwired
        photoelectric alarms, not battery-only models.
        A licensed electrician must carry out
        the electrical replacement.
      
    

    
      Operation
      
        All alarms must work when tested.
      
    

  

  

    Who Can Install Your Smoke Alarms?

    
      Queensland law does not require every smoke
      alarm to be installed by an electrician.
      The requirements depend on the alarm's
      power source and whether electrical work
      is involved.
    

    

      
        1. New hardwired alarms
        
          A licensed electrician is required
          to install 240V hardwired smoke alarms.
          This includes electrical wiring and
          connections to mains power.
        
      

      
        2. Battery-powered alarms
        
          Homeowners can generally install compliant
          photoelectric alarms powered by non-removable
          ten-year batteries themselves, provided
          no electrical work is required. All alarms
          must be correctly positioned and interconnected
          in accordance with Queensland's prescribed
          placement distances and installation requirements.
        
      

      
        3. Replacing hardwired alarms
        
          Existing 240V hardwired smoke alarms
          must be replaced with compliant
          hardwired photoelectric alarms,
          not battery-only models.
          A licensed electrician must carry
          out the electrical replacement.
        
      

    

  

  
    Important:
    Smoke alarm placement and power-source requirements
    depend on the dwelling's layout and existing
    installation. Consult the
    
      Queensland Fire Department's official guidance
    
    or a suitably qualified installer if uncertain.
  






A fire doesn't wait for smoke to reach your bedroom



A fire may begin in a part of the house far removed from where occupants are sleeping. In a conventional arrangement of independent alarms, someone at the opposite end of the property may not receive a warning until smoke reaches an alarm closer to their bedroom.



Interconnected alarms address that delay by activating throughout the home when any one of the connected devices detects smoke.



The practical importance becomes particularly clear in larger houses, multi-storey properties and homes where bedroom doors are kept closed overnight. A fire starting in one sleeping area can trigger alarms elsewhere, alerting other occupants who may be able to assist.



In my own home, our bedroom is at one end of the house and our children's bedrooms are at the other. They sleep with their doors closed, as many children do. If a fire were to start in one of their rooms, I would want to know immediately, rather than wait for smoke to reach an alarm closer to where we sleep.



That is why interconnection matters. We want the warning travelling through the house faster than the smoke, giving everyone the earliest possible opportunity to respond.



The last-minute rush Queenslanders could do without



Despite years of public information campaigns, awareness of the legislation has not necessarily translated into completed installations.



The Queensland Fire Department's 2025 Community Insights Survey found that 72 per cent of respondents were aware of the interconnected smoke alarm legislation, but only 54 per cent knew about the 1 January 2027 deadline. At the time of the survey, 52 per cent reported having interconnected alarms installed.



These figures reflect what respondents reported rather than independently verified compliance, but they indicate that a substantial number of Queensland households may still need to review their arrangements.



A concentrated rush in the final weeks could also place pressure on product availability and electrician appointments. While shortages are not inevitable, households that act earlier have more time to understand their options, obtain advice and arrange any necessary installation work.



An initial assessment need not be complicated. Homeowners can begin by checking the location and manufacture date of their existing alarms, confirming whether they are photoelectric and interconnected, and testing that they operate correctly. They should also establish whether every required sleeping area and storey has appropriate coverage.



For households with existing hardwired systems, advice from a licensed electrician can help determine what needs replacing and how additional alarms can be incorporated.



A compliant home isn't necessarily a safer home for everyone



Queensland's legislation establishes a minimum standard for residential smoke alarm protection, but the circumstances of the people living in each home can be just as important as the building itself.



An audible warning, for example, may not be sufficient for someone who is deaf or hard of hearing, while a person with limited mobility may require additional time or assistance to evacuate. These considerations do not change the legal requirements, but they can influence whether a household needs supplementary warning equipment or other safety arrangements.



Families should also develop and practise an escape plan that accounts for the needs of everyone living in the home, including children, older residents and people who may require assistance. Installing compliant alarms is important, but knowing how to respond when they sound is another essential part of household fire safety.



Homeowners who have yet to complete their upgrades should begin by reviewing their existing alarms, checking the requirements for their property and arranging professional advice where needed. Leaving the work until the final weeks of December may unnecessarily limit their options.



Queensland's smoke alarm reforms were introduced to improve the warning people receive when fire breaks out at home. Meeting the requirements before 1 January 2027 is an important step, but the greater responsibility is ensuring that everyone in the household knows what to do when those alarms sound.




  
    .cb-author-box,
    .cb-author-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-author-box {
      width: 100%;
      max-width: 100%;
      margin: 30px 0;
      padding: 23px;
      background: #f7f8f9;
      border: 1px solid #dce1e5;
      border-radius: 7px;
      color: #283740;
      font: 15px/1.6 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      hyphens: none;
    }

    .cb-author-main {
      display: grid;
      grid-template-columns: 145px minmax(0, 1fr);
      gap: 22px;
      align-items: start;
    }

    .cb-author-photo {
      width: 145px;
      max-width: 100%;
      height: auto;
      display: block;
      border-radius: 5px;
      object-fit: contain;
    }

    .cb-author-copy h3 {
      margin: 0 0 10px;
      color: #203b50;
      font-size: 21px;
      line-height: 1.3;
      font-weight: 700;
    }

    .cb-author-copy p {
      margin: 0;
      line-height: 1.65;
    }

    .cb-author-copy a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-author-copy a:hover,
    .cb-author-copy a:focus {
      color: #40566a;
    }

    .cb-author-box .cb-series-note {
      margin: 19px 0 0;
      padding: 13px 0 0;
      border-top: 1px solid #dce1e5;
      color: #586670;
      font-size: 13px;
      line-height: 1.6;
      font-style: italic;
    }

    @media (max-width: 600px) {
      .cb-author-box {
        padding: 19px 16px;
        margin: 24px 0;
      }

      .cb-author-main {
        grid-template-columns: minmax(0, 1fr);
        gap: 15px;
      }

      .cb-author-photo {
        width: 150px;
        max-width: 65%;
        height: auto;
        margin: 0 auto;
      }

      .cb-author-copy h3 {
        font-size: 20px;
      }
    }
  

  

    
      
    

    
      About Cathy Brand

      
        Cathy Brand is the Chief
        Executive Officer of
        Brooks Australia,
        a provider of fire detection and warning
        technology. Through her work in the fire
        safety industry, she advocates for greater
        awareness of residential fire protection,
        interconnected smoke alarm systems and
        solutions that consider the needs of
        different households.
      
    

  

  
    Home Fire Safety with Cathy Brand is a five-part
    sponsored editorial series presented in
    partnership with Brooks Australia.
  




Published 27-October-2026




]]></content:encoded>
</item><item>
<title><![CDATA[Brisbane Dawn Economy Consultation Opens as City Plans for Early Risers]]></title>
<link>https://forestlakenews.com.au/brisbane-dawn-economy-plan-2026/brisbane-dawn-economy-plan-2026</link>
<media:content url="https://forestlakenews.com.au/wp-content/uploads/2026/10/Brisbane-Dawn-Economy-FI.png" medium="image"/>
<media:thumbnail url="https://forestlakenews.com.au/wp-content/uploads/2026/10/Brisbane-Dawn-Economy-FI.png"/>
<enclosure url="https://forestlakenews.com.au/wp-content/uploads/2026/10/Brisbane-Dawn-Economy-FI.png" length="1624527" type="image/png"/>
<pubDate>Wed, 28 Oct 2026 01:47:57 +0000</pubDate>
<dc:creator><![CDATA[Forest Lake News]]></dc:creator>
<guid isPermaLink="true">https://forestlakenews.com.au/brisbane-dawn-economy-plan-2026/</guid>
<description><![CDATA[


Brisbane's early-morning routines could receive greater attention under a new citywide plan examining improvements to public facilities, walking and cycling routes, transport connections and opportunities for businesses trading before sunrise.



Brisbane City Council opened&nbsp;public consultation&nbsp;on 20 October 2026, inviting residents to share how they use the city between 4:00 a.m. and 7:00 a.m. The five-minute survey closes at 11:59 p.m. on Sunday, 22 November 2026, with responses intended to guide future planning and investment.




HAVE YOUR SAY




Better lighting, paths and public facilities under consideration



The proposed&nbsp;Dawn Economy Plan&nbsp;considers improved lighting along walking and running routes, more drinking fountains and public toilets, additional shade and seating in parks, and better connections between pedestrian and cycling paths.



Residents are being asked where they go, what activities they undertake and which improvements would make Brisbane easier to navigate in the early hours. Public transport connections and opportunities for early-trading businesses are also part of the consultation.



No suburb-specific upgrades have been approved through the plan. Council will use community feedback to help establish priorities, while businesses and precinct representatives will be consulted about opportunities to support morning activity.



Brisbane's early trading leads other capitals



Research by Ingenium&nbsp;found that one in eight Brisbane food and drink venues was trading at 5:00 a.m., compared with one in 25 in Sydney and one in 33 in Melbourne and Perth.



Further analysis by researcher Dr Anna Edwards found that approximately one-third of Brisbane's food and drink businesses were operating between 6:00 a.m. and 7:00 a.m., with around half open by 8:00 a.m.



Dr Edwards identified Brisbane's established early-trading patterns as an economic advantage, supported by the city's outdoor lifestyle and demand for morning hospitality and recreation.



Council has also highlighted Brisbane's 19 Saturday parkruns, which attract thousands of runners, walkers and volunteers, as evidence of the city's established appetite for early outdoor activity.



Lord Mayor Adrian Schrinner said the consultation would help identify practical improvements for residents who already use Brisbane's parks, pathways, pools and hospitality venues before the conventional working day begins.



Five precinct connections proposed across Brisbane



The&nbsp;Committee for Brisbane's Dawn Economy Position Paper, released on 18 October, examines economic activity between 5:00 a.m. and 9:00 a.m. and proposes stronger connections between major recreation, cultural, education and business precincts.



Its recommendations identify five potential corridors spanning the Brisbane River, education and research centres, recreation areas, cultural destinations and sporting facilities.



The proposed connections include South Bank and Kangaroo Point along the river, Mt Coot-tha and Victoria Park through the recreation corridor, and Fortitude Valley, New Farm and West End through the cultural corridor. No construction commitments have been announced for these recommendations.





  Five Proposed Dawn Economy Connections Across Brisbane

  
    The Committee for Brisbane has identified five potential
    connections between major activity precincts.
  

  
    River corridor
    Howard Smith Wharves, CBD, Botanic Gardens,
    South Bank and Kangaroo Point.
  

  
    Knowledge corridor
    Herston, Kelvin Grove, Roma Street, CBD,
    Gardens Point and Boggo Road.
  

  
    Recreation corridor
    Mt Coot-tha, Victoria Park, Spring Hill,
    CBD and Kangaroo Point.
  

  
    Cultural corridor
    Fortitude Valley, New Farm, Howard Smith Wharves,
    Queensland Cultural Centre and West End.
  

  
    Sports corridor
    Ballymore, Victoria Park, RNA Showgrounds,
    Woolloongabba and Queensland Tennis Centre.
  

  
    Planning status:
    These connections are recommendations, not approved
    or funded construction projects.
  

  
    Source:
    
      Committee for Brisbane, Dawn Economy Position Paper
    , October 2026, page 13.
  



.bson-dawn-box {
  background: #f3f7fb;
  border: 1px solid #d5e1ed;
  border-left: 5px solid #23608c;
  border-radius: 6px;
  padding: 24px;
  margin: 28px 0;
  color: #263746;
  font-family: inherit;
  line-height: 1.65;
}

.bson-dawn-box h3 {
  font-size: 21px;
  line-height: 1.35;
  color: #183b56;
  margin: 0 0 12px;
  font-weight: 700;
}

.bson-dawn-intro {
  margin: 0 0 18px;
  font-size: 15px;
}

.bson-dawn-item {
  border-top: 1px solid #d5e1ed;
  padding: 13px 0;
}

.bson-dawn-item h4 {
  font-size: 16px;
  font-weight: 700;
  color: #205c83;
  margin: 0 0 4px;
}

.bson-dawn-item p {
  margin: 0;
  font-size: 15px;
}

.bson-dawn-box .bson-dawn-note {
  background: #e5eef6;
  border-radius: 4px;
  padding: 12px 14px;
  margin: 16px 0 12px;
  font-size: 13px;
}

.bson-dawn-source {
  font-size: 12px;
  color: #586a79;
  margin: 0;
}

.bson-dawn-source a {
  color: #205c83;
  text-decoration: underline;
}

@media (max-width: 600px) {
  .bson-dawn-box {
    padding: 18px;
  }

  .bson-dawn-box h3 {
    font-size: 19px;
  }

  .bson-dawn-item p,
  .bson-dawn-intro {
    font-size: 14px;
  }
}





The Committee also advocates a coordinated 24-hour economy strategy, opportunities in wellness tourism and greater use of Brisbane's outdoor lifestyle as the city prepares for the 2032 Olympic and Paralympic Games.



Committee for Brisbane chief executive Jen Williams has identified early-morning activity as an opportunity to strengthen the city's economy alongside its established night-time hospitality and entertainment sectors.



Queensland's&nbsp;draft State Planning Policy&nbsp;also recognises dawn and night-time economic activity as considerations in land-use planning. Public consultation on the draft closed on 26 October, with the final policy yet to be settled.



Existing recreation investment and transport priorities



Brisbane City Council has separately announced a $5.6 million investment in&nbsp;Move Well Brisbane, expanding its existing Active and Healthy programme. Council says the initiative will deliver 20,000 free and low-cost activity sessions over two years and involve approximately 400 local businesses.



Activities will be available across mornings, evenings and weekends, including fitness, nutrition and wellbeing programmes. Funding for Move Well Brisbane is separate from any future infrastructure commitments arising from the Dawn Economy Plan.



Council Opposition Leader Jared Cassidy criticised the survey as unnecessary, arguing that council should prioritise earlier public transport services and improved lighting in parks and along bikeways, particularly during winter mornings.



The Dawn Economy Plan remains in development, with no confirmed list of suburb-specific upgrades, construction timetable or dedicated infrastructure budget. Feedback from residents, businesses and precinct representatives will help inform the council's next steps.



Published 27-Oct-2026Featured Image Credit: Committee for Brisbane




]]></description>
<content:encoded><![CDATA[


Brisbane's early-morning routines could receive greater attention under a new citywide plan examining improvements to public facilities, walking and cycling routes, transport connections and opportunities for businesses trading before sunrise.



Brisbane City Council opened&nbsp;public consultation&nbsp;on 20 October 2026, inviting residents to share how they use the city between 4:00 a.m. and 7:00 a.m. The five-minute survey closes at 11:59 p.m. on Sunday, 22 November 2026, with responses intended to guide future planning and investment.




HAVE YOUR SAY




Better lighting, paths and public facilities under consideration



The proposed&nbsp;Dawn Economy Plan&nbsp;considers improved lighting along walking and running routes, more drinking fountains and public toilets, additional shade and seating in parks, and better connections between pedestrian and cycling paths.



Residents are being asked where they go, what activities they undertake and which improvements would make Brisbane easier to navigate in the early hours. Public transport connections and opportunities for early-trading businesses are also part of the consultation.



No suburb-specific upgrades have been approved through the plan. Council will use community feedback to help establish priorities, while businesses and precinct representatives will be consulted about opportunities to support morning activity.



Brisbane's early trading leads other capitals



Research by Ingenium&nbsp;found that one in eight Brisbane food and drink venues was trading at 5:00 a.m., compared with one in 25 in Sydney and one in 33 in Melbourne and Perth.



Further analysis by researcher Dr Anna Edwards found that approximately one-third of Brisbane's food and drink businesses were operating between 6:00 a.m. and 7:00 a.m., with around half open by 8:00 a.m.



Dr Edwards identified Brisbane's established early-trading patterns as an economic advantage, supported by the city's outdoor lifestyle and demand for morning hospitality and recreation.



Council has also highlighted Brisbane's 19 Saturday parkruns, which attract thousands of runners, walkers and volunteers, as evidence of the city's established appetite for early outdoor activity.



Lord Mayor Adrian Schrinner said the consultation would help identify practical improvements for residents who already use Brisbane's parks, pathways, pools and hospitality venues before the conventional working day begins.



Five precinct connections proposed across Brisbane



The&nbsp;Committee for Brisbane's Dawn Economy Position Paper, released on 18 October, examines economic activity between 5:00 a.m. and 9:00 a.m. and proposes stronger connections between major recreation, cultural, education and business precincts.



Its recommendations identify five potential corridors spanning the Brisbane River, education and research centres, recreation areas, cultural destinations and sporting facilities.



The proposed connections include South Bank and Kangaroo Point along the river, Mt Coot-tha and Victoria Park through the recreation corridor, and Fortitude Valley, New Farm and West End through the cultural corridor. No construction commitments have been announced for these recommendations.





  Five Proposed Dawn Economy Connections Across Brisbane

  
    The Committee for Brisbane has identified five potential
    connections between major activity precincts.
  

  
    River corridor
    Howard Smith Wharves, CBD, Botanic Gardens,
    South Bank and Kangaroo Point.
  

  
    Knowledge corridor
    Herston, Kelvin Grove, Roma Street, CBD,
    Gardens Point and Boggo Road.
  

  
    Recreation corridor
    Mt Coot-tha, Victoria Park, Spring Hill,
    CBD and Kangaroo Point.
  

  
    Cultural corridor
    Fortitude Valley, New Farm, Howard Smith Wharves,
    Queensland Cultural Centre and West End.
  

  
    Sports corridor
    Ballymore, Victoria Park, RNA Showgrounds,
    Woolloongabba and Queensland Tennis Centre.
  

  
    Planning status:
    These connections are recommendations, not approved
    or funded construction projects.
  

  
    Source:
    
      Committee for Brisbane, Dawn Economy Position Paper
    , October 2026, page 13.
  



.bson-dawn-box {
  background: #f3f7fb;
  border: 1px solid #d5e1ed;
  border-left: 5px solid #23608c;
  border-radius: 6px;
  padding: 24px;
  margin: 28px 0;
  color: #263746;
  font-family: inherit;
  line-height: 1.65;
}

.bson-dawn-box h3 {
  font-size: 21px;
  line-height: 1.35;
  color: #183b56;
  margin: 0 0 12px;
  font-weight: 700;
}

.bson-dawn-intro {
  margin: 0 0 18px;
  font-size: 15px;
}

.bson-dawn-item {
  border-top: 1px solid #d5e1ed;
  padding: 13px 0;
}

.bson-dawn-item h4 {
  font-size: 16px;
  font-weight: 700;
  color: #205c83;
  margin: 0 0 4px;
}

.bson-dawn-item p {
  margin: 0;
  font-size: 15px;
}

.bson-dawn-box .bson-dawn-note {
  background: #e5eef6;
  border-radius: 4px;
  padding: 12px 14px;
  margin: 16px 0 12px;
  font-size: 13px;
}

.bson-dawn-source {
  font-size: 12px;
  color: #586a79;
  margin: 0;
}

.bson-dawn-source a {
  color: #205c83;
  text-decoration: underline;
}

@media (max-width: 600px) {
  .bson-dawn-box {
    padding: 18px;
  }

  .bson-dawn-box h3 {
    font-size: 19px;
  }

  .bson-dawn-item p,
  .bson-dawn-intro {
    font-size: 14px;
  }
}





The Committee also advocates a coordinated 24-hour economy strategy, opportunities in wellness tourism and greater use of Brisbane's outdoor lifestyle as the city prepares for the 2032 Olympic and Paralympic Games.



Committee for Brisbane chief executive Jen Williams has identified early-morning activity as an opportunity to strengthen the city's economy alongside its established night-time hospitality and entertainment sectors.



Queensland's&nbsp;draft State Planning Policy&nbsp;also recognises dawn and night-time economic activity as considerations in land-use planning. Public consultation on the draft closed on 26 October, with the final policy yet to be settled.



Existing recreation investment and transport priorities



Brisbane City Council has separately announced a $5.6 million investment in&nbsp;Move Well Brisbane, expanding its existing Active and Healthy programme. Council says the initiative will deliver 20,000 free and low-cost activity sessions over two years and involve approximately 400 local businesses.



Activities will be available across mornings, evenings and weekends, including fitness, nutrition and wellbeing programmes. Funding for Move Well Brisbane is separate from any future infrastructure commitments arising from the Dawn Economy Plan.



Council Opposition Leader Jared Cassidy criticised the survey as unnecessary, arguing that council should prioritise earlier public transport services and improved lighting in parks and along bikeways, particularly during winter mornings.



The Dawn Economy Plan remains in development, with no confirmed list of suburb-specific upgrades, construction timetable or dedicated infrastructure budget. Feedback from residents, businesses and precinct representatives will help inform the council's next steps.



Published 27-Oct-2026Featured Image Credit: Committee for Brisbane




]]></content:encoded>
</item><item>
<title><![CDATA[Acacia Ridge Families Seek New Operator as YMCA Prepares Childcare Centre Closure]]></title>
<link>https://sunnybankhillsnews.com.au/ymca-acacia-ridge-childcare-centre-closure</link>
<media:content url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/FI-for-OMC-2026-11-14T194759.595.webp" medium="image"/>
<media:thumbnail url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/FI-for-OMC-2026-11-14T194759.595.webp"/>
<enclosure url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/FI-for-OMC-2026-11-14T194759.595.webp" length="151736" type="image/webp"/>
<pubDate>Sat, 14 Nov 2026 11:55:17 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[Acacia Ridge]]></category>
<category><![CDATA[Acacia Ridge childcare centre]]></category>
<category><![CDATA[Rise Early Learning Birtinya]]></category>
<category><![CDATA[YMCA Acacia Ridge Early Education Centre]]></category>
<dc:creator><![CDATA[Sunnybank Hills News]]></dc:creator>
<guid isPermaLink="true">https://sunnybankhillsnews.com.au/?page_id=14834</guid>
<description><![CDATA[
Acacia Ridge families are preparing to lose a 75-place childcare centre just one week before Christmas, with the YMCA set to close its early education service despite interest from two not-for-profit providers in potentially taking over the operation.







Read: Sunkids to Open State-of-the-Art Childcare Facility at Brisbane Technology Park







The YMCA Acacia Ridge Early Education Centre, at the corner of Mannington Road and Chifley Street, is scheduled to have its final day on Friday, 18 December 2026. Families were informed of the decision on 19 October, according to a campaign launched by parents seeking to keep the service operating.



The proposed closure has prompted questions about whether another organisation could continue running the centre, particularly after the YMCA transferred its other Queensland long day care service to a new operator earlier this year.



Photo credit: Google Maps/YMCA Acacia Ridge Early Learning Centre



The Birtinya centre, located at Sunshine Coast University Hospital on the Sunshine Coast, changed operators on 25 May 2026. It now operates as Rise Early Learning Birtinya, with the national childcare register confirming the new provider and its commencement date.



Parents campaigning to save the Acacia Ridge service said two not-for-profit organisations have expressed interest in assessing whether they could take over the centre. They want the YMCA to allow those providers to examine the facility and consider its financial and operational viability before the existing service approval is surrendered.



Photo credit: Google Maps/YMCA Acacia Ridge Early Learning Centre



The YMCA has reportedly told families it is not pursuing a service transfer. It has also lodged notice with Queensland's regulatory authority to surrender the Acacia Ridge service approval, according to correspondence described in the parents' media release.



The regulatory implications are significant. Under the Education and Care Services National Law, a service approval is cancelled on the date a voluntary surrender takes effect. Once cancelled, the existing approval cannot simply be transferred to another operator. A prospective replacement would need to obtain the necessary regulatory approval.



Parents say the regulator confirmed on 4 November that the YMCA had lodged the surrender notice and met the relevant requirements. The campaign is being led by Acacia Ridge parent Luke McMahon, who is asking the YMCA to reconsider its approach and give interested organisations an opportunity to assess the centre.



A Change.org petition launched on 27 October calls on the YMCA and Brisbane City Council to work towards a handover that would keep the facility operating. Its requests include retaining existing enrolments where possible and offering continuing employment to educators who want to remain.



The building's ownership is another consideration. The parents' campaign says Brisbane City owns the premises and leases them to the YMCA for childcare use. It also says the lease extends to 2050. The lease document has not been independently examined, and any prospective operator would still need to secure the necessary arrangements with the property owner.



The national childcare register lists the Acacia Ridge centre as approved for 75 children and records an overall Meeting National Quality Standard rating, issued in June 2025. The centre provides long day care and vacation care.







Read: Retirement And Residential Care Facility Proposed On Eight Mile Plains







Families argue that keeping the service available would give local parents another option rather than requiring them to find alternative arrangements ahead of the new year. No replacement operator has been announced, and the YMCA's scheduled closure date remains 18 December 2026.





  What Happens When a Childcare Approval Is Surrendered?
  Under section 86 of the Education and Care Services National Law (Queensland):
  
    An approved provider can give written notice to surrender a service approval.
    The notice must specify the intended surrender date.
    Parents must receive at least 14 days' notice before the surrender takes effect.
    The service approval is cancelled on the specified effective date.
  
  A prospective replacement operator must obtain the necessary regulatory approval to operate the service.
  Source: Education and Care Services National Law (Queensland), section 86.
  Read the legislation



.childcare-approval-box {
  border: 1px solid #d9dfe5;
  border-radius: 8px;
  padding: 16px;
  margin: 20px 0;
  line-height: 1.6;
  overflow-wrap: anywhere;
}
.childcare-approval-box h3 {
  font-size: 19px;
  margin: 0 0 10px;
}
.childcare-approval-box ul {
  padding-left: 20px;
}
.childcare-approval-box li {
  margin-bottom: 8px;
}
.childcare-approval-box .source {
  font-size: 13px;
  color: #666;
}
.childcare-approval-box a {
  text-decoration: underline;
}
@media (max-width: 600px) {
  .childcare-approval-box {
    padding: 12px;
  }
  .childcare-approval-box h3 {
    font-size: 17px;
  }
}





Published 14-November-2026
]]></description>
<content:encoded><![CDATA[
Acacia Ridge families are preparing to lose a 75-place childcare centre just one week before Christmas, with the YMCA set to close its early education service despite interest from two not-for-profit providers in potentially taking over the operation.







Read: Sunkids to Open State-of-the-Art Childcare Facility at Brisbane Technology Park







The YMCA Acacia Ridge Early Education Centre, at the corner of Mannington Road and Chifley Street, is scheduled to have its final day on Friday, 18 December 2026. Families were informed of the decision on 19 October, according to a campaign launched by parents seeking to keep the service operating.



The proposed closure has prompted questions about whether another organisation could continue running the centre, particularly after the YMCA transferred its other Queensland long day care service to a new operator earlier this year.



Photo credit: Google Maps/YMCA Acacia Ridge Early Learning Centre



The Birtinya centre, located at Sunshine Coast University Hospital on the Sunshine Coast, changed operators on 25 May 2026. It now operates as Rise Early Learning Birtinya, with the national childcare register confirming the new provider and its commencement date.



Parents campaigning to save the Acacia Ridge service said two not-for-profit organisations have expressed interest in assessing whether they could take over the centre. They want the YMCA to allow those providers to examine the facility and consider its financial and operational viability before the existing service approval is surrendered.



Photo credit: Google Maps/YMCA Acacia Ridge Early Learning Centre



The YMCA has reportedly told families it is not pursuing a service transfer. It has also lodged notice with Queensland's regulatory authority to surrender the Acacia Ridge service approval, according to correspondence described in the parents' media release.



The regulatory implications are significant. Under the Education and Care Services National Law, a service approval is cancelled on the date a voluntary surrender takes effect. Once cancelled, the existing approval cannot simply be transferred to another operator. A prospective replacement would need to obtain the necessary regulatory approval.



Parents say the regulator confirmed on 4 November that the YMCA had lodged the surrender notice and met the relevant requirements. The campaign is being led by Acacia Ridge parent Luke McMahon, who is asking the YMCA to reconsider its approach and give interested organisations an opportunity to assess the centre.



A Change.org petition launched on 27 October calls on the YMCA and Brisbane City Council to work towards a handover that would keep the facility operating. Its requests include retaining existing enrolments where possible and offering continuing employment to educators who want to remain.



The building's ownership is another consideration. The parents' campaign says Brisbane City owns the premises and leases them to the YMCA for childcare use. It also says the lease extends to 2050. The lease document has not been independently examined, and any prospective operator would still need to secure the necessary arrangements with the property owner.



The national childcare register lists the Acacia Ridge centre as approved for 75 children and records an overall Meeting National Quality Standard rating, issued in June 2025. The centre provides long day care and vacation care.







Read: Retirement And Residential Care Facility Proposed On Eight Mile Plains







Families argue that keeping the service available would give local parents another option rather than requiring them to find alternative arrangements ahead of the new year. No replacement operator has been announced, and the YMCA's scheduled closure date remains 18 December 2026.





  What Happens When a Childcare Approval Is Surrendered?
  Under section 86 of the Education and Care Services National Law (Queensland):
  
    An approved provider can give written notice to surrender a service approval.
    The notice must specify the intended surrender date.
    Parents must receive at least 14 days' notice before the surrender takes effect.
    The service approval is cancelled on the specified effective date.
  
  A prospective replacement operator must obtain the necessary regulatory approval to operate the service.
  Source: Education and Care Services National Law (Queensland), section 86.
  Read the legislation



.childcare-approval-box {
  border: 1px solid #d9dfe5;
  border-radius: 8px;
  padding: 16px;
  margin: 20px 0;
  line-height: 1.6;
  overflow-wrap: anywhere;
}
.childcare-approval-box h3 {
  font-size: 19px;
  margin: 0 0 10px;
}
.childcare-approval-box ul {
  padding-left: 20px;
}
.childcare-approval-box li {
  margin-bottom: 8px;
}
.childcare-approval-box .source {
  font-size: 13px;
  color: #666;
}
.childcare-approval-box a {
  text-decoration: underline;
}
@media (max-width: 600px) {
  .childcare-approval-box {
    padding: 12px;
  }
  .childcare-approval-box h3 {
    font-size: 17px;
  }
}





Published 14-November-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Inventions]]></title>
<link>https://sunnybankhillsnews.com.au/inventions</link>
<pubDate>Thu, 12 Nov 2026 19:16:42 +0000</pubDate>
<dc:creator><![CDATA[Sunnybank Hills News]]></dc:creator>
<guid isPermaLink="true">https://sunnybankhillsnews.com.au/?page_id=14816</guid>
<description><![CDATA[]]></description>
<content:encoded><![CDATA[]]></content:encoded>
</item><item>
<title><![CDATA[Heavy Rain Floods Brisbane Roads as More Storms Threaten South East Queensland]]></title>
<link>https://sunnybankhillsnews.com.au/brisbane-roads-flood-more-storms-south-east-queensland/brisbane-roads-flood-more-storms-south-east-queensland</link>
<media:content url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires.png" medium="image"/>
<media:thumbnail url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires.png"/>
<enclosure url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires.png" length="1832827" type="image/png"/>
<pubDate>Thu, 12 Nov 2026 02:03:44 +0000</pubDate>
<dc:creator><![CDATA[Sunnybank Hills News]]></dc:creator>
<guid isPermaLink="true">https://sunnybankhillsnews.com.au/brisbane-roads-flood-more-storms-south-east-queensland/</guid>
<description><![CDATA[


Heavy rain has flooded roads across parts of Brisbane as residents in Moreton Bay, Redlands and surrounding South East Queensland communities prepare for another round of potentially severe thunderstorms following Wednesday's destructive weather.



The Bureau of Meteorology has warned that further storms could develop on Thursday, 12 November, bringing damaging winds, large hail and heavy rainfall capable of causing flash flooding.



The renewed threat comes as emergency crews continue clearing fallen trees, repairing damaged powerlines and responding to storm-related property damage. More than 80,000 homes and businesses across South East Queensland lost electricity at the height of Wednesday's storms, with tens of thousands still without power on Thursday morning.



Brisbane, Redlands and Moreton Bay were all affected by intense storm activity, with rainfall observations showing how quickly conditions deteriorated across southern and eastern suburbs.



Intense rainfall floods Brisbane streets



Some of Wednesday's heaviest rainfall was recorded in Brisbane's southern and eastern suburbs, where intense downpours delivered substantial amounts of rain in just half an hour.



Bureau of Meteorology observations recorded 78 millimetres at Wishart in the 30 minutes to 4:39 p.m., while Chandler received 75 millimetres in the 30 minutes to 4:52 p.m. Nearby Burbank recorded 59 millimetres over a similar period.



The short, intense bursts of rainfall created flash-flooding hazards on local roads and placed additional pressure on drainage systems.&nbsp;



In Gumdale, Formosa Road was closed to through traffic between Stanbrough Road and Dairy Swamp Road because of flash flooding. Emergency crews were also called to Gumdale on Wednesday evening after a vehicle became stranded in floodwater. Swiftwater rescue personnel assisted the driver to safety.



Elsewhere in Brisbane, a falling tree struck two vehicles on Logan Road at Eight Mile Plains as severe winds swept through the area.



Brisbane Airport recorded a wind gust of 96 kilometres per hour at 5:03 p.m. on Wednesday, with the severe weather causing flight delays, cancellations and temporary operational disruption.



Motorists are being urged to check road conditions before travelling, particularly in areas affected by heavy rain and fallen trees. Road restrictions may be lifted or introduced as conditions change.




BRISBANE EMERGENCY DASHBOARD








Redlands hit by heavy rain as storms move towards the bay



Redlands also experienced intense rainfall as Wednesday's thunderstorms moved across eastern Brisbane and towards Moreton Bay.



The Bureau recorded 75 millimetres of rain at Leslie Harrison Dam in the 30 minutes to 4:47 p.m., placing the area among the locations that experienced the most intense short-duration rainfall during the event.



At 5:19 p.m., the Bureau issued a severe thunderstorm warning covering parts of Redland City, Brisbane and Moreton Bay. Storms detected around Ormiston and Brisbane Airport were capable of producing damaging winds and heavy rainfall that could lead to flash flooding.



Cleveland, Victoria Point, Ormiston and nearby islands were among the locations identified in warnings as the storms developed during the afternoon.



The State Emergency Service received 16 requests for assistance across Redlands following Wednesday's weather, adding to hundreds of calls received throughout South East Queensland.



Residents in Cleveland, Capalaba, Wellington Point, Victoria Point and surrounding suburbs can check the Redlands Coast Disaster Dashboard for local warnings, road closures, electricity interruptions and emergency information.




REDLANDS COAST DISASTER DASHBOARD








The dashboard also provides evacuation information when relevant. No widespread evacuation order affecting Redlands has been established in the reports reviewed for this article.



Moreton Bay suburbs face further storm threat



Communities across Moreton Bay were also within the path of Wednesday's severe weather, with storm cells developing near Caboolture and Burpengary before moving towards the coast.



The Bureau's afternoon warnings identified conditions capable of producing damaging winds, large hail and intense rainfall across parts of the Moreton Bay region.



By early evening, the warning area extended towards the waters off Redcliffe, with Redcliffe and Scarborough among the locations forecast to be affected as the storms moved north and northeast.



Electricity interruptions were reported across the wider Moreton Bay region during Wednesday's severe weather, although the largest concentration of damage to the Energex network occurred further south in Logan and the Scenic Rim.



For residents in Caboolture, Morayfield, Burpengary, North Lakes, Redcliffe and neighbouring suburbs, the City of Moreton Bay Disaster Dashboard provides a central source of local emergency updates.




CITY OF MORETON BAY DISASTER DASHBOARD








The council's dashboard includes weather warnings, road conditions, power outages and information about emergency facilities and available disaster support services.



Residents should continue checking official updates, particularly where local roads, waterways or properties remain vulnerable to another period of heavy rainfall.



Electricity restoration continues across the south-east



Restoring electricity remains one of the largest recovery operations following Wednesday's storms, with widespread damage to powerlines, poles and other infrastructure.



Energex reported more than 400 sections of powerline brought down across South East Queensland, while more than 120,000 lightning strikes were recorded during the severe weather.



The worst electrical damage was concentrated in Logan and the Scenic Rim, where falling trees and damaged infrastructure left tens of thousands of properties disconnected.



By Thursday morning, approximately 55,000 properties across the region remained without power, according to ABC News reporting based on Energex information. Repair crews were being reinforced as assessments identified damaged poles and lines requiring replacement.



Some customers may face prolonged interruptions, particularly where access is obstructed or major infrastructure repairs are required.



Residents in Brisbane, Redlands and Moreton Bay can use the Energex Outage Finder to check reported power interruptions, affected locations and available restoration estimates.




ENERGEX OUTAGE FINDER








Energex has warned residents to remain clear of fallen electrical wires and to treat damaged powerlines as live. Electrical emergencies can be reported on 13 19 62.



School closures and transport disruption



Wednesday's storms also disrupted education across South East Queensland, with schools in the hardest-hit districts unable to operate normally because of damage and electricity interruptions.



Eleven state schools in the Logan City Council area were reported closed on Thursday morning, including campuses in Marsden, Crestmead, Jimboomba and Yarrabilba. Subsequent reporting placed the number of affected schools in the broader Logan and Jimboomba area at 13.



Within Brisbane, Mansfield State School cancelled a prep orientation session after experiencing telephone and internet disruption.



Parents across Brisbane, Moreton Bay and Redlands can check the Queensland Government's current emergency school closures register for information about affected state, independent and Catholic schools.




QLD SCHOOL CLOSURES








The register should be checked before travelling, as schools may reopen once power, access and safety conditions have been assessed. Families should also consult their school's own communications for local arrangements.



Transport disruption has extended beyond flooded roads. Brisbane Airport experienced delays and cancellations during Wednesday's storms, while local road hazards included fallen branches, damaged traffic infrastructure and standing water.



Drivers can check QLDTraffic or the Transport and Main Roads Road Status Update for restrictions affecting state-controlled roads. Council emergency dashboards provide additional local information.




TMR ROAD STATUS UPDATE








Emergency crews respond to hundreds of calls



The State Emergency Service received more than 320 requests for assistance across South East Queensland after Wednesday's storms.



Logan accounted for the majority of the calls, but emergency crews were also deployed across Brisbane, Redlands and other affected areas.



The requests largely involved fallen trees, damaged roofs, blocked access to properties and other storm-related hazards. Brisbane recorded 41 requests, while Redlands recorded 16.



Emergency workers have been clearing debris, securing damaged structures and helping residents protect properties exposed to further rainfall.



Authorities are also urging residents to avoid floodwater and stay away from fallen electrical infrastructure. Even shallow floodwater can conceal damaged road surfaces, debris and strong currents.



More severe thunderstorms possible



The Bureau of Meteorology has forecast another period of unsettled weather across South East Queensland on Thursday, with severe thunderstorms possible from the Gold Coast through Brisbane and the Sunshine Coast towards Bundaberg.



Forecasters have identified damaging winds, large hail and heavy rainfall leading to flash flooding as the main hazards.



The threat is particularly concerning for communities still dealing with damaged buildings, blocked access and electricity interruptions from Wednesday's storms.



Storm activity may ease in some districts on Friday before increasing again over the weekend as another weather system develops across inland Queensland.



Residents should monitor the Bureau of Meteorology's Queensland warnings and check their local council's emergency information before making travel plans.




BOM QUEENSLAND WARNINGS









  What residents should do
  
    Check weather warnings before travelling
    Avoid flooded roads and never drive through floodwater
    Stay clear of fallen powerlines
    Charge phones and devices while power is available
    Secure loose outdoor items where safe
    Call SES on 132 500 for non-life-threatening storm damage
    Call 000 in a life-threatening emergency
  




Published 12-Nov-2026
]]></description>
<content:encoded><![CDATA[


Heavy rain has flooded roads across parts of Brisbane as residents in Moreton Bay, Redlands and surrounding South East Queensland communities prepare for another round of potentially severe thunderstorms following Wednesday's destructive weather.



The Bureau of Meteorology has warned that further storms could develop on Thursday, 12 November, bringing damaging winds, large hail and heavy rainfall capable of causing flash flooding.



The renewed threat comes as emergency crews continue clearing fallen trees, repairing damaged powerlines and responding to storm-related property damage. More than 80,000 homes and businesses across South East Queensland lost electricity at the height of Wednesday's storms, with tens of thousands still without power on Thursday morning.



Brisbane, Redlands and Moreton Bay were all affected by intense storm activity, with rainfall observations showing how quickly conditions deteriorated across southern and eastern suburbs.



Intense rainfall floods Brisbane streets



Some of Wednesday's heaviest rainfall was recorded in Brisbane's southern and eastern suburbs, where intense downpours delivered substantial amounts of rain in just half an hour.



Bureau of Meteorology observations recorded 78 millimetres at Wishart in the 30 minutes to 4:39 p.m., while Chandler received 75 millimetres in the 30 minutes to 4:52 p.m. Nearby Burbank recorded 59 millimetres over a similar period.



The short, intense bursts of rainfall created flash-flooding hazards on local roads and placed additional pressure on drainage systems.&nbsp;



In Gumdale, Formosa Road was closed to through traffic between Stanbrough Road and Dairy Swamp Road because of flash flooding. Emergency crews were also called to Gumdale on Wednesday evening after a vehicle became stranded in floodwater. Swiftwater rescue personnel assisted the driver to safety.



Elsewhere in Brisbane, a falling tree struck two vehicles on Logan Road at Eight Mile Plains as severe winds swept through the area.



Brisbane Airport recorded a wind gust of 96 kilometres per hour at 5:03 p.m. on Wednesday, with the severe weather causing flight delays, cancellations and temporary operational disruption.



Motorists are being urged to check road conditions before travelling, particularly in areas affected by heavy rain and fallen trees. Road restrictions may be lifted or introduced as conditions change.




BRISBANE EMERGENCY DASHBOARD








Redlands hit by heavy rain as storms move towards the bay



Redlands also experienced intense rainfall as Wednesday's thunderstorms moved across eastern Brisbane and towards Moreton Bay.



The Bureau recorded 75 millimetres of rain at Leslie Harrison Dam in the 30 minutes to 4:47 p.m., placing the area among the locations that experienced the most intense short-duration rainfall during the event.



At 5:19 p.m., the Bureau issued a severe thunderstorm warning covering parts of Redland City, Brisbane and Moreton Bay. Storms detected around Ormiston and Brisbane Airport were capable of producing damaging winds and heavy rainfall that could lead to flash flooding.



Cleveland, Victoria Point, Ormiston and nearby islands were among the locations identified in warnings as the storms developed during the afternoon.



The State Emergency Service received 16 requests for assistance across Redlands following Wednesday's weather, adding to hundreds of calls received throughout South East Queensland.



Residents in Cleveland, Capalaba, Wellington Point, Victoria Point and surrounding suburbs can check the Redlands Coast Disaster Dashboard for local warnings, road closures, electricity interruptions and emergency information.




REDLANDS COAST DISASTER DASHBOARD








The dashboard also provides evacuation information when relevant. No widespread evacuation order affecting Redlands has been established in the reports reviewed for this article.



Moreton Bay suburbs face further storm threat



Communities across Moreton Bay were also within the path of Wednesday's severe weather, with storm cells developing near Caboolture and Burpengary before moving towards the coast.



The Bureau's afternoon warnings identified conditions capable of producing damaging winds, large hail and intense rainfall across parts of the Moreton Bay region.



By early evening, the warning area extended towards the waters off Redcliffe, with Redcliffe and Scarborough among the locations forecast to be affected as the storms moved north and northeast.



Electricity interruptions were reported across the wider Moreton Bay region during Wednesday's severe weather, although the largest concentration of damage to the Energex network occurred further south in Logan and the Scenic Rim.



For residents in Caboolture, Morayfield, Burpengary, North Lakes, Redcliffe and neighbouring suburbs, the City of Moreton Bay Disaster Dashboard provides a central source of local emergency updates.




CITY OF MORETON BAY DISASTER DASHBOARD








The council's dashboard includes weather warnings, road conditions, power outages and information about emergency facilities and available disaster support services.



Residents should continue checking official updates, particularly where local roads, waterways or properties remain vulnerable to another period of heavy rainfall.



Electricity restoration continues across the south-east



Restoring electricity remains one of the largest recovery operations following Wednesday's storms, with widespread damage to powerlines, poles and other infrastructure.



Energex reported more than 400 sections of powerline brought down across South East Queensland, while more than 120,000 lightning strikes were recorded during the severe weather.



The worst electrical damage was concentrated in Logan and the Scenic Rim, where falling trees and damaged infrastructure left tens of thousands of properties disconnected.



By Thursday morning, approximately 55,000 properties across the region remained without power, according to ABC News reporting based on Energex information. Repair crews were being reinforced as assessments identified damaged poles and lines requiring replacement.



Some customers may face prolonged interruptions, particularly where access is obstructed or major infrastructure repairs are required.



Residents in Brisbane, Redlands and Moreton Bay can use the Energex Outage Finder to check reported power interruptions, affected locations and available restoration estimates.




ENERGEX OUTAGE FINDER








Energex has warned residents to remain clear of fallen electrical wires and to treat damaged powerlines as live. Electrical emergencies can be reported on 13 19 62.



School closures and transport disruption



Wednesday's storms also disrupted education across South East Queensland, with schools in the hardest-hit districts unable to operate normally because of damage and electricity interruptions.



Eleven state schools in the Logan City Council area were reported closed on Thursday morning, including campuses in Marsden, Crestmead, Jimboomba and Yarrabilba. Subsequent reporting placed the number of affected schools in the broader Logan and Jimboomba area at 13.



Within Brisbane, Mansfield State School cancelled a prep orientation session after experiencing telephone and internet disruption.



Parents across Brisbane, Moreton Bay and Redlands can check the Queensland Government's current emergency school closures register for information about affected state, independent and Catholic schools.




QLD SCHOOL CLOSURES








The register should be checked before travelling, as schools may reopen once power, access and safety conditions have been assessed. Families should also consult their school's own communications for local arrangements.



Transport disruption has extended beyond flooded roads. Brisbane Airport experienced delays and cancellations during Wednesday's storms, while local road hazards included fallen branches, damaged traffic infrastructure and standing water.



Drivers can check QLDTraffic or the Transport and Main Roads Road Status Update for restrictions affecting state-controlled roads. Council emergency dashboards provide additional local information.




TMR ROAD STATUS UPDATE








Emergency crews respond to hundreds of calls



The State Emergency Service received more than 320 requests for assistance across South East Queensland after Wednesday's storms.



Logan accounted for the majority of the calls, but emergency crews were also deployed across Brisbane, Redlands and other affected areas.



The requests largely involved fallen trees, damaged roofs, blocked access to properties and other storm-related hazards. Brisbane recorded 41 requests, while Redlands recorded 16.



Emergency workers have been clearing debris, securing damaged structures and helping residents protect properties exposed to further rainfall.



Authorities are also urging residents to avoid floodwater and stay away from fallen electrical infrastructure. Even shallow floodwater can conceal damaged road surfaces, debris and strong currents.



More severe thunderstorms possible



The Bureau of Meteorology has forecast another period of unsettled weather across South East Queensland on Thursday, with severe thunderstorms possible from the Gold Coast through Brisbane and the Sunshine Coast towards Bundaberg.



Forecasters have identified damaging winds, large hail and heavy rainfall leading to flash flooding as the main hazards.



The threat is particularly concerning for communities still dealing with damaged buildings, blocked access and electricity interruptions from Wednesday's storms.



Storm activity may ease in some districts on Friday before increasing again over the weekend as another weather system develops across inland Queensland.



Residents should monitor the Bureau of Meteorology's Queensland warnings and check their local council's emergency information before making travel plans.




BOM QUEENSLAND WARNINGS









  What residents should do
  
    Check weather warnings before travelling
    Avoid flooded roads and never drive through floodwater
    Stay clear of fallen powerlines
    Charge phones and devices while power is available
    Secure loose outdoor items where safe
    Call SES on 132 500 for non-life-threatening storm damage
    Call 000 in a life-threatening emergency
  




Published 12-Nov-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Acacia Ridge Alternative School in Focus as Queensland Enrolments Grow]]></title>
<link>https://sunnybankhillsnews.com.au/acacia-ridge-alternative-school-in-focus-as-queensland-enrolments-grow</link>
<media:content url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/2.png" medium="image"/>
<media:thumbnail url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/2.png"/>
<enclosure url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/2.png" length="1634456" type="image/png"/>
<pubDate>Sun, 15 Nov 2026 18:35:54 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[Acacia Ridge]]></category>
<category><![CDATA[alternative education]]></category>
<category><![CDATA[Brisbane south]]></category>
<category><![CDATA[Queensland education]]></category>
<category><![CDATA[special assistance schools]]></category>
<category><![CDATA[Y Schools Queensland]]></category>
<dc:creator><![CDATA[Sunnybank Hills News]]></dc:creator>
<guid isPermaLink="true">https://sunnybankhillsnews.com.au/?page_id=14804</guid>
<description><![CDATA[
An Acacia Ridge alternative school catering for Years 7 to 9 is part of a Queensland education sector that has grown sevenfold over the past decade, with new research estimating substantial long-term benefits from helping students complete their schooling.



Read: Heavy Rain Floods Brisbane Roads as More Storms Threaten South East Queensland



Y Schools Queensland's Brisbane South Junior Campus provides an alternative to mainstream secondary education for students who are disengaged or at risk of disengaging. The independent special assistance school combines adjusted learning programs with wellbeing support and practical activities.



The statewide growth figures come from a McCrindle study commissioned by Independent Schools Queensland (ISQ), announced on 9 November 2026. According to ISQ, enrolments at independent special assistance schools have increased sevenfold since 2016, with more than 11,000 students attending 31 schools across Queensland. Approximately 2,000 students graduated from the sector in 2025, forming the basis of the research's estimates of long-term social and economic benefits.




  Acacia Ridge School at a Glance

  
    
      Campus
      Y Schools Queensland – Brisbane South Junior
    
    
      Address
      2–10 Mannington Road, Acacia Ridge QLD 4110
    
    
      School type
      Independent special assistance school
    
    
      Year levels
      Years 7–9
    
    
      July 2025 enrolments
      71 students
    
    
      Year 7
      17 students
    
    
      Year 8
      25 students
    
    
      Year 9
      29 students
    
  

  
    Source:
    
      Queensland Department of Education
    .
    Enrolments recorded July 2025.
  



.school-facts {
  box-sizing: border-box;
  max-width: 680px;
  width: 100%;
  margin: 1.5rem auto;
  padding: 1.25rem;
  background: #f7f9fa;
  border: 1px solid #d9e0e5;
  border-radius: 8px;
  color: #23313e;
  font-family: Arial, sans-serif;
  line-height: 1.5;
}

.school-facts h3 {
  margin: 0 0 1rem;
  font-size: 1.2rem;
  line-height: 1.3;
}

.school-facts dl {
  margin: 0;
}

.school-facts dl div {
  display: grid;
  grid-template-columns: minmax(100px, 38%) 1fr;
  gap: 1rem;
  padding: .65rem 0;
  border-bottom: 1px solid #e0e5e9;
}

.school-facts dt {
  font-weight: 700;
}

.school-facts dd {
  margin: 0;
  overflow-wrap: anywhere;
}

.school-facts .source-note {
  margin: 1rem 0 0;
  font-size: .8rem;
  color: #53616c;
}

.school-facts a {
  color: #075a96;
  text-decoration: underline;
}

@media (max-width: 480px) {
  .school-facts {
    padding: 1rem;
  }

  .school-facts dl div {
    grid-template-columns: 1fr;
    gap: .15rem;
  }
}




Learning Programs At Acacia Ridge Alternative School



The Brisbane South Junior Campus offers activities beyond conventional classroom learning, including sport, cultural programs and practical experiences linked to different career interests. According to Y Schools Queensland, students have access to outdoor areas for recreation, alongside activities involving bush tucker cooking, Indigenous art and an Indigenous garden. Cultural programs also celebrate Aboriginal and Torres Strait Islander and Polynesian heritage.



The school describes practical learning linked to landscaping, automotive studies and beauty services. Community partnerships provide opportunities for mentoring and industry-related experiences, although published information does not establish how many students participate in individual programs.



The junior campus is associated with Y Schools Queensland's Brisbane South Senior Campus in Parkinson, which caters for Years 10 to 12. Both campuses serve different stages of secondary education. However, no verified figures establish how many students transfer between them or subsequently graduate from Year 12.



Research Puts Lifetime Benefits at $452 million



The McCrindle research commissioned by ISQ estimates that a student who re-engages with education and completes Year 12 through a special assistance school generates an average lifetime social and economic benefit of $226,100. Applied to the approximately 2,000 students who graduated in 2025, the study projects combined lifetime benefits of about $452 million.



The modelling considers potential longer-term outcomes involving employment, taxation and public expenditure, including welfare, healthcare and incarceration. The $452 million estimate is not money already saved by government. The published findings also do not assign a financial benefit to individual campuses, including Acacia Ridge.



Among surveyed former students, 87 per cent were engaged in employment, further study, volunteering or parenting, while 75 per cent of surveyed parents reported significant improvements in their children's school attendance. The figures represent reported outcomes across the sector rather than independently measured results at the Brisbane South Junior Campus. The full report's survey sample sizes and modelling assumptions have not been independently verified.



Read: Queensland E-Bike Assurance Scheme: What Owners Need to Know



A separate Y Schools Queensland 2025 outcomes report, published on 13 April 2026, recorded stronger academic growth in mathematics than reading across the organisation. Between 78 and 81 per cent of assessed students met expected mathematics growth, compared with 64 to 67 per cent in reading. The organisation identified literacy improvement as a priority, although the published summary did not provide separate academic results for the Acacia Ridge junior campus. The school operator's website states that the junior campus accepts enrolment enquiries throughout the year for students in Years 7 to 9.



Published 11-November-2026




]]></description>
<content:encoded><![CDATA[
An Acacia Ridge alternative school catering for Years 7 to 9 is part of a Queensland education sector that has grown sevenfold over the past decade, with new research estimating substantial long-term benefits from helping students complete their schooling.



Read: Heavy Rain Floods Brisbane Roads as More Storms Threaten South East Queensland



Y Schools Queensland's Brisbane South Junior Campus provides an alternative to mainstream secondary education for students who are disengaged or at risk of disengaging. The independent special assistance school combines adjusted learning programs with wellbeing support and practical activities.



The statewide growth figures come from a McCrindle study commissioned by Independent Schools Queensland (ISQ), announced on 9 November 2026. According to ISQ, enrolments at independent special assistance schools have increased sevenfold since 2016, with more than 11,000 students attending 31 schools across Queensland. Approximately 2,000 students graduated from the sector in 2025, forming the basis of the research's estimates of long-term social and economic benefits.




  Acacia Ridge School at a Glance

  
    
      Campus
      Y Schools Queensland – Brisbane South Junior
    
    
      Address
      2–10 Mannington Road, Acacia Ridge QLD 4110
    
    
      School type
      Independent special assistance school
    
    
      Year levels
      Years 7–9
    
    
      July 2025 enrolments
      71 students
    
    
      Year 7
      17 students
    
    
      Year 8
      25 students
    
    
      Year 9
      29 students
    
  

  
    Source:
    
      Queensland Department of Education
    .
    Enrolments recorded July 2025.
  



.school-facts {
  box-sizing: border-box;
  max-width: 680px;
  width: 100%;
  margin: 1.5rem auto;
  padding: 1.25rem;
  background: #f7f9fa;
  border: 1px solid #d9e0e5;
  border-radius: 8px;
  color: #23313e;
  font-family: Arial, sans-serif;
  line-height: 1.5;
}

.school-facts h3 {
  margin: 0 0 1rem;
  font-size: 1.2rem;
  line-height: 1.3;
}

.school-facts dl {
  margin: 0;
}

.school-facts dl div {
  display: grid;
  grid-template-columns: minmax(100px, 38%) 1fr;
  gap: 1rem;
  padding: .65rem 0;
  border-bottom: 1px solid #e0e5e9;
}

.school-facts dt {
  font-weight: 700;
}

.school-facts dd {
  margin: 0;
  overflow-wrap: anywhere;
}

.school-facts .source-note {
  margin: 1rem 0 0;
  font-size: .8rem;
  color: #53616c;
}

.school-facts a {
  color: #075a96;
  text-decoration: underline;
}

@media (max-width: 480px) {
  .school-facts {
    padding: 1rem;
  }

  .school-facts dl div {
    grid-template-columns: 1fr;
    gap: .15rem;
  }
}




Learning Programs At Acacia Ridge Alternative School



The Brisbane South Junior Campus offers activities beyond conventional classroom learning, including sport, cultural programs and practical experiences linked to different career interests. According to Y Schools Queensland, students have access to outdoor areas for recreation, alongside activities involving bush tucker cooking, Indigenous art and an Indigenous garden. Cultural programs also celebrate Aboriginal and Torres Strait Islander and Polynesian heritage.



The school describes practical learning linked to landscaping, automotive studies and beauty services. Community partnerships provide opportunities for mentoring and industry-related experiences, although published information does not establish how many students participate in individual programs.



The junior campus is associated with Y Schools Queensland's Brisbane South Senior Campus in Parkinson, which caters for Years 10 to 12. Both campuses serve different stages of secondary education. However, no verified figures establish how many students transfer between them or subsequently graduate from Year 12.



Research Puts Lifetime Benefits at $452 million



The McCrindle research commissioned by ISQ estimates that a student who re-engages with education and completes Year 12 through a special assistance school generates an average lifetime social and economic benefit of $226,100. Applied to the approximately 2,000 students who graduated in 2025, the study projects combined lifetime benefits of about $452 million.



The modelling considers potential longer-term outcomes involving employment, taxation and public expenditure, including welfare, healthcare and incarceration. The $452 million estimate is not money already saved by government. The published findings also do not assign a financial benefit to individual campuses, including Acacia Ridge.



Among surveyed former students, 87 per cent were engaged in employment, further study, volunteering or parenting, while 75 per cent of surveyed parents reported significant improvements in their children's school attendance. The figures represent reported outcomes across the sector rather than independently measured results at the Brisbane South Junior Campus. The full report's survey sample sizes and modelling assumptions have not been independently verified.



Read: Queensland E-Bike Assurance Scheme: What Owners Need to Know



A separate Y Schools Queensland 2025 outcomes report, published on 13 April 2026, recorded stronger academic growth in mathematics than reading across the organisation. Between 78 and 81 per cent of assessed students met expected mathematics growth, compared with 64 to 67 per cent in reading. The organisation identified literacy improvement as a priority, although the published summary did not provide separate academic results for the Acacia Ridge junior campus. The school operator's website states that the junior campus accepts enrolment enquiries throughout the year for students in Years 7 to 9.



Published 11-November-2026




]]></content:encoded>
</item><item>
<title><![CDATA[Queensland E-Bike Assurance Scheme: What Owners Need to Know]]></title>
<link>https://sunnybankhillsnews.com.au/queensland-e-bike-assurance-scheme-inspection-centres-2026/queensland-e-bike-assurance-scheme-inspection-centres-2026</link>
<media:content url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes.png" medium="image"/>
<media:thumbnail url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes.png"/>
<enclosure url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes.png" length="1452970" type="image/png"/>
<pubDate>Wed, 11 Nov 2026 03:16:31 +0000</pubDate>
<dc:creator><![CDATA[Sunnybank Hills News]]></dc:creator>
<guid isPermaLink="true">https://sunnybankhillsnews.com.au/queensland-e-bike-assurance-scheme-inspection-centres-2026/</guid>
<description><![CDATA[


Queensland e-bike owners facing new compliance requirements have only nine authorised inspection centres available statewide, with no locations currently listed in several major regional cities.



The Electrically Power-Assisted Cycle (EPAC) Assurance Scheme commenced on 2 November 2026, allowing owners of eligible older e-bikes to have their devices inspected and approved for continued legal use. However, the initial network consists entirely of Trek bicycle stores, most of them concentrated in south-east Queensland.



The state's official directory of authorised verifiers lists three centres in Brisbane, two on the Gold Coast, and one each in Ipswich, Moreton Bay, the Sunshine Coast and Rockhampton. There are no authorised locations currently listed in Townsville, Cairns, Toowoomba or Mackay.



Owners requiring verification must book an appointment and bring their e-bike to an approved retailer. The Department of Transport and Main Roads advises that appointments may take a couple of weeks, depending on individual store capacity.



The department expects additional retailers to join the program over the coming months. Alternative arrangements are also being developed for rural and remote residents without reasonable access to a verifier, with further details expected in early 2027.



Which e-bikes need inspection?



The scheme primarily covers eligible e-bikes manufactured before 1 July 2026 that do not meet the European EN 15194 standard or lack the required compliance label.



To qualify, these older bicycles must have pedals as their primary source of power, a maximum continuous rated motor output of 250 watts, and motor assistance that stops at 25 km/h. Where throttle control is fitted, throttle-only assistance must be limited to 6 km/h to help riders start moving.



Devices must also satisfy other technical and safety requirements before an authorised retailer can approve them. E-bikes that already meet EN 15194 and display the required compliance label do not need another inspection.



For eligible older bicycles, the initial pre-screening is free. A formal assessment may cost up to $50, with a further $20 permitted for issuing a permanent compliance label and recording the verification.



Owners covered by the transition arrangements have until 28 February 2027 to obtain the required label. From 1 March 2027, e-bikes that need verification must display the appropriate compliance label to continue being ridden legally in public.



The scheme cannot be used to legalise high-powered, high-speed or illegally modified devices. It also provides a separate pathway for certain e-bikes and e-trikes designed or adapted for people with disabilities or medical conditions.



A label issued through the scheme confirms that an eligible device has met Queensland's verification requirements. It does not certify full compliance with the European EN 15194 standard.






  
    Queensland E-Bike Inspections: What Owners Need to Know
  

  
    Queensland's new EPAC Assurance Scheme allows eligible older e-bikes to be inspected and approved for continued legal use.
  

  
    Scheme commenced: 2 November 2026
    Compliance deadline: 28 February 2027
    Initial screening: Free
    Formal inspection: Up to $50
    Compliance label: Up to $20
    Total possible cost: $70
    Authorised locations: Nine across Queensland at launch
    Already compliant? E-bikes meeting EN 15194 and displaying the required label do not need another inspection.
    Bookings: Appointments must be arranged with an authorised retailer.
  

  
    Important: The scheme does not legalise high-powered, high-speed or illegally modified devices.
  

  
    Source:
    
      Queensland Department of Transport and Main Roads – EPAC Assurance Scheme
    
  






Cycling advocates highlight the cost of compliance



Bicycle Queensland has supported clearer rules distinguishing lawful pedal-assisted bicycles from illegal high-powered devices, while the cost and accessibility of verification remain concerns for cycling advocates.



In its published explanation of the new laws, the organisation outlines the inspection process and the potential $70 charge facing owners whose existing bicycles require verification.



The fee applies to the formal assessment and labelling process rather than every e-bike owner. Riders whose bicycles already carry the correct EN 15194 label are not required to pay for another inspection.



The limited number of participating retailers also presents a practical question for people living far from an inspection centre, particularly those who rely on their e-bikes for everyday transport.



Bicycle Industries Australia has welcomed the scheme. Its general manager, Peter Bourke, has supported measures that help riders access safe, legal products and said the program would allow bicycle businesses to assist owners in establishing whether their devices meet Queensland's requirements.



The Department of Transport and Main Roads has described the scheme as a practical way for owners of legitimate existing e-bikes to continue riding, while keeping dangerous high-powered and high-speed devices off public roads and paths.



Research shows e-bikes are used across Queensland



The availability of inspection centres takes on wider significance when considered alongside new research into the growing number of Queenslanders using electric bicycles and other e-mobility devices.



A University of Queensland study, released on 21 October 2026, estimated that Queenslanders owned approximately 587,000 e-bikes, accounting for 61 per cent of privately owned e-mobility devices. The study also estimated 352,100 e-scooters and 30,400 other devices.



Researchers found that one in three Queensland households owned an e-mobility device, with total household spending on the devices estimated at $2.2 billion. Ownership was not confined to metropolitan areas. The study found that 28 per cent of households in remote Queensland reported owning an e-mobility device, reinforcing the importance of access to transport options outside major cities.



For one in four e-mobility users surveyed, a private car was their only alternative means of transport. More than half of the primary users of privately owned devices were aged 50 or older. The findings point to the role electric transport now plays in everyday travel, from commuting and shopping to recreation and maintaining independence.



However, the estimated 587,000 e-bikes do not represent the number requiring inspection under the new scheme. Many already meet the relevant standards, while others may be ineligible for verification.



The research also identified safety concerns. About half of privately owned e-mobility devices were classified as non-compliant based on owners' self-reported speed, motor power and throttle characteristics.



Researchers cautioned that the findings covered different types of e-mobility devices and did not establish how many existing e-bikes would require inspection or replacement compliance labels.



Safety reforms target illegal high-powered devices



The assurance scheme forms part of Queensland's broader e-mobility reforms, introduced amid concerns about serious injuries, unsafe riding and devices capable of travelling well beyond the permitted limits.



New rules introduced during 2026 include restrictions on motor power and speed, tighter age and licensing requirements, and expanded police enforcement powers.



Under the state's current e-bike rules, bicycles powered by motors exceeding 250 watts of maximum continuous rated output cannot legally be ridden on public roads or paths as ordinary e-bikes. Devices that depend entirely on throttle power, rather than pedalling, are also prohibited, apart from the limited starting assistance permitted under the rules. Police can issue significant fines and seize illegal devices.



Transport authorities say the verification process is intended to distinguish suitable older bicycles from machines that fail the state's safety requirements. The scheme gives owners of qualifying existing e-bikes a means of keeping their bicycles on the road without requiring them to meet every provision of the European standard introduced for newer devices.



Where owners can get their e-bikes checked



As of 11 November 2026, the Queensland Government lists nine authorised inspection centres, all operated by Trek Bicycle.



RegionAuthorised inspection centreBrisbaneTrek CarindaleBrisbaneTrek WindsorBrisbaneTrek WoolloongabbaIpswichTrek Ipswich, East IpswichMoreton BayTrek North LakesGold CoastTrek Ashmore, MolendinarGold CoastTrek Burleigh HeadsSunshine CoastTrek Sunshine Coast, MinyamaCentral QueenslandTrek Rockhampton, Norman Gardens



Source: Queensland Department of Transport and Main Roads, EPAC Assurance Scheme authorised verifier directory. The government has advised owners to check the directory regularly as more retailers join the scheme.



Owners must contact an authorised retailer to arrange an inspection before visiting. The department recommends bringing any available information about the bicycle's make, model, purchase date and technical specifications.



For eligible riders whose bicycles still need verification, the transition period provides an opportunity to arrange an inspection before the February deadline. Whether the expanding network reaches more regional communities before then remains an important question as the scheme progresses.



Published 10-Nov-2026Featured Image Credit: Brisbane City Council




]]></description>
<content:encoded><![CDATA[


Queensland e-bike owners facing new compliance requirements have only nine authorised inspection centres available statewide, with no locations currently listed in several major regional cities.



The Electrically Power-Assisted Cycle (EPAC) Assurance Scheme commenced on 2 November 2026, allowing owners of eligible older e-bikes to have their devices inspected and approved for continued legal use. However, the initial network consists entirely of Trek bicycle stores, most of them concentrated in south-east Queensland.



The state's official directory of authorised verifiers lists three centres in Brisbane, two on the Gold Coast, and one each in Ipswich, Moreton Bay, the Sunshine Coast and Rockhampton. There are no authorised locations currently listed in Townsville, Cairns, Toowoomba or Mackay.



Owners requiring verification must book an appointment and bring their e-bike to an approved retailer. The Department of Transport and Main Roads advises that appointments may take a couple of weeks, depending on individual store capacity.



The department expects additional retailers to join the program over the coming months. Alternative arrangements are also being developed for rural and remote residents without reasonable access to a verifier, with further details expected in early 2027.



Which e-bikes need inspection?



The scheme primarily covers eligible e-bikes manufactured before 1 July 2026 that do not meet the European EN 15194 standard or lack the required compliance label.



To qualify, these older bicycles must have pedals as their primary source of power, a maximum continuous rated motor output of 250 watts, and motor assistance that stops at 25 km/h. Where throttle control is fitted, throttle-only assistance must be limited to 6 km/h to help riders start moving.



Devices must also satisfy other technical and safety requirements before an authorised retailer can approve them. E-bikes that already meet EN 15194 and display the required compliance label do not need another inspection.



For eligible older bicycles, the initial pre-screening is free. A formal assessment may cost up to $50, with a further $20 permitted for issuing a permanent compliance label and recording the verification.



Owners covered by the transition arrangements have until 28 February 2027 to obtain the required label. From 1 March 2027, e-bikes that need verification must display the appropriate compliance label to continue being ridden legally in public.



The scheme cannot be used to legalise high-powered, high-speed or illegally modified devices. It also provides a separate pathway for certain e-bikes and e-trikes designed or adapted for people with disabilities or medical conditions.



A label issued through the scheme confirms that an eligible device has met Queensland's verification requirements. It does not certify full compliance with the European EN 15194 standard.






  
    Queensland E-Bike Inspections: What Owners Need to Know
  

  
    Queensland's new EPAC Assurance Scheme allows eligible older e-bikes to be inspected and approved for continued legal use.
  

  
    Scheme commenced: 2 November 2026
    Compliance deadline: 28 February 2027
    Initial screening: Free
    Formal inspection: Up to $50
    Compliance label: Up to $20
    Total possible cost: $70
    Authorised locations: Nine across Queensland at launch
    Already compliant? E-bikes meeting EN 15194 and displaying the required label do not need another inspection.
    Bookings: Appointments must be arranged with an authorised retailer.
  

  
    Important: The scheme does not legalise high-powered, high-speed or illegally modified devices.
  

  
    Source:
    
      Queensland Department of Transport and Main Roads – EPAC Assurance Scheme
    
  






Cycling advocates highlight the cost of compliance



Bicycle Queensland has supported clearer rules distinguishing lawful pedal-assisted bicycles from illegal high-powered devices, while the cost and accessibility of verification remain concerns for cycling advocates.



In its published explanation of the new laws, the organisation outlines the inspection process and the potential $70 charge facing owners whose existing bicycles require verification.



The fee applies to the formal assessment and labelling process rather than every e-bike owner. Riders whose bicycles already carry the correct EN 15194 label are not required to pay for another inspection.



The limited number of participating retailers also presents a practical question for people living far from an inspection centre, particularly those who rely on their e-bikes for everyday transport.



Bicycle Industries Australia has welcomed the scheme. Its general manager, Peter Bourke, has supported measures that help riders access safe, legal products and said the program would allow bicycle businesses to assist owners in establishing whether their devices meet Queensland's requirements.



The Department of Transport and Main Roads has described the scheme as a practical way for owners of legitimate existing e-bikes to continue riding, while keeping dangerous high-powered and high-speed devices off public roads and paths.



Research shows e-bikes are used across Queensland



The availability of inspection centres takes on wider significance when considered alongside new research into the growing number of Queenslanders using electric bicycles and other e-mobility devices.



A University of Queensland study, released on 21 October 2026, estimated that Queenslanders owned approximately 587,000 e-bikes, accounting for 61 per cent of privately owned e-mobility devices. The study also estimated 352,100 e-scooters and 30,400 other devices.



Researchers found that one in three Queensland households owned an e-mobility device, with total household spending on the devices estimated at $2.2 billion. Ownership was not confined to metropolitan areas. The study found that 28 per cent of households in remote Queensland reported owning an e-mobility device, reinforcing the importance of access to transport options outside major cities.



For one in four e-mobility users surveyed, a private car was their only alternative means of transport. More than half of the primary users of privately owned devices were aged 50 or older. The findings point to the role electric transport now plays in everyday travel, from commuting and shopping to recreation and maintaining independence.



However, the estimated 587,000 e-bikes do not represent the number requiring inspection under the new scheme. Many already meet the relevant standards, while others may be ineligible for verification.



The research also identified safety concerns. About half of privately owned e-mobility devices were classified as non-compliant based on owners' self-reported speed, motor power and throttle characteristics.



Researchers cautioned that the findings covered different types of e-mobility devices and did not establish how many existing e-bikes would require inspection or replacement compliance labels.



Safety reforms target illegal high-powered devices



The assurance scheme forms part of Queensland's broader e-mobility reforms, introduced amid concerns about serious injuries, unsafe riding and devices capable of travelling well beyond the permitted limits.



New rules introduced during 2026 include restrictions on motor power and speed, tighter age and licensing requirements, and expanded police enforcement powers.



Under the state's current e-bike rules, bicycles powered by motors exceeding 250 watts of maximum continuous rated output cannot legally be ridden on public roads or paths as ordinary e-bikes. Devices that depend entirely on throttle power, rather than pedalling, are also prohibited, apart from the limited starting assistance permitted under the rules. Police can issue significant fines and seize illegal devices.



Transport authorities say the verification process is intended to distinguish suitable older bicycles from machines that fail the state's safety requirements. The scheme gives owners of qualifying existing e-bikes a means of keeping their bicycles on the road without requiring them to meet every provision of the European standard introduced for newer devices.



Where owners can get their e-bikes checked



As of 11 November 2026, the Queensland Government lists nine authorised inspection centres, all operated by Trek Bicycle.



RegionAuthorised inspection centreBrisbaneTrek CarindaleBrisbaneTrek WindsorBrisbaneTrek WoolloongabbaIpswichTrek Ipswich, East IpswichMoreton BayTrek North LakesGold CoastTrek Ashmore, MolendinarGold CoastTrek Burleigh HeadsSunshine CoastTrek Sunshine Coast, MinyamaCentral QueenslandTrek Rockhampton, Norman Gardens



Source: Queensland Department of Transport and Main Roads, EPAC Assurance Scheme authorised verifier directory. The government has advised owners to check the directory regularly as more retailers join the scheme.



Owners must contact an authorised retailer to arrange an inspection before visiting. The department recommends bringing any available information about the bicycle's make, model, purchase date and technical specifications.



For eligible riders whose bicycles still need verification, the transition period provides an opportunity to arrange an inspection before the February deadline. Whether the expanding network reaches more regional communities before then remains an important question as the scheme progresses.



Published 10-Nov-2026Featured Image Credit: Brisbane City Council




]]></content:encoded>
</item><item>
<title><![CDATA[49-Year Sunnybank Family Home Draws Strong Interest at $1.6-M Auction]]></title>
<link>https://sunnybankhillsnews.com.au/sunnybank-family-home-16-million-auction-dema-street</link>
<media:content url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/FI-for-OMC-99.webp" medium="image"/>
<media:thumbnail url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/FI-for-OMC-99.webp"/>
<enclosure url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/FI-for-OMC-99.webp" length="219538" type="image/webp"/>
<pubDate>Mon, 09 Nov 2026 05:03:38 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[17 Dema Street Sunnybank]]></category>
<category><![CDATA[Dema St]]></category>
<category><![CDATA[Sunnybank property auction]]></category>
<dc:creator><![CDATA[Sunnybank Hills News]]></dc:creator>
<guid isPermaLink="true">https://sunnybankhillsnews.com.au/?page_id=14786</guid>
<description><![CDATA[
A Sunnybank family home held by the same owners for 49 years has achieved $1.6 million at auction, attracting seven active bidders and bringing a long chapter of family ownership to a close.







Read: Packed Auction Sees 38-Year Family Home Smash Sunnybank Hills Property Records







The four-bedroom property at 17 Dema Street was offered to the market for the first time since its original purchase in 1977. Its auction on 7 November attracted a crowd of about 60 people watching as competition developed for the two-storey residence.



According to Ray White, the auction attracted seven active bidders, with 12 registered participants competing for the property. The $1.6 million result also set a new street record, marking a standout outcome for the Dema Street home after 49 years under the same family ownership.



Photo credit: Ray White Rochedale



The successful buyer was an investor who, according to Ray White, intends to renovate the property and lease it out. The original owner's daughter attended the auction, representing a family that had occupied the home for nearly five decades.



The property's size and layout distinguish it from a conventional four-bedroom suburban house. Sitting on an 859sqm allotment with a 21.5m frontage, the residence has separate living and entertaining areas spread across two levels.



Photo credit: Ray White Rochedale



All four bedrooms are upstairs, alongside the main family bathroom, kitchen, dining area and principal living room. The living space opens onto a balcony, while the downstairs level offers a second large family room with a corner bar.



The lower floor also includes another bathroom, an internal laundry, a double garage, additional parking for two vehicles and a dedicated workshop. Extensive storage adds to the home's practical features, particularly for households requiring room for vehicles, equipment or hobbies.



Photo credit: Ray White Rochedale



An existing swimming pool occupies the rear of the property, although it is not ready for immediate use. The listing states that it has been cleaned but still requires restoration and filling before a new owner can enjoy it.



The landholding also presents another consideration for its next owner. The property's marketing material identifies possible subdivision or redevelopment as options worth exploring, but any proposal would require Brisbane City approval and compliance with relevant planning requirements. No subdivision or redevelopment approval has been established in the material reviewed.



Property records show the house last changed hands in January 1977 for $51,500. Its latest $1.6 million result represents a substantial difference from that earlier transaction, although the two prices come from very different property markets and periods.



Photo credit: Ray White Rochedale



The auction also marks a change in the property's role after decades as a family residence. Its next chapter is expected to involve renovation and rental use, according to the selling agency, while the house's existing layout and sizeable block leave room for further decisions by its new owner.







Read: Street Spotlight: Boorman Street, Sunnybank







After 49 years under one ownership, 17 Dema Street has now become part of Sunnybank's latest property transactions, with its auction attracting a sizeable field of interested buyers.



Published 9-November-2026
]]></description>
<content:encoded><![CDATA[
A Sunnybank family home held by the same owners for 49 years has achieved $1.6 million at auction, attracting seven active bidders and bringing a long chapter of family ownership to a close.







Read: Packed Auction Sees 38-Year Family Home Smash Sunnybank Hills Property Records







The four-bedroom property at 17 Dema Street was offered to the market for the first time since its original purchase in 1977. Its auction on 7 November attracted a crowd of about 60 people watching as competition developed for the two-storey residence.



According to Ray White, the auction attracted seven active bidders, with 12 registered participants competing for the property. The $1.6 million result also set a new street record, marking a standout outcome for the Dema Street home after 49 years under the same family ownership.



Photo credit: Ray White Rochedale



The successful buyer was an investor who, according to Ray White, intends to renovate the property and lease it out. The original owner's daughter attended the auction, representing a family that had occupied the home for nearly five decades.



The property's size and layout distinguish it from a conventional four-bedroom suburban house. Sitting on an 859sqm allotment with a 21.5m frontage, the residence has separate living and entertaining areas spread across two levels.



Photo credit: Ray White Rochedale



All four bedrooms are upstairs, alongside the main family bathroom, kitchen, dining area and principal living room. The living space opens onto a balcony, while the downstairs level offers a second large family room with a corner bar.



The lower floor also includes another bathroom, an internal laundry, a double garage, additional parking for two vehicles and a dedicated workshop. Extensive storage adds to the home's practical features, particularly for households requiring room for vehicles, equipment or hobbies.



Photo credit: Ray White Rochedale



An existing swimming pool occupies the rear of the property, although it is not ready for immediate use. The listing states that it has been cleaned but still requires restoration and filling before a new owner can enjoy it.



The landholding also presents another consideration for its next owner. The property's marketing material identifies possible subdivision or redevelopment as options worth exploring, but any proposal would require Brisbane City approval and compliance with relevant planning requirements. No subdivision or redevelopment approval has been established in the material reviewed.



Property records show the house last changed hands in January 1977 for $51,500. Its latest $1.6 million result represents a substantial difference from that earlier transaction, although the two prices come from very different property markets and periods.



Photo credit: Ray White Rochedale



The auction also marks a change in the property's role after decades as a family residence. Its next chapter is expected to involve renovation and rental use, according to the selling agency, while the house's existing layout and sizeable block leave room for further decisions by its new owner.







Read: Street Spotlight: Boorman Street, Sunnybank







After 49 years under one ownership, 17 Dema Street has now become part of Sunnybank's latest property transactions, with its auction attracting a sizeable field of interested buyers.



Published 9-November-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Archerfield Wetlands Earns National Recognition for Public Design]]></title>
<link>https://sunnybankhillsnews.com.au/archerfield-wetlands-parkland-landscape-australia-award-2026</link>
<media:content url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/FI-for-OMC-80.webp" medium="image"/>
<media:thumbnail url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/FI-for-OMC-80.webp"/>
<enclosure url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/11/FI-for-OMC-80.webp" length="218710" type="image/webp"/>
<pubDate>Thu, 05 Nov 2026 04:00:30 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[Archerfield]]></category>
<category><![CDATA[Archerfield Wetlands]]></category>
<category><![CDATA[Brisbane parks]]></category>
<category><![CDATA[durack]]></category>
<category><![CDATA[Environment]]></category>
<category><![CDATA[Landscape Australia Awards]]></category>
<category><![CDATA[Oxley Creek]]></category>
<dc:creator><![CDATA[Sunnybank Hills News]]></dc:creator>
<guid isPermaLink="true">https://sunnybankhillsnews.com.au/?page_id=14768</guid>
<description><![CDATA[
Archerfield Wetlands Parkland has won the 2026 Landscape Australia Award for Public Design, recognising the transformation of a former wastewater treatment site in Brisbane's south-west into a 150-hectare wetland precinct featuring restored habitats, walking trails, and community recreation facilities.







Read: Archerfield Wetlands District Park Named Queensland's Park of the Year







The project, delivered by Brisbane Sustainability Agency, received the award in the inaugural Landscape Australia Awards, with the winning projects announced on October 21.



Photo credit: Facebook/Brisbane Sustainability Agency



The recognition comes after years of planning and rehabilitation at a site shaped by industrial activity, land clearing, and other uses that affected its natural environment. Today, the precinct brings together wetland restoration and public access, with a four-hectare district park forming one of its main community facilities.



Photo credit: Facebook/Brisbane Sustainability Agency



Located on Bowhill Road in Durack, the district park opened in September 2024. It sits within the wider Archerfield Wetlands Parkland, which covers approximately 150 hectares and includes eucalypt forest, grassland, freshwater wetlands, and creeks. The broader wetlands support more than 170 identified bird species, according to Brisbane Sustainability Agency.



Reworking a Former Industrial Landscape



Photo credit: Facebook/Brisbane Sustainability Agency



The site's previous uses included a wastewater treatment plant, waste disposal, industrial meat processing, landfilling and grazing. These activities contributed to contamination, vegetation loss and changes to the area's landforms and waterways.



Rehabilitation has involved restoring woodlands and grasslands, establishing native vegetation and improving habitat connections. Brisbane Sustainability Agency reported in its October award announcement that more than 150,000 native plants had been established across the site.



The agency's project information separately records 67,000 trees, shrubs, grasses and ground covers planted within the four-hectare district park. These plantings help provide wildlife habitat, shade and improved stormwater management.



The park also retains physical reminders of its industrial past. Concrete tanks and other infrastructure from the former treatment plant have been adapted for use as play features, gardens, seating and public amenities.



Photo credit: Brisbane Sustainability Agency



This approach was among the aspects recognised by the awards jury, which noted how the design incorporated existing structures rather than relying entirely on demolition and new construction.



Visitors can explore the wetlands through the Archerfield Wetlands Discovery Trail, a shared walking and cycling route extending more than three kilometres through the precinct. The trail opened in July 2022, more than two years before the district park was completed.



The district park itself includes an adventure playground with water-play features, a youth hub with a basketball court, picnic facilities, an event lawn and a bush resources garden. The Oxley Creek Catchment Association also operates from the Wetlands Community Hub, which includes a native plant nursery supporting environmental rehabilitation work across the catchment.



Community consultation helped shape the broader precinct plan, which was released in 2019. Brisbane Sustainability Agency also worked with the Yuggera Ugarapul People during the parkland's development.



Landscape Australia Awards Recognise Public Design



Photo credit: Brisbane Sustainability Agency



Archerfield Wetlands Parkland took out the Public Design category at the inaugural 2026 Landscape Australia Awards, which recognise projects and achievements in landscape architecture and design.



The official jury assessment highlighted the project's approach to managing a degraded floodplain through landscape rehabilitation. Restored vegetation was recognised for its role in managing runoff, accommodating flooding and reconnecting fragmented habitats.



The judges also considered the relationship between the park's public facilities and the site's industrial history, as well as the project's ongoing ecological monitoring, volunteer activities and further restoration work.







Read: Archerfield Wetlands Emerges as Brisbane's New Parkland Paradise







The award adds to the parkland's previous recognition at the 2026 Planning Institute of Australia's National Awards for Planning Excellence, where it received the Great Place award in May.



The latest accolade places Archerfield Wetlands Parkland among the recognised public landscape projects in the inaugural national awards program.





  Archerfield Wetlands Parkland at a Glance
  
    Location: Bowhill Road, Durack
    Overall precinct: 150 hectares
    District park: Four hectares
    Birdlife: More than 170 identified species
    Native plants: More than 150,000 established across the site
    Discovery Trail: More than 3 kilometres
    District park opening: September 2024
    Latest recognition: 2026 Landscape Australia Award for Public Design
  



.wetlands-facts {
  padding: 16px;
  margin: 20px 0;
  border: 1px solid #d6ded5;
  border-radius: 8px;
  background: #f7faf6;
  color: #26352a;
  font-size: 15px;
  line-height: 1.6;
}
.wetlands-facts h3 {
  margin: 0 0 12px;
  font-size: 19px;
}
.wetlands-facts ul {
  padding-left: 20px;
  margin: 0;
}
.wetlands-facts li {
  margin-bottom: 6px;
}
@media (max-width: 600px) {
  .wetlands-facts {
    padding: 12px;
    font-size: 14px;
  }
  .wetlands-facts h3 {
    font-size: 17px;
  }
}





Published 5-November-2026




]]></description>
<content:encoded><![CDATA[
Archerfield Wetlands Parkland has won the 2026 Landscape Australia Award for Public Design, recognising the transformation of a former wastewater treatment site in Brisbane's south-west into a 150-hectare wetland precinct featuring restored habitats, walking trails, and community recreation facilities.







Read: Archerfield Wetlands District Park Named Queensland's Park of the Year







The project, delivered by Brisbane Sustainability Agency, received the award in the inaugural Landscape Australia Awards, with the winning projects announced on October 21.



Photo credit: Facebook/Brisbane Sustainability Agency



The recognition comes after years of planning and rehabilitation at a site shaped by industrial activity, land clearing, and other uses that affected its natural environment. Today, the precinct brings together wetland restoration and public access, with a four-hectare district park forming one of its main community facilities.



Photo credit: Facebook/Brisbane Sustainability Agency



Located on Bowhill Road in Durack, the district park opened in September 2024. It sits within the wider Archerfield Wetlands Parkland, which covers approximately 150 hectares and includes eucalypt forest, grassland, freshwater wetlands, and creeks. The broader wetlands support more than 170 identified bird species, according to Brisbane Sustainability Agency.



Reworking a Former Industrial Landscape



Photo credit: Facebook/Brisbane Sustainability Agency



The site's previous uses included a wastewater treatment plant, waste disposal, industrial meat processing, landfilling and grazing. These activities contributed to contamination, vegetation loss and changes to the area's landforms and waterways.



Rehabilitation has involved restoring woodlands and grasslands, establishing native vegetation and improving habitat connections. Brisbane Sustainability Agency reported in its October award announcement that more than 150,000 native plants had been established across the site.



The agency's project information separately records 67,000 trees, shrubs, grasses and ground covers planted within the four-hectare district park. These plantings help provide wildlife habitat, shade and improved stormwater management.



The park also retains physical reminders of its industrial past. Concrete tanks and other infrastructure from the former treatment plant have been adapted for use as play features, gardens, seating and public amenities.



Photo credit: Brisbane Sustainability Agency



This approach was among the aspects recognised by the awards jury, which noted how the design incorporated existing structures rather than relying entirely on demolition and new construction.



Visitors can explore the wetlands through the Archerfield Wetlands Discovery Trail, a shared walking and cycling route extending more than three kilometres through the precinct. The trail opened in July 2022, more than two years before the district park was completed.



The district park itself includes an adventure playground with water-play features, a youth hub with a basketball court, picnic facilities, an event lawn and a bush resources garden. The Oxley Creek Catchment Association also operates from the Wetlands Community Hub, which includes a native plant nursery supporting environmental rehabilitation work across the catchment.



Community consultation helped shape the broader precinct plan, which was released in 2019. Brisbane Sustainability Agency also worked with the Yuggera Ugarapul People during the parkland's development.



Landscape Australia Awards Recognise Public Design



Photo credit: Brisbane Sustainability Agency



Archerfield Wetlands Parkland took out the Public Design category at the inaugural 2026 Landscape Australia Awards, which recognise projects and achievements in landscape architecture and design.



The official jury assessment highlighted the project's approach to managing a degraded floodplain through landscape rehabilitation. Restored vegetation was recognised for its role in managing runoff, accommodating flooding and reconnecting fragmented habitats.



The judges also considered the relationship between the park's public facilities and the site's industrial history, as well as the project's ongoing ecological monitoring, volunteer activities and further restoration work.







Read: Archerfield Wetlands Emerges as Brisbane's New Parkland Paradise







The award adds to the parkland's previous recognition at the 2026 Planning Institute of Australia's National Awards for Planning Excellence, where it received the Great Place award in May.



The latest accolade places Archerfield Wetlands Parkland among the recognised public landscape projects in the inaugural national awards program.





  Archerfield Wetlands Parkland at a Glance
  
    Location: Bowhill Road, Durack
    Overall precinct: 150 hectares
    District park: Four hectares
    Birdlife: More than 170 identified species
    Native plants: More than 150,000 established across the site
    Discovery Trail: More than 3 kilometres
    District park opening: September 2024
    Latest recognition: 2026 Landscape Australia Award for Public Design
  



.wetlands-facts {
  padding: 16px;
  margin: 20px 0;
  border: 1px solid #d6ded5;
  border-radius: 8px;
  background: #f7faf6;
  color: #26352a;
  font-size: 15px;
  line-height: 1.6;
}
.wetlands-facts h3 {
  margin: 0 0 12px;
  font-size: 19px;
}
.wetlands-facts ul {
  padding-left: 20px;
  margin: 0;
}
.wetlands-facts li {
  margin-bottom: 6px;
}
@media (max-width: 600px) {
  .wetlands-facts {
    padding: 12px;
    font-size: 14px;
  }
  .wetlands-facts h3 {
    font-size: 17px;
  }
}





Published 5-November-2026




]]></content:encoded>
</item><item>
<title><![CDATA[Acacia Junction Warehouses Go on Sale in Acacia Ridge]]></title>
<link>https://sunnybankhillsnews.com.au/acacia-junction-warehouses-go-on-sale-in-acacia-ridge</link>
<media:content url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/10/1-2.png" medium="image"/>
<media:thumbnail url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/10/1-2.png"/>
<enclosure url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/10/1-2.png" length="1090290" type="image/png"/>
<pubDate>Sat, 31 Oct 2026 08:13:24 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[Acacia Junction]]></category>
<category><![CDATA[Acacia Ridge]]></category>
<category><![CDATA[Brisbane industrial property]]></category>
<category><![CDATA[commercial property sales]]></category>
<category><![CDATA[Inca Property Group]]></category>
<category><![CDATA[industrial development]]></category>
<category><![CDATA[warehouse units]]></category>
<dc:creator><![CDATA[Sunnybank Hills News]]></dc:creator>
<guid isPermaLink="true">https://sunnybankhillsnews.com.au/?page_id=14751</guid>
<description><![CDATA[
Sales have opened for 59 proposed warehouse units at Acacia Junction, an industrial precinct planned for 170 Postle Street in Acacia Ridge.



Read: Baby Rhyme Time Brings a Little Rhythm to Brisbane’s Libraries



Inca Property Group is behind the multi-stage project, which its representatives value at $100 million. The first release includes units measuring approximately 49 to 424 square metres, from compact storage spaces and streetfront showrooms to larger industrial premises. RWC Collective and Knight Frank are marketing the units, with advertised prices starting at $450,000.



Project representatives have reported $15 million in pre-launch sales. Inca managing director Josh Thompson has linked the reported result to buyer demand, while RWC Collective partner Neal Orpin has described a shortage of smaller industrial premises in the area.



Photo Credit: Inca Property Group/Facebook



Warehouse Layouts And Shared Facilities



Architectural firm CELLA designed the proposed estate, including spaces with adaptable mezzanine configurations. The project brochure specifies concrete tilt-panel construction, approximately 7.5 metres of warehouse clearance and about 3.5 metres beneath mezzanines. Streetfront units are planned with glazed roller doors, while other warehouse entrances are specified at four metres wide and five metres high.





.acacia-breakout {
  max-width: 720px;
  margin: 1.5rem auto;
  padding: 20px;
  border: 1px solid #d9d9d9;
  border-radius: 8px;
  background: #f7f7f7;
  color: #242424;
  font-family: Arial, sans-serif;
}
.acacia-breakout h3 {
  margin: 0 0 16px;
  font-size: 1.2rem;
  line-height: 1.4;
}
.acacia-unit-grid {
  display: grid;
  grid-template-columns: repeat(2, minmax(0, 1fr));
  gap: 12px;
}
.acacia-unit {
  padding: 14px;
  background: #fff;
  border: 1px solid #dedede;
  border-radius: 6px;
}
.acacia-unit strong,
.acacia-unit span,
.acacia-unit small {
  display: block;
}
.acacia-unit strong {
  font-size: .95rem;
}
.acacia-unit span {
  margin: 8px 0;
  font-size: 1.25rem;
  font-weight: 700;
}
.acacia-unit small {
  font-size: .85rem;
  line-height: 1.5;
}
.acacia-source {
  margin: 14px 0 0;
  color: #555;
  font-size: .8rem;
  line-height: 1.5;
}
@media (max-width: 480px) {
  .acacia-breakout { padding: 14px; }
  .acacia-unit-grid {
    grid-template-columns: 1fr;
  }
}



  
    Acacia Junction: Four Warehouse Formats
  

  
    
      Streetfront
      218 m²
      Unit 202 · 2 car spaces
    

    
      Enterprise
      424 m²
      Unit 103 · 4 car spaces
    

    
      Core
      155 m²
      Unit 125 · 2 car spaces
    

    
      Essential
      49 m²
      Unit 405 · 1 car space
    
  

  
    Source: Acacia Junction project brochure,
    September 2026. Example specifications are
    indicative and subject to change.
  





Each warehouse is planned to include a ground-floor kitchenette, toilet and shower. Shared facilities are intended to include a meeting room, car wash bay, bicycle storage, end-of-trip amenities and a container set-down area, alongside CCTV and controlled gates. Parking allocations will vary by unit. The units are planned to be individually strata titled, with body corporate fees yet to be confirmed.&nbsp;



The property is opposite Acacia Marketplace, home to Woolworths, Aldi, Sydney Tools, Total Tools and Australia Post. It is also beside the railway corridor, with access to Beaudesert Road.



Photo Credit: Inca Property Group/Facebook



Acacia Junction Application Remains In Progress



BCC approved a subdivision application for the site on 18 March 2026, following its lodgement on 26 February. A separate application lodged on 23 July covers operational works and a material change of use involving low-impact industry and warehousing.



Read: Sunnybank Teacher Shares Personal Journey Ahead of World Teachers’ Day



The latest retrieved BCC record lists the industrial application as in progress, with no decision date recorded. The earlier subdivision approval does not establish approval for the proposed warehouses and related works. BCC records put the existing property area at 25,210 square metres. Construction is scheduled to begin in December 2026, with completion anticipated in late 2027.



Published 28-October-2026
]]></description>
<content:encoded><![CDATA[
Sales have opened for 59 proposed warehouse units at Acacia Junction, an industrial precinct planned for 170 Postle Street in Acacia Ridge.



Read: Baby Rhyme Time Brings a Little Rhythm to Brisbane’s Libraries



Inca Property Group is behind the multi-stage project, which its representatives value at $100 million. The first release includes units measuring approximately 49 to 424 square metres, from compact storage spaces and streetfront showrooms to larger industrial premises. RWC Collective and Knight Frank are marketing the units, with advertised prices starting at $450,000.



Project representatives have reported $15 million in pre-launch sales. Inca managing director Josh Thompson has linked the reported result to buyer demand, while RWC Collective partner Neal Orpin has described a shortage of smaller industrial premises in the area.



Photo Credit: Inca Property Group/Facebook



Warehouse Layouts And Shared Facilities



Architectural firm CELLA designed the proposed estate, including spaces with adaptable mezzanine configurations. The project brochure specifies concrete tilt-panel construction, approximately 7.5 metres of warehouse clearance and about 3.5 metres beneath mezzanines. Streetfront units are planned with glazed roller doors, while other warehouse entrances are specified at four metres wide and five metres high.





.acacia-breakout {
  max-width: 720px;
  margin: 1.5rem auto;
  padding: 20px;
  border: 1px solid #d9d9d9;
  border-radius: 8px;
  background: #f7f7f7;
  color: #242424;
  font-family: Arial, sans-serif;
}
.acacia-breakout h3 {
  margin: 0 0 16px;
  font-size: 1.2rem;
  line-height: 1.4;
}
.acacia-unit-grid {
  display: grid;
  grid-template-columns: repeat(2, minmax(0, 1fr));
  gap: 12px;
}
.acacia-unit {
  padding: 14px;
  background: #fff;
  border: 1px solid #dedede;
  border-radius: 6px;
}
.acacia-unit strong,
.acacia-unit span,
.acacia-unit small {
  display: block;
}
.acacia-unit strong {
  font-size: .95rem;
}
.acacia-unit span {
  margin: 8px 0;
  font-size: 1.25rem;
  font-weight: 700;
}
.acacia-unit small {
  font-size: .85rem;
  line-height: 1.5;
}
.acacia-source {
  margin: 14px 0 0;
  color: #555;
  font-size: .8rem;
  line-height: 1.5;
}
@media (max-width: 480px) {
  .acacia-breakout { padding: 14px; }
  .acacia-unit-grid {
    grid-template-columns: 1fr;
  }
}



  
    Acacia Junction: Four Warehouse Formats
  

  
    
      Streetfront
      218 m²
      Unit 202 · 2 car spaces
    

    
      Enterprise
      424 m²
      Unit 103 · 4 car spaces
    

    
      Core
      155 m²
      Unit 125 · 2 car spaces
    

    
      Essential
      49 m²
      Unit 405 · 1 car space
    
  

  
    Source: Acacia Junction project brochure,
    September 2026. Example specifications are
    indicative and subject to change.
  





Each warehouse is planned to include a ground-floor kitchenette, toilet and shower. Shared facilities are intended to include a meeting room, car wash bay, bicycle storage, end-of-trip amenities and a container set-down area, alongside CCTV and controlled gates. Parking allocations will vary by unit. The units are planned to be individually strata titled, with body corporate fees yet to be confirmed.&nbsp;



The property is opposite Acacia Marketplace, home to Woolworths, Aldi, Sydney Tools, Total Tools and Australia Post. It is also beside the railway corridor, with access to Beaudesert Road.



Photo Credit: Inca Property Group/Facebook



Acacia Junction Application Remains In Progress



BCC approved a subdivision application for the site on 18 March 2026, following its lodgement on 26 February. A separate application lodged on 23 July covers operational works and a material change of use involving low-impact industry and warehousing.



Read: Sunnybank Teacher Shares Personal Journey Ahead of World Teachers’ Day



The latest retrieved BCC record lists the industrial application as in progress, with no decision date recorded. The earlier subdivision approval does not establish approval for the proposed warehouses and related works. BCC records put the existing property area at 25,210 square metres. Construction is scheduled to begin in December 2026, with completion anticipated in late 2027.



Published 28-October-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Baby Rhyme Time Brings a Little Rhythm to Brisbane’s Libraries]]></title>
<link>https://sunnybankhillsnews.com.au/baby-rhyme-time-brings-a-little-rhythm-to-brisbanes-libraries/baby-rhyme-time-brings-a-little-rhythm-to-brisbanes-libraries</link>
<media:content url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/10/BSON_First5Forever-1.jpg" medium="image"/>
<media:thumbnail url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/10/BSON_First5Forever-1.jpg"/>
<enclosure url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/10/BSON_First5Forever-1.jpg" length="82202" type="image/jpeg"/>
<pubDate>Wed, 28 Oct 2026 06:36:57 +0000</pubDate>
<dc:creator><![CDATA[Sunnybank Hills News]]></dc:creator>
<guid isPermaLink="true">https://sunnybankhillsnews.com.au/baby-rhyme-time-brings-a-little-rhythm-to-brisbanes-libraries/</guid>
<description><![CDATA[


Baby rhyme time is one of those small library events that quietly earns its keep. It is free, simple and aimed at babies up to one year old. The November schedule shows it at Indooroopilly, with the wider run also reaching libraries across Brisbane. That makes it an easy one for local families to actually use.



A quick outing that feels close to home 



The event page keeps things plain. Families can meet other parents and babies for singing, clapping and dancing. There is no booking needed, which keeps the whole thing easy. At the same time, places are limited, so a session can close if it fills up.



That balance suits a library pretty well. It is open, but not chaotic. It is friendly, but still orderly. For parents juggling naps, bottles and everything else, that sort of setup matters more than people might think. 



The bigger schedule gives the program a wider reach. Alongside Indooroopilly, it also shows sessions at places like Holland Park, Chermside, Carina, Banyo, Nundah and Zillmere. So this is not just one nice little event in one suburb. It is a regular community rhythm across several parts of the city. 



The kind of noise libraries can welcome 



Baby rhyme time works because it is built for the early months. The event listing says the songs and action rhymes help nurture pre-literacy, communication, language and social skills. That sounds formal, but the idea behind it is pretty simple. Babies hear words, watch faces and start getting used to the sound of language. 



That is where libraries come into their own. They are already calm places. They already belong to the community. So a session like this feels natural there, not bolted on. 



And honestly, that is part of the appeal. Parents do not need a grand plan for the morning. They just need something local, useful and low-fuss. Baby rhyme time gives them that. 



A small session worth repeating 



First 5 Forever backs the program, with the State Library of Queensland coordinating it in partnership with local government. That gives the session a proper public purpose, but the benefit is still felt at the local level. One suburb gets a room full of songs. Another suburb gets the same thing on a different day. 



That is the charm of it. Baby rhyme time is not trying to be bigger than it needs to be. It just gives babies, parents and carers a warm little place to start. In a city as busy as Brisbane, that feels worth keeping on the calendar.




  
    
      Place
      Date
      Time
    
  
  
    Annerley Library11/6/20269:15AM - 9:45 AM
    Annerley Library11/13/20269:15AM - 9:45 AM
    Annerley Library11/20/20269:15AM - 9:45 AM
    Annerley Library11/27/20269:15AM - 9:45 AM

    Ashgrove Library11/4/20269:30AM - 10:00 AM
    Ashgrove Library11/11/20269:30AM - 10:00 AM
    Ashgrove Library11/18/20269:30AM - 10:00 AM
    Ashgrove Library11/25/20269:30AM - 10:00 AM

    Banyo Library11/5/202611:30AM - 12:00PM
    Banyo Library11/12/202611:30AM - 12:00PM
    Banyo Library11/19/202611:30AM - 12:00PM
    Banyo Library11/26/202611:30AM - 12:00PM

    Bracken Ridge Library11/6/202610:00AM - 10:30 AM
    Bracken Ridge Library11/13/202610:00AM - 10:30 AM
    Bracken Ridge Library11/20/202610:00AM - 10:30 AM
    Bracken Ridge Library11/27/202610:00AM - 10:30 AM

    Brisbane Square Library11/5/202611:30AM - 12:00PM
    Brisbane Square Library11/12/202611:30AM - 12:00PM
    Brisbane Square Library11/19/202611:30AM - 12:00PM
    Brisbane Square Library11/26/202611:30AM - 12:00PM

    Bulimba Library11/5/202610:00AM - 10:30 AM
    Bulimba Library11/12/202610:00AM - 10:30 AM
    Bulimba Library11/19/202610:00AM - 10:30 AM
    Bulimba Library11/26/202610:00AM - 10:30 AM

    Carina Library11/2/202610:30AM- 11:00AM
    Carina Library11/9/202610:30AM- 11:00AM
    Carina Library11/16/202610:30AM- 11:00AM
    Carina Library11/23/202610:30AM- 11:00AM
    Carina Library11/30/202610:30AM- 11:00AM

    Carindale Library11/3/202610:45AM - 11:15AM
    Carindale Library11/4/202610:30AM- 11:00AM
    Carindale Library11/10/202610:45AM - 11:15AM
    Carindale Library11/11/202610:00AM - 10:30 AM
    Carindale Library11/17/202610:45AM - 11:15AM
    Carindale Library11/18/202610:00AM - 10:30 AM
    Carindale Library11/24/202610:45AM - 11:15AM
    Carindale Library11/25/202610:00AM - 10:30 AM

    Chermside Library11/3/202610:00AM - 10:30 AM
    Chermside Library11/3/202611:00AM - 11:30 AM
    Chermside Library11/4/202611:00AM - 11:30 AM
    Chermside Library11/10/202610:00AM - 10:30 AM
    Chermside Library11/10/202611:00AM - 11:30 AM
    Chermside Library11/11/202611:00AM - 11:30 AM
    Chermside Library11/17/202610:00AM - 10:30 AM
    Chermside Library11/17/202611:00AM - 11:30 AM
    Chermside Library11/18/202611:00AM - 11:30 AM
    Chermside Library11/24/202610:00AM - 10:30 AM
    Chermside Library11/24/202611:00AM - 11:30 AM
    Chermside Library11/25/202611:00AM - 11:30 AM

    Coopers Plain Library11/5/202610:00AM - 10:30 AM
    Coopers Plain Library11/12/202610:00AM - 10:30 AM
    Coopers Plain Library11/19/202610:00AM - 10:30 AM
    Coopers Plain Library11/26/202610:00AM - 10:30 AM

    Corinda Library11/6/20269:15AM - 9:45 AM
    Corinda Library11/13/20269:15AM - 9:45 AM
    Corinda Library11/20/20269:15AM - 9:45 AM
    Corinda Library11/27/20269:15AM - 9:45 AM

    Everton Park LIbrary11/3/202611:00AM - 11:30 AM
    Everton Park LIbrary11/10/202611:00AM - 11:30 AM
    Everton Park LIbrary11/17/202611:00AM - 11:30 AM
    Everton Park LIbrary11/24/202611:00AM - 11:30 AM

    Fairfield Library11/4/20269:30AM - 10:00 AM
    Fairfield Library11/11/20269:30AM - 10:00 AM
    Fairfield Library11/18/20269:30AM - 10:00 AM
    Fairfield Library11/25/20269:30AM - 10:00 AM

    Garden City Library11/2/202610:30AM- 11:00AM
    Garden City Library11/4/202610:30AM- 11:00AM
    Garden City Library11/9/202610:30AM- 11:00AM
    Garden City Library11/11/202610:30AM- 11:00AM
    Garden City Library11/16/202610:30AM- 11:00AM
    Garden City Library11/18/202610:30AM- 11:00AM
    Garden City Library11/23/202610:30AM- 11:00AM
    Garden City Library11/25/202610:30AM- 11:00AM
    Garden City Library11/30/202610:30AM- 11:00AM

    Grange Library11/5/202611:15AM - 11:45AM
    Grange Library11/12/202611:15AM - 11:45AM
    Grange Library11/19/202611:15AM - 11:45AM
    Grange Library11/26/202611:15AM - 11:45AM

    Holland Park Library11/4/20262:00PM - 2:30PM
    Holland Park Library11/11/20262:00PM - 2:30PM
    Holland Park Library11/18/20262:00PM - 2:30PM
    Holland Park Library11/25/20262:00PM - 2:30PM

    Inala Library11/3/20262:00PM - 2:30PM
    Inala Library11/10/20262:00PM - 2:30PM
    Inala Library11/17/20262:00PM - 2:30PM
    Inala Library11/24/20262:00PM - 2:30PM

    Indooroopilly Library11/2/202610:15AM - 10:45AM
    Indooroopilly Library11/6/202610:15AM - 10:45AM
    Indooroopilly Library11/9/202610:15AM - 10:45AM
    Indooroopilly Library11/13/202610:15AM - 10:45AM
    Indooroopilly Library11/16/202610:15AM - 10:45AM
    Indooroopilly Library11/20/202610:15AM - 10:45AM
    Indooroopilly Library11/23/202610:15AM - 10:45AM
    Indooroopilly Library11/27/202610:15AM - 10:45AM
    Indooroopilly Library11/30/202610:15AM - 10:45AM

    Kenmore Library11/4/202610:30AM- 11:00AM
    Kenmore Library11/11/202610:30AM- 11:00AM
    Kenmore Library11/18/202610:30AM- 11:00AM
    Kenmore Library11/25/202610:30AM- 11:00AM

    Mitchelton Library11/6/202611:00AM - 11:30 AM
    Mitchelton Library11/13/202611:00AM - 11:30 AM
    Mitchelton Library11/20/202611:00AM - 11:30 AM
    Mitchelton Library11/27/202611:00AM - 11:30 AM

    Mount Gravatt Library11/6/20269:30AM - 10:00 AM
    Mount Gravatt Library11/13/20269:30AM - 10:00 AM
    Mount Gravatt Library11/20/20269:30AM - 10:00 AM
    Mount Gravatt Library11/27/20269:30AM - 10:00 AM

    Mt Ommaney Library11/4/20269:30AM - 10:00 AM
    Mt Ommaney Library11/11/20269:30AM - 10:00 AM
    Mt Ommaney Library11/18/20269:30AM - 10:00 AM
    Mt Ommaney Library11/25/20269:30AM - 10:00 AM

    New Farm Library11/4/202611:00AM - 11:30 AM
    New Farm Library11/11/202611:00AM - 11:30 AM
    New Farm Library11/18/202611:00AM - 11:30 AM
    New Farm Library11/25/202611:00AM - 11:30 AM

    Nundah Library11/5/20269:30AM - 10:00 AM
    Nundah Library11/12/20269:30AM - 10:00 AM
    Nundah Library11/19/20269:30AM - 10:00 AM
    Nundah Library11/26/20269:30AM - 10:00 AM

    Sandgate Library11/6/202610:00AM - 10:30 AM
    Sandgate Library11/13/202610:00AM - 10:30 AM
    Sandgate Library11/20/202610:00AM - 10:30 AM
    Sandgate Library11/27/202610:00AM - 10:30 AM

    Stones Corner Library11/6/20269:30AM - 10:00 AM
    Stones Corner Library11/13/20269:30AM - 10:00 AM
    Stones Corner Library11/20/20269:30AM - 10:00 AM
    Stones Corner Library11/27/20269:30AM - 10:00 AM

    Sunnybank Hills Library11/2/202610:30AM- 11:00AM
    Sunnybank Hills Library11/9/202610:30AM- 11:00AM
    Sunnybank Hills Library11/16/202610:30AM- 11:00AM
    Sunnybank Hills Library11/23/202610:30AM- 11:00AM
    Sunnybank Hills Library11/30/202610:30AM- 11:00AM

    Toowong Library11/3/202611:30AM - 12:00PM
    Toowong Library11/10/202611:30AM - 12:00PM
    Toowong Library11/17/202611:30AM - 12:00PM
    Toowong Library11/24/202611:30AM - 12:00PM

    West End Library11/4/20269:15AM - 9:45 AM
    West End Library11/11/20269:15AM - 9:45 AM
    West End Library11/18/20269:15AM - 9:45 AM
    West End Library11/25/20269:15AM - 9:45 AM

    Wynnum Library11/6/20269:15AM - 9:45 AM
    Wynnum Library11/13/20269:15AM - 9:45 AM
    Wynnum Library11/20/20269:15AM - 9:45 AM
    Wynnum Library11/27/20269:15AM - 9:45 AM

    Zillmere Library11/5/202610:30AM- 11:00AM
    Zillmere Library11/12/202610:30AM- 11:00AM
    Zillmere Library11/19/202610:30AM- 11:00AM
    Zillmere Library11/26/202610:30AM- 11:00AM
  




Published 28-October-2026
]]></description>
<content:encoded><![CDATA[


Baby rhyme time is one of those small library events that quietly earns its keep. It is free, simple and aimed at babies up to one year old. The November schedule shows it at Indooroopilly, with the wider run also reaching libraries across Brisbane. That makes it an easy one for local families to actually use.



A quick outing that feels close to home 



The event page keeps things plain. Families can meet other parents and babies for singing, clapping and dancing. There is no booking needed, which keeps the whole thing easy. At the same time, places are limited, so a session can close if it fills up.



That balance suits a library pretty well. It is open, but not chaotic. It is friendly, but still orderly. For parents juggling naps, bottles and everything else, that sort of setup matters more than people might think. 



The bigger schedule gives the program a wider reach. Alongside Indooroopilly, it also shows sessions at places like Holland Park, Chermside, Carina, Banyo, Nundah and Zillmere. So this is not just one nice little event in one suburb. It is a regular community rhythm across several parts of the city. 



The kind of noise libraries can welcome 



Baby rhyme time works because it is built for the early months. The event listing says the songs and action rhymes help nurture pre-literacy, communication, language and social skills. That sounds formal, but the idea behind it is pretty simple. Babies hear words, watch faces and start getting used to the sound of language. 



That is where libraries come into their own. They are already calm places. They already belong to the community. So a session like this feels natural there, not bolted on. 



And honestly, that is part of the appeal. Parents do not need a grand plan for the morning. They just need something local, useful and low-fuss. Baby rhyme time gives them that. 



A small session worth repeating 



First 5 Forever backs the program, with the State Library of Queensland coordinating it in partnership with local government. That gives the session a proper public purpose, but the benefit is still felt at the local level. One suburb gets a room full of songs. Another suburb gets the same thing on a different day. 



That is the charm of it. Baby rhyme time is not trying to be bigger than it needs to be. It just gives babies, parents and carers a warm little place to start. In a city as busy as Brisbane, that feels worth keeping on the calendar.




  
    
      Place
      Date
      Time
    
  
  
    Annerley Library11/6/20269:15AM - 9:45 AM
    Annerley Library11/13/20269:15AM - 9:45 AM
    Annerley Library11/20/20269:15AM - 9:45 AM
    Annerley Library11/27/20269:15AM - 9:45 AM

    Ashgrove Library11/4/20269:30AM - 10:00 AM
    Ashgrove Library11/11/20269:30AM - 10:00 AM
    Ashgrove Library11/18/20269:30AM - 10:00 AM
    Ashgrove Library11/25/20269:30AM - 10:00 AM

    Banyo Library11/5/202611:30AM - 12:00PM
    Banyo Library11/12/202611:30AM - 12:00PM
    Banyo Library11/19/202611:30AM - 12:00PM
    Banyo Library11/26/202611:30AM - 12:00PM

    Bracken Ridge Library11/6/202610:00AM - 10:30 AM
    Bracken Ridge Library11/13/202610:00AM - 10:30 AM
    Bracken Ridge Library11/20/202610:00AM - 10:30 AM
    Bracken Ridge Library11/27/202610:00AM - 10:30 AM

    Brisbane Square Library11/5/202611:30AM - 12:00PM
    Brisbane Square Library11/12/202611:30AM - 12:00PM
    Brisbane Square Library11/19/202611:30AM - 12:00PM
    Brisbane Square Library11/26/202611:30AM - 12:00PM

    Bulimba Library11/5/202610:00AM - 10:30 AM
    Bulimba Library11/12/202610:00AM - 10:30 AM
    Bulimba Library11/19/202610:00AM - 10:30 AM
    Bulimba Library11/26/202610:00AM - 10:30 AM

    Carina Library11/2/202610:30AM- 11:00AM
    Carina Library11/9/202610:30AM- 11:00AM
    Carina Library11/16/202610:30AM- 11:00AM
    Carina Library11/23/202610:30AM- 11:00AM
    Carina Library11/30/202610:30AM- 11:00AM

    Carindale Library11/3/202610:45AM - 11:15AM
    Carindale Library11/4/202610:30AM- 11:00AM
    Carindale Library11/10/202610:45AM - 11:15AM
    Carindale Library11/11/202610:00AM - 10:30 AM
    Carindale Library11/17/202610:45AM - 11:15AM
    Carindale Library11/18/202610:00AM - 10:30 AM
    Carindale Library11/24/202610:45AM - 11:15AM
    Carindale Library11/25/202610:00AM - 10:30 AM

    Chermside Library11/3/202610:00AM - 10:30 AM
    Chermside Library11/3/202611:00AM - 11:30 AM
    Chermside Library11/4/202611:00AM - 11:30 AM
    Chermside Library11/10/202610:00AM - 10:30 AM
    Chermside Library11/10/202611:00AM - 11:30 AM
    Chermside Library11/11/202611:00AM - 11:30 AM
    Chermside Library11/17/202610:00AM - 10:30 AM
    Chermside Library11/17/202611:00AM - 11:30 AM
    Chermside Library11/18/202611:00AM - 11:30 AM
    Chermside Library11/24/202610:00AM - 10:30 AM
    Chermside Library11/24/202611:00AM - 11:30 AM
    Chermside Library11/25/202611:00AM - 11:30 AM

    Coopers Plain Library11/5/202610:00AM - 10:30 AM
    Coopers Plain Library11/12/202610:00AM - 10:30 AM
    Coopers Plain Library11/19/202610:00AM - 10:30 AM
    Coopers Plain Library11/26/202610:00AM - 10:30 AM

    Corinda Library11/6/20269:15AM - 9:45 AM
    Corinda Library11/13/20269:15AM - 9:45 AM
    Corinda Library11/20/20269:15AM - 9:45 AM
    Corinda Library11/27/20269:15AM - 9:45 AM

    Everton Park LIbrary11/3/202611:00AM - 11:30 AM
    Everton Park LIbrary11/10/202611:00AM - 11:30 AM
    Everton Park LIbrary11/17/202611:00AM - 11:30 AM
    Everton Park LIbrary11/24/202611:00AM - 11:30 AM

    Fairfield Library11/4/20269:30AM - 10:00 AM
    Fairfield Library11/11/20269:30AM - 10:00 AM
    Fairfield Library11/18/20269:30AM - 10:00 AM
    Fairfield Library11/25/20269:30AM - 10:00 AM

    Garden City Library11/2/202610:30AM- 11:00AM
    Garden City Library11/4/202610:30AM- 11:00AM
    Garden City Library11/9/202610:30AM- 11:00AM
    Garden City Library11/11/202610:30AM- 11:00AM
    Garden City Library11/16/202610:30AM- 11:00AM
    Garden City Library11/18/202610:30AM- 11:00AM
    Garden City Library11/23/202610:30AM- 11:00AM
    Garden City Library11/25/202610:30AM- 11:00AM
    Garden City Library11/30/202610:30AM- 11:00AM

    Grange Library11/5/202611:15AM - 11:45AM
    Grange Library11/12/202611:15AM - 11:45AM
    Grange Library11/19/202611:15AM - 11:45AM
    Grange Library11/26/202611:15AM - 11:45AM

    Holland Park Library11/4/20262:00PM - 2:30PM
    Holland Park Library11/11/20262:00PM - 2:30PM
    Holland Park Library11/18/20262:00PM - 2:30PM
    Holland Park Library11/25/20262:00PM - 2:30PM

    Inala Library11/3/20262:00PM - 2:30PM
    Inala Library11/10/20262:00PM - 2:30PM
    Inala Library11/17/20262:00PM - 2:30PM
    Inala Library11/24/20262:00PM - 2:30PM

    Indooroopilly Library11/2/202610:15AM - 10:45AM
    Indooroopilly Library11/6/202610:15AM - 10:45AM
    Indooroopilly Library11/9/202610:15AM - 10:45AM
    Indooroopilly Library11/13/202610:15AM - 10:45AM
    Indooroopilly Library11/16/202610:15AM - 10:45AM
    Indooroopilly Library11/20/202610:15AM - 10:45AM
    Indooroopilly Library11/23/202610:15AM - 10:45AM
    Indooroopilly Library11/27/202610:15AM - 10:45AM
    Indooroopilly Library11/30/202610:15AM - 10:45AM

    Kenmore Library11/4/202610:30AM- 11:00AM
    Kenmore Library11/11/202610:30AM- 11:00AM
    Kenmore Library11/18/202610:30AM- 11:00AM
    Kenmore Library11/25/202610:30AM- 11:00AM

    Mitchelton Library11/6/202611:00AM - 11:30 AM
    Mitchelton Library11/13/202611:00AM - 11:30 AM
    Mitchelton Library11/20/202611:00AM - 11:30 AM
    Mitchelton Library11/27/202611:00AM - 11:30 AM

    Mount Gravatt Library11/6/20269:30AM - 10:00 AM
    Mount Gravatt Library11/13/20269:30AM - 10:00 AM
    Mount Gravatt Library11/20/20269:30AM - 10:00 AM
    Mount Gravatt Library11/27/20269:30AM - 10:00 AM

    Mt Ommaney Library11/4/20269:30AM - 10:00 AM
    Mt Ommaney Library11/11/20269:30AM - 10:00 AM
    Mt Ommaney Library11/18/20269:30AM - 10:00 AM
    Mt Ommaney Library11/25/20269:30AM - 10:00 AM

    New Farm Library11/4/202611:00AM - 11:30 AM
    New Farm Library11/11/202611:00AM - 11:30 AM
    New Farm Library11/18/202611:00AM - 11:30 AM
    New Farm Library11/25/202611:00AM - 11:30 AM

    Nundah Library11/5/20269:30AM - 10:00 AM
    Nundah Library11/12/20269:30AM - 10:00 AM
    Nundah Library11/19/20269:30AM - 10:00 AM
    Nundah Library11/26/20269:30AM - 10:00 AM

    Sandgate Library11/6/202610:00AM - 10:30 AM
    Sandgate Library11/13/202610:00AM - 10:30 AM
    Sandgate Library11/20/202610:00AM - 10:30 AM
    Sandgate Library11/27/202610:00AM - 10:30 AM

    Stones Corner Library11/6/20269:30AM - 10:00 AM
    Stones Corner Library11/13/20269:30AM - 10:00 AM
    Stones Corner Library11/20/20269:30AM - 10:00 AM
    Stones Corner Library11/27/20269:30AM - 10:00 AM

    Sunnybank Hills Library11/2/202610:30AM- 11:00AM
    Sunnybank Hills Library11/9/202610:30AM- 11:00AM
    Sunnybank Hills Library11/16/202610:30AM- 11:00AM
    Sunnybank Hills Library11/23/202610:30AM- 11:00AM
    Sunnybank Hills Library11/30/202610:30AM- 11:00AM

    Toowong Library11/3/202611:30AM - 12:00PM
    Toowong Library11/10/202611:30AM - 12:00PM
    Toowong Library11/17/202611:30AM - 12:00PM
    Toowong Library11/24/202611:30AM - 12:00PM

    West End Library11/4/20269:15AM - 9:45 AM
    West End Library11/11/20269:15AM - 9:45 AM
    West End Library11/18/20269:15AM - 9:45 AM
    West End Library11/25/20269:15AM - 9:45 AM

    Wynnum Library11/6/20269:15AM - 9:45 AM
    Wynnum Library11/13/20269:15AM - 9:45 AM
    Wynnum Library11/20/20269:15AM - 9:45 AM
    Wynnum Library11/27/20269:15AM - 9:45 AM

    Zillmere Library11/5/202610:30AM- 11:00AM
    Zillmere Library11/12/202610:30AM- 11:00AM
    Zillmere Library11/19/202610:30AM- 11:00AM
    Zillmere Library11/26/202610:30AM- 11:00AM
  




Published 28-October-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Sunnybank Teacher Shares Personal Journey Ahead of World Teachers’ Day]]></title>
<link>https://sunnybankhillsnews.com.au/sunnybank-teacher-shares-personal-journey-ahead-of-world-teachers-day</link>
<media:content url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/10/1-1.png" medium="image"/>
<media:thumbnail url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/10/1-1.png"/>
<enclosure url="https://sunnybankhillsnews.com.au/wp-content/uploads/2026/10/1-1.png" length="819378" type="image/png"/>
<pubDate>Thu, 29 Oct 2026 03:39:13 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[alternative education]]></category>
<category><![CDATA[Carinity Education Southside]]></category>
<category><![CDATA[Maddi Nicholson]]></category>
<category><![CDATA[Sunnybank educators]]></category>
<category><![CDATA[World Teachers’ Day 2026]]></category>
<dc:creator><![CDATA[Sunnybank Hills News]]></dc:creator>
<guid isPermaLink="true">https://sunnybankhillsnews.com.au/?page_id=14744</guid>
<description><![CDATA[
Sunnybank teacher Maddi Nicholson remembers struggling with confidence and motivation at school. Now working with young women at Carinity Education Southside, she draws on those experiences to better understand students facing barriers to learning.



Read: Brisbane Metro Expansion Survey Opens as Residents Asked About Local Transport Problems



Maddi has been teaching for eight years and is sharing her experiences ahead of Queensland's World Teachers’ Day on Friday, 30 October 2026. Her work involves supporting students who have previously disengaged from education or experienced difficulties with learning.



Sunnybank Teacher Remembers Classroom Challenges



Maddi's own school years were not always easy. She sometimes lacked confidence and struggled to remain motivated, something her students do not necessarily expect to hear from their teacher.



“Students are often surprised to learn that I wasn’t always confident and often struggled to stay motivated at school,” Maddi said.



“Because of those experiences, I understand that learning can be challenging and I try to support my students in building confidence and finding their own path to success.”



Maddi Nicholson enjoys helping young women at Carinity Education Southsidedevelop the confidence and skills they need to succeed.Photo Credit: Supplied



Carinity Education Southside, located at 153 Lister Street, is an independent special assistance school catering for young women in Years 7 to 12. It provides alternative education for students who have encountered difficulties remaining engaged in conventional schooling. The school's approach attracted Maddi to the teaching role, where she focuses on helping students strengthen their academic abilities and develop greater independence.



Her interest in teaching comes from working with young people and supporting their development beyond academic achievement. She finds satisfaction in helping students work through difficulties and recognising their progress.



World Teachers’ Day Across Queensland



Queensland will celebrate World Teachers’ Day under the theme ‘Teachers change lives’, recognising educators working across the state's schools. The campaign is a joint initiative involving the Queensland College of Teachers, teachers' unions and organisations representing different education sectors. The Queensland Government has also announced public activities and landmark illuminations in Brisbane and other parts of the state.





.wtd-box {
  box-sizing: border-box;
  width: 100%;
  max-width: 100%;
  margin: 22px 0;
  padding: 18px;
  background: #f8fafc;
  border: 1px solid #d1d5db;
  border-radius: 8px;
  color: #222;
  font-family: Arial, sans-serif;
  line-height: 1.55;
}

.wtd-box h3 {
  font-size: 19px;
  line-height: 1.3;
  margin: 0 0 14px;
}

.wtd-box h4 {
  font-size: 15px;
  margin: 14px 0 5px;
}

.wtd-box p {
  margin: 0 0 10px;
  font-size: 14px;
}

.wtd-box a {
  color: #154c79;
  text-decoration: underline;
  overflow-wrap: anywhere;
}

@media (max-width: 600px) {
  .wtd-box {
    padding: 14px;
  }

  .wtd-box h3 {
    font-size: 17px;
  }
}




  World Teachers' Day: Queensland activities

  Thursday 29 October - Brisbane
  
    Story Bridge, Victoria Bridge, Brisbane City Hall
    and Sandgate Town Hall are among the landmarks
    scheduled to be illuminated.
  

  Friday 30 October - Brisbane
  
    Kurilpa Bridge and Neville Bonner Bridge
    are listed for illumination.
  

  School activities
  
    Suggested activities include morning teas,
    thank-you cards, certificates and
    classroom decorations.
  

  Share appreciation
  
    Schools are encouraged to share messages
    using #WTDQLD.
  

  
    
      Queensland Government World Teachers' Day
    
  





Read: Baby Rhyme Time Brings a Little Rhythm to Brisbane’s Libraries



Carinity Education Southside is part of Carinity, a Queensland organisation whose origins date to an aged care service established in 1949. Its current services include alternative education, disability support, aged care and assistance for young people. After eight years in teaching, Maddi hopes her students will leave school as confident, happy young adults who recognise their potential and feel prepared to pursue their chosen paths.



Published 28-October-2026
]]></description>
<content:encoded><![CDATA[
Sunnybank teacher Maddi Nicholson remembers struggling with confidence and motivation at school. Now working with young women at Carinity Education Southside, she draws on those experiences to better understand students facing barriers to learning.



Read: Brisbane Metro Expansion Survey Opens as Residents Asked About Local Transport Problems



Maddi has been teaching for eight years and is sharing her experiences ahead of Queensland's World Teachers’ Day on Friday, 30 October 2026. Her work involves supporting students who have previously disengaged from education or experienced difficulties with learning.



Sunnybank Teacher Remembers Classroom Challenges



Maddi's own school years were not always easy. She sometimes lacked confidence and struggled to remain motivated, something her students do not necessarily expect to hear from their teacher.



“Students are often surprised to learn that I wasn’t always confident and often struggled to stay motivated at school,” Maddi said.



“Because of those experiences, I understand that learning can be challenging and I try to support my students in building confidence and finding their own path to success.”



Maddi Nicholson enjoys helping young women at Carinity Education Southsidedevelop the confidence and skills they need to succeed.Photo Credit: Supplied



Carinity Education Southside, located at 153 Lister Street, is an independent special assistance school catering for young women in Years 7 to 12. It provides alternative education for students who have encountered difficulties remaining engaged in conventional schooling. The school's approach attracted Maddi to the teaching role, where she focuses on helping students strengthen their academic abilities and develop greater independence.



Her interest in teaching comes from working with young people and supporting their development beyond academic achievement. She finds satisfaction in helping students work through difficulties and recognising their progress.



World Teachers’ Day Across Queensland



Queensland will celebrate World Teachers’ Day under the theme ‘Teachers change lives’, recognising educators working across the state's schools. The campaign is a joint initiative involving the Queensland College of Teachers, teachers' unions and organisations representing different education sectors. The Queensland Government has also announced public activities and landmark illuminations in Brisbane and other parts of the state.





.wtd-box {
  box-sizing: border-box;
  width: 100%;
  max-width: 100%;
  margin: 22px 0;
  padding: 18px;
  background: #f8fafc;
  border: 1px solid #d1d5db;
  border-radius: 8px;
  color: #222;
  font-family: Arial, sans-serif;
  line-height: 1.55;
}

.wtd-box h3 {
  font-size: 19px;
  line-height: 1.3;
  margin: 0 0 14px;
}

.wtd-box h4 {
  font-size: 15px;
  margin: 14px 0 5px;
}

.wtd-box p {
  margin: 0 0 10px;
  font-size: 14px;
}

.wtd-box a {
  color: #154c79;
  text-decoration: underline;
  overflow-wrap: anywhere;
}

@media (max-width: 600px) {
  .wtd-box {
    padding: 14px;
  }

  .wtd-box h3 {
    font-size: 17px;
  }
}




  World Teachers' Day: Queensland activities

  Thursday 29 October - Brisbane
  
    Story Bridge, Victoria Bridge, Brisbane City Hall
    and Sandgate Town Hall are among the landmarks
    scheduled to be illuminated.
  

  Friday 30 October - Brisbane
  
    Kurilpa Bridge and Neville Bonner Bridge
    are listed for illumination.
  

  School activities
  
    Suggested activities include morning teas,
    thank-you cards, certificates and
    classroom decorations.
  

  Share appreciation
  
    Schools are encouraged to share messages
    using #WTDQLD.
  

  
    
      Queensland Government World Teachers' Day
    
  





Read: Baby Rhyme Time Brings a Little Rhythm to Brisbane’s Libraries



Carinity Education Southside is part of Carinity, a Queensland organisation whose origins date to an aged care service established in 1949. Its current services include alternative education, disability support, aged care and assistance for young people. After eight years in teaching, Maddi hopes her students will leave school as confident, happy young adults who recognise their potential and feel prepared to pursue their chosen paths.



Published 28-October-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Inventions]]></title>
<link>https://tarragindinews.com.au/inventions</link>
<pubDate>Thu, 12 Nov 2026 19:16:34 +0000</pubDate>
<dc:creator><![CDATA[Tarragindi News]]></dc:creator>
<guid isPermaLink="true">https://tarragindinews.com.au/?page_id=19264</guid>
<description><![CDATA[]]></description>
<content:encoded><![CDATA[]]></content:encoded>
</item><item>
<title><![CDATA[Heavy Rain Floods Brisbane Roads as More Storms Threaten South East Queensland]]></title>
<link>https://tarragindinews.com.au/brisbane-roads-flood-more-storms-south-east-queensland/brisbane-roads-flood-more-storms-south-east-queensland</link>
<media:content url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires.png" medium="image"/>
<media:thumbnail url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires.png"/>
<enclosure url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Storm-Flooded-Brisbane-Street-with-Fallen-Wires.png" length="1832827" type="image/png"/>
<pubDate>Thu, 12 Nov 2026 02:03:41 +0000</pubDate>
<dc:creator><![CDATA[Tarragindi News]]></dc:creator>
<guid isPermaLink="true">https://tarragindinews.com.au/brisbane-roads-flood-more-storms-south-east-queensland/</guid>
<description><![CDATA[


Heavy rain has flooded roads across parts of Brisbane as residents in Moreton Bay, Redlands and surrounding South East Queensland communities prepare for another round of potentially severe thunderstorms following Wednesday's destructive weather.



The Bureau of Meteorology has warned that further storms could develop on Thursday, 12 November, bringing damaging winds, large hail and heavy rainfall capable of causing flash flooding.



The renewed threat comes as emergency crews continue clearing fallen trees, repairing damaged powerlines and responding to storm-related property damage. More than 80,000 homes and businesses across South East Queensland lost electricity at the height of Wednesday's storms, with tens of thousands still without power on Thursday morning.



Brisbane, Redlands and Moreton Bay were all affected by intense storm activity, with rainfall observations showing how quickly conditions deteriorated across southern and eastern suburbs.



Intense rainfall floods Brisbane streets



Some of Wednesday's heaviest rainfall was recorded in Brisbane's southern and eastern suburbs, where intense downpours delivered substantial amounts of rain in just half an hour.



Bureau of Meteorology observations recorded 78 millimetres at Wishart in the 30 minutes to 4:39 p.m., while Chandler received 75 millimetres in the 30 minutes to 4:52 p.m. Nearby Burbank recorded 59 millimetres over a similar period.



The short, intense bursts of rainfall created flash-flooding hazards on local roads and placed additional pressure on drainage systems.&nbsp;



In Gumdale, Formosa Road was closed to through traffic between Stanbrough Road and Dairy Swamp Road because of flash flooding. Emergency crews were also called to Gumdale on Wednesday evening after a vehicle became stranded in floodwater. Swiftwater rescue personnel assisted the driver to safety.



Elsewhere in Brisbane, a falling tree struck two vehicles on Logan Road at Eight Mile Plains as severe winds swept through the area.



Brisbane Airport recorded a wind gust of 96 kilometres per hour at 5:03 p.m. on Wednesday, with the severe weather causing flight delays, cancellations and temporary operational disruption.



Motorists are being urged to check road conditions before travelling, particularly in areas affected by heavy rain and fallen trees. Road restrictions may be lifted or introduced as conditions change.




BRISBANE EMERGENCY DASHBOARD








Redlands hit by heavy rain as storms move towards the bay



Redlands also experienced intense rainfall as Wednesday's thunderstorms moved across eastern Brisbane and towards Moreton Bay.



The Bureau recorded 75 millimetres of rain at Leslie Harrison Dam in the 30 minutes to 4:47 p.m., placing the area among the locations that experienced the most intense short-duration rainfall during the event.



At 5:19 p.m., the Bureau issued a severe thunderstorm warning covering parts of Redland City, Brisbane and Moreton Bay. Storms detected around Ormiston and Brisbane Airport were capable of producing damaging winds and heavy rainfall that could lead to flash flooding.



Cleveland, Victoria Point, Ormiston and nearby islands were among the locations identified in warnings as the storms developed during the afternoon.



The State Emergency Service received 16 requests for assistance across Redlands following Wednesday's weather, adding to hundreds of calls received throughout South East Queensland.



Residents in Cleveland, Capalaba, Wellington Point, Victoria Point and surrounding suburbs can check the Redlands Coast Disaster Dashboard for local warnings, road closures, electricity interruptions and emergency information.




REDLANDS COAST DISASTER DASHBOARD








The dashboard also provides evacuation information when relevant. No widespread evacuation order affecting Redlands has been established in the reports reviewed for this article.



Moreton Bay suburbs face further storm threat



Communities across Moreton Bay were also within the path of Wednesday's severe weather, with storm cells developing near Caboolture and Burpengary before moving towards the coast.



The Bureau's afternoon warnings identified conditions capable of producing damaging winds, large hail and intense rainfall across parts of the Moreton Bay region.



By early evening, the warning area extended towards the waters off Redcliffe, with Redcliffe and Scarborough among the locations forecast to be affected as the storms moved north and northeast.



Electricity interruptions were reported across the wider Moreton Bay region during Wednesday's severe weather, although the largest concentration of damage to the Energex network occurred further south in Logan and the Scenic Rim.



For residents in Caboolture, Morayfield, Burpengary, North Lakes, Redcliffe and neighbouring suburbs, the City of Moreton Bay Disaster Dashboard provides a central source of local emergency updates.




CITY OF MORETON BAY DISASTER DASHBOARD








The council's dashboard includes weather warnings, road conditions, power outages and information about emergency facilities and available disaster support services.



Residents should continue checking official updates, particularly where local roads, waterways or properties remain vulnerable to another period of heavy rainfall.



Electricity restoration continues across the south-east



Restoring electricity remains one of the largest recovery operations following Wednesday's storms, with widespread damage to powerlines, poles and other infrastructure.



Energex reported more than 400 sections of powerline brought down across South East Queensland, while more than 120,000 lightning strikes were recorded during the severe weather.



The worst electrical damage was concentrated in Logan and the Scenic Rim, where falling trees and damaged infrastructure left tens of thousands of properties disconnected.



By Thursday morning, approximately 55,000 properties across the region remained without power, according to ABC News reporting based on Energex information. Repair crews were being reinforced as assessments identified damaged poles and lines requiring replacement.



Some customers may face prolonged interruptions, particularly where access is obstructed or major infrastructure repairs are required.



Residents in Brisbane, Redlands and Moreton Bay can use the Energex Outage Finder to check reported power interruptions, affected locations and available restoration estimates.




ENERGEX OUTAGE FINDER








Energex has warned residents to remain clear of fallen electrical wires and to treat damaged powerlines as live. Electrical emergencies can be reported on 13 19 62.



School closures and transport disruption



Wednesday's storms also disrupted education across South East Queensland, with schools in the hardest-hit districts unable to operate normally because of damage and electricity interruptions.



Eleven state schools in the Logan City Council area were reported closed on Thursday morning, including campuses in Marsden, Crestmead, Jimboomba and Yarrabilba. Subsequent reporting placed the number of affected schools in the broader Logan and Jimboomba area at 13.



Within Brisbane, Mansfield State School cancelled a prep orientation session after experiencing telephone and internet disruption.



Parents across Brisbane, Moreton Bay and Redlands can check the Queensland Government's current emergency school closures register for information about affected state, independent and Catholic schools.




QLD SCHOOL CLOSURES








The register should be checked before travelling, as schools may reopen once power, access and safety conditions have been assessed. Families should also consult their school's own communications for local arrangements.



Transport disruption has extended beyond flooded roads. Brisbane Airport experienced delays and cancellations during Wednesday's storms, while local road hazards included fallen branches, damaged traffic infrastructure and standing water.



Drivers can check QLDTraffic or the Transport and Main Roads Road Status Update for restrictions affecting state-controlled roads. Council emergency dashboards provide additional local information.




TMR ROAD STATUS UPDATE








Emergency crews respond to hundreds of calls



The State Emergency Service received more than 320 requests for assistance across South East Queensland after Wednesday's storms.



Logan accounted for the majority of the calls, but emergency crews were also deployed across Brisbane, Redlands and other affected areas.



The requests largely involved fallen trees, damaged roofs, blocked access to properties and other storm-related hazards. Brisbane recorded 41 requests, while Redlands recorded 16.



Emergency workers have been clearing debris, securing damaged structures and helping residents protect properties exposed to further rainfall.



Authorities are also urging residents to avoid floodwater and stay away from fallen electrical infrastructure. Even shallow floodwater can conceal damaged road surfaces, debris and strong currents.



More severe thunderstorms possible



The Bureau of Meteorology has forecast another period of unsettled weather across South East Queensland on Thursday, with severe thunderstorms possible from the Gold Coast through Brisbane and the Sunshine Coast towards Bundaberg.



Forecasters have identified damaging winds, large hail and heavy rainfall leading to flash flooding as the main hazards.



The threat is particularly concerning for communities still dealing with damaged buildings, blocked access and electricity interruptions from Wednesday's storms.



Storm activity may ease in some districts on Friday before increasing again over the weekend as another weather system develops across inland Queensland.



Residents should monitor the Bureau of Meteorology's Queensland warnings and check their local council's emergency information before making travel plans.




BOM QUEENSLAND WARNINGS









  What residents should do
  
    Check weather warnings before travelling
    Avoid flooded roads and never drive through floodwater
    Stay clear of fallen powerlines
    Charge phones and devices while power is available
    Secure loose outdoor items where safe
    Call SES on 132 500 for non-life-threatening storm damage
    Call 000 in a life-threatening emergency
  




Published 12-Nov-2026
]]></description>
<content:encoded><![CDATA[


Heavy rain has flooded roads across parts of Brisbane as residents in Moreton Bay, Redlands and surrounding South East Queensland communities prepare for another round of potentially severe thunderstorms following Wednesday's destructive weather.



The Bureau of Meteorology has warned that further storms could develop on Thursday, 12 November, bringing damaging winds, large hail and heavy rainfall capable of causing flash flooding.



The renewed threat comes as emergency crews continue clearing fallen trees, repairing damaged powerlines and responding to storm-related property damage. More than 80,000 homes and businesses across South East Queensland lost electricity at the height of Wednesday's storms, with tens of thousands still without power on Thursday morning.



Brisbane, Redlands and Moreton Bay were all affected by intense storm activity, with rainfall observations showing how quickly conditions deteriorated across southern and eastern suburbs.



Intense rainfall floods Brisbane streets



Some of Wednesday's heaviest rainfall was recorded in Brisbane's southern and eastern suburbs, where intense downpours delivered substantial amounts of rain in just half an hour.



Bureau of Meteorology observations recorded 78 millimetres at Wishart in the 30 minutes to 4:39 p.m., while Chandler received 75 millimetres in the 30 minutes to 4:52 p.m. Nearby Burbank recorded 59 millimetres over a similar period.



The short, intense bursts of rainfall created flash-flooding hazards on local roads and placed additional pressure on drainage systems.&nbsp;



In Gumdale, Formosa Road was closed to through traffic between Stanbrough Road and Dairy Swamp Road because of flash flooding. Emergency crews were also called to Gumdale on Wednesday evening after a vehicle became stranded in floodwater. Swiftwater rescue personnel assisted the driver to safety.



Elsewhere in Brisbane, a falling tree struck two vehicles on Logan Road at Eight Mile Plains as severe winds swept through the area.



Brisbane Airport recorded a wind gust of 96 kilometres per hour at 5:03 p.m. on Wednesday, with the severe weather causing flight delays, cancellations and temporary operational disruption.



Motorists are being urged to check road conditions before travelling, particularly in areas affected by heavy rain and fallen trees. Road restrictions may be lifted or introduced as conditions change.




BRISBANE EMERGENCY DASHBOARD








Redlands hit by heavy rain as storms move towards the bay



Redlands also experienced intense rainfall as Wednesday's thunderstorms moved across eastern Brisbane and towards Moreton Bay.



The Bureau recorded 75 millimetres of rain at Leslie Harrison Dam in the 30 minutes to 4:47 p.m., placing the area among the locations that experienced the most intense short-duration rainfall during the event.



At 5:19 p.m., the Bureau issued a severe thunderstorm warning covering parts of Redland City, Brisbane and Moreton Bay. Storms detected around Ormiston and Brisbane Airport were capable of producing damaging winds and heavy rainfall that could lead to flash flooding.



Cleveland, Victoria Point, Ormiston and nearby islands were among the locations identified in warnings as the storms developed during the afternoon.



The State Emergency Service received 16 requests for assistance across Redlands following Wednesday's weather, adding to hundreds of calls received throughout South East Queensland.



Residents in Cleveland, Capalaba, Wellington Point, Victoria Point and surrounding suburbs can check the Redlands Coast Disaster Dashboard for local warnings, road closures, electricity interruptions and emergency information.




REDLANDS COAST DISASTER DASHBOARD








The dashboard also provides evacuation information when relevant. No widespread evacuation order affecting Redlands has been established in the reports reviewed for this article.



Moreton Bay suburbs face further storm threat



Communities across Moreton Bay were also within the path of Wednesday's severe weather, with storm cells developing near Caboolture and Burpengary before moving towards the coast.



The Bureau's afternoon warnings identified conditions capable of producing damaging winds, large hail and intense rainfall across parts of the Moreton Bay region.



By early evening, the warning area extended towards the waters off Redcliffe, with Redcliffe and Scarborough among the locations forecast to be affected as the storms moved north and northeast.



Electricity interruptions were reported across the wider Moreton Bay region during Wednesday's severe weather, although the largest concentration of damage to the Energex network occurred further south in Logan and the Scenic Rim.



For residents in Caboolture, Morayfield, Burpengary, North Lakes, Redcliffe and neighbouring suburbs, the City of Moreton Bay Disaster Dashboard provides a central source of local emergency updates.




CITY OF MORETON BAY DISASTER DASHBOARD








The council's dashboard includes weather warnings, road conditions, power outages and information about emergency facilities and available disaster support services.



Residents should continue checking official updates, particularly where local roads, waterways or properties remain vulnerable to another period of heavy rainfall.



Electricity restoration continues across the south-east



Restoring electricity remains one of the largest recovery operations following Wednesday's storms, with widespread damage to powerlines, poles and other infrastructure.



Energex reported more than 400 sections of powerline brought down across South East Queensland, while more than 120,000 lightning strikes were recorded during the severe weather.



The worst electrical damage was concentrated in Logan and the Scenic Rim, where falling trees and damaged infrastructure left tens of thousands of properties disconnected.



By Thursday morning, approximately 55,000 properties across the region remained without power, according to ABC News reporting based on Energex information. Repair crews were being reinforced as assessments identified damaged poles and lines requiring replacement.



Some customers may face prolonged interruptions, particularly where access is obstructed or major infrastructure repairs are required.



Residents in Brisbane, Redlands and Moreton Bay can use the Energex Outage Finder to check reported power interruptions, affected locations and available restoration estimates.




ENERGEX OUTAGE FINDER








Energex has warned residents to remain clear of fallen electrical wires and to treat damaged powerlines as live. Electrical emergencies can be reported on 13 19 62.



School closures and transport disruption



Wednesday's storms also disrupted education across South East Queensland, with schools in the hardest-hit districts unable to operate normally because of damage and electricity interruptions.



Eleven state schools in the Logan City Council area were reported closed on Thursday morning, including campuses in Marsden, Crestmead, Jimboomba and Yarrabilba. Subsequent reporting placed the number of affected schools in the broader Logan and Jimboomba area at 13.



Within Brisbane, Mansfield State School cancelled a prep orientation session after experiencing telephone and internet disruption.



Parents across Brisbane, Moreton Bay and Redlands can check the Queensland Government's current emergency school closures register for information about affected state, independent and Catholic schools.




QLD SCHOOL CLOSURES








The register should be checked before travelling, as schools may reopen once power, access and safety conditions have been assessed. Families should also consult their school's own communications for local arrangements.



Transport disruption has extended beyond flooded roads. Brisbane Airport experienced delays and cancellations during Wednesday's storms, while local road hazards included fallen branches, damaged traffic infrastructure and standing water.



Drivers can check QLDTraffic or the Transport and Main Roads Road Status Update for restrictions affecting state-controlled roads. Council emergency dashboards provide additional local information.




TMR ROAD STATUS UPDATE








Emergency crews respond to hundreds of calls



The State Emergency Service received more than 320 requests for assistance across South East Queensland after Wednesday's storms.



Logan accounted for the majority of the calls, but emergency crews were also deployed across Brisbane, Redlands and other affected areas.



The requests largely involved fallen trees, damaged roofs, blocked access to properties and other storm-related hazards. Brisbane recorded 41 requests, while Redlands recorded 16.



Emergency workers have been clearing debris, securing damaged structures and helping residents protect properties exposed to further rainfall.



Authorities are also urging residents to avoid floodwater and stay away from fallen electrical infrastructure. Even shallow floodwater can conceal damaged road surfaces, debris and strong currents.



More severe thunderstorms possible



The Bureau of Meteorology has forecast another period of unsettled weather across South East Queensland on Thursday, with severe thunderstorms possible from the Gold Coast through Brisbane and the Sunshine Coast towards Bundaberg.



Forecasters have identified damaging winds, large hail and heavy rainfall leading to flash flooding as the main hazards.



The threat is particularly concerning for communities still dealing with damaged buildings, blocked access and electricity interruptions from Wednesday's storms.



Storm activity may ease in some districts on Friday before increasing again over the weekend as another weather system develops across inland Queensland.



Residents should monitor the Bureau of Meteorology's Queensland warnings and check their local council's emergency information before making travel plans.




BOM QUEENSLAND WARNINGS









  What residents should do
  
    Check weather warnings before travelling
    Avoid flooded roads and never drive through floodwater
    Stay clear of fallen powerlines
    Charge phones and devices while power is available
    Secure loose outdoor items where safe
    Call SES on 132 500 for non-life-threatening storm damage
    Call 000 in a life-threatening emergency
  




Published 12-Nov-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Queensland E-Bike Assurance Scheme: What Owners Need to Know]]></title>
<link>https://tarragindinews.com.au/queensland-e-bike-assurance-scheme-inspection-centres-2026/queensland-e-bike-assurance-scheme-inspection-centres-2026</link>
<media:content url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes.png" medium="image"/>
<media:thumbnail url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes.png"/>
<enclosure url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Brisbane-E-Bikes.png" length="1452970" type="image/png"/>
<pubDate>Wed, 11 Nov 2026 03:16:28 +0000</pubDate>
<dc:creator><![CDATA[Tarragindi News]]></dc:creator>
<guid isPermaLink="true">https://tarragindinews.com.au/queensland-e-bike-assurance-scheme-inspection-centres-2026/</guid>
<description><![CDATA[


Queensland e-bike owners facing new compliance requirements have only nine authorised inspection centres available statewide, with no locations currently listed in several major regional cities.



The Electrically Power-Assisted Cycle (EPAC) Assurance Scheme commenced on 2 November 2026, allowing owners of eligible older e-bikes to have their devices inspected and approved for continued legal use. However, the initial network consists entirely of Trek bicycle stores, most of them concentrated in south-east Queensland.



The state's official directory of authorised verifiers lists three centres in Brisbane, two on the Gold Coast, and one each in Ipswich, Moreton Bay, the Sunshine Coast and Rockhampton. There are no authorised locations currently listed in Townsville, Cairns, Toowoomba or Mackay.



Owners requiring verification must book an appointment and bring their e-bike to an approved retailer. The Department of Transport and Main Roads advises that appointments may take a couple of weeks, depending on individual store capacity.



The department expects additional retailers to join the program over the coming months. Alternative arrangements are also being developed for rural and remote residents without reasonable access to a verifier, with further details expected in early 2027.



Which e-bikes need inspection?



The scheme primarily covers eligible e-bikes manufactured before 1 July 2026 that do not meet the European EN 15194 standard or lack the required compliance label.



To qualify, these older bicycles must have pedals as their primary source of power, a maximum continuous rated motor output of 250 watts, and motor assistance that stops at 25 km/h. Where throttle control is fitted, throttle-only assistance must be limited to 6 km/h to help riders start moving.



Devices must also satisfy other technical and safety requirements before an authorised retailer can approve them. E-bikes that already meet EN 15194 and display the required compliance label do not need another inspection.



For eligible older bicycles, the initial pre-screening is free. A formal assessment may cost up to $50, with a further $20 permitted for issuing a permanent compliance label and recording the verification.



Owners covered by the transition arrangements have until 28 February 2027 to obtain the required label. From 1 March 2027, e-bikes that need verification must display the appropriate compliance label to continue being ridden legally in public.



The scheme cannot be used to legalise high-powered, high-speed or illegally modified devices. It also provides a separate pathway for certain e-bikes and e-trikes designed or adapted for people with disabilities or medical conditions.



A label issued through the scheme confirms that an eligible device has met Queensland's verification requirements. It does not certify full compliance with the European EN 15194 standard.






  
    Queensland E-Bike Inspections: What Owners Need to Know
  

  
    Queensland's new EPAC Assurance Scheme allows eligible older e-bikes to be inspected and approved for continued legal use.
  

  
    Scheme commenced: 2 November 2026
    Compliance deadline: 28 February 2027
    Initial screening: Free
    Formal inspection: Up to $50
    Compliance label: Up to $20
    Total possible cost: $70
    Authorised locations: Nine across Queensland at launch
    Already compliant? E-bikes meeting EN 15194 and displaying the required label do not need another inspection.
    Bookings: Appointments must be arranged with an authorised retailer.
  

  
    Important: The scheme does not legalise high-powered, high-speed or illegally modified devices.
  

  
    Source:
    
      Queensland Department of Transport and Main Roads – EPAC Assurance Scheme
    
  






Cycling advocates highlight the cost of compliance



Bicycle Queensland has supported clearer rules distinguishing lawful pedal-assisted bicycles from illegal high-powered devices, while the cost and accessibility of verification remain concerns for cycling advocates.



In its published explanation of the new laws, the organisation outlines the inspection process and the potential $70 charge facing owners whose existing bicycles require verification.



The fee applies to the formal assessment and labelling process rather than every e-bike owner. Riders whose bicycles already carry the correct EN 15194 label are not required to pay for another inspection.



The limited number of participating retailers also presents a practical question for people living far from an inspection centre, particularly those who rely on their e-bikes for everyday transport.



Bicycle Industries Australia has welcomed the scheme. Its general manager, Peter Bourke, has supported measures that help riders access safe, legal products and said the program would allow bicycle businesses to assist owners in establishing whether their devices meet Queensland's requirements.



The Department of Transport and Main Roads has described the scheme as a practical way for owners of legitimate existing e-bikes to continue riding, while keeping dangerous high-powered and high-speed devices off public roads and paths.



Research shows e-bikes are used across Queensland



The availability of inspection centres takes on wider significance when considered alongside new research into the growing number of Queenslanders using electric bicycles and other e-mobility devices.



A University of Queensland study, released on 21 October 2026, estimated that Queenslanders owned approximately 587,000 e-bikes, accounting for 61 per cent of privately owned e-mobility devices. The study also estimated 352,100 e-scooters and 30,400 other devices.



Researchers found that one in three Queensland households owned an e-mobility device, with total household spending on the devices estimated at $2.2 billion. Ownership was not confined to metropolitan areas. The study found that 28 per cent of households in remote Queensland reported owning an e-mobility device, reinforcing the importance of access to transport options outside major cities.



For one in four e-mobility users surveyed, a private car was their only alternative means of transport. More than half of the primary users of privately owned devices were aged 50 or older. The findings point to the role electric transport now plays in everyday travel, from commuting and shopping to recreation and maintaining independence.



However, the estimated 587,000 e-bikes do not represent the number requiring inspection under the new scheme. Many already meet the relevant standards, while others may be ineligible for verification.



The research also identified safety concerns. About half of privately owned e-mobility devices were classified as non-compliant based on owners' self-reported speed, motor power and throttle characteristics.



Researchers cautioned that the findings covered different types of e-mobility devices and did not establish how many existing e-bikes would require inspection or replacement compliance labels.



Safety reforms target illegal high-powered devices



The assurance scheme forms part of Queensland's broader e-mobility reforms, introduced amid concerns about serious injuries, unsafe riding and devices capable of travelling well beyond the permitted limits.



New rules introduced during 2026 include restrictions on motor power and speed, tighter age and licensing requirements, and expanded police enforcement powers.



Under the state's current e-bike rules, bicycles powered by motors exceeding 250 watts of maximum continuous rated output cannot legally be ridden on public roads or paths as ordinary e-bikes. Devices that depend entirely on throttle power, rather than pedalling, are also prohibited, apart from the limited starting assistance permitted under the rules. Police can issue significant fines and seize illegal devices.



Transport authorities say the verification process is intended to distinguish suitable older bicycles from machines that fail the state's safety requirements. The scheme gives owners of qualifying existing e-bikes a means of keeping their bicycles on the road without requiring them to meet every provision of the European standard introduced for newer devices.



Where owners can get their e-bikes checked



As of 11 November 2026, the Queensland Government lists nine authorised inspection centres, all operated by Trek Bicycle.



RegionAuthorised inspection centreBrisbaneTrek CarindaleBrisbaneTrek WindsorBrisbaneTrek WoolloongabbaIpswichTrek Ipswich, East IpswichMoreton BayTrek North LakesGold CoastTrek Ashmore, MolendinarGold CoastTrek Burleigh HeadsSunshine CoastTrek Sunshine Coast, MinyamaCentral QueenslandTrek Rockhampton, Norman Gardens



Source: Queensland Department of Transport and Main Roads, EPAC Assurance Scheme authorised verifier directory. The government has advised owners to check the directory regularly as more retailers join the scheme.



Owners must contact an authorised retailer to arrange an inspection before visiting. The department recommends bringing any available information about the bicycle's make, model, purchase date and technical specifications.



For eligible riders whose bicycles still need verification, the transition period provides an opportunity to arrange an inspection before the February deadline. Whether the expanding network reaches more regional communities before then remains an important question as the scheme progresses.



Published 10-Nov-2026Featured Image Credit: Brisbane City Council




]]></description>
<content:encoded><![CDATA[


Queensland e-bike owners facing new compliance requirements have only nine authorised inspection centres available statewide, with no locations currently listed in several major regional cities.



The Electrically Power-Assisted Cycle (EPAC) Assurance Scheme commenced on 2 November 2026, allowing owners of eligible older e-bikes to have their devices inspected and approved for continued legal use. However, the initial network consists entirely of Trek bicycle stores, most of them concentrated in south-east Queensland.



The state's official directory of authorised verifiers lists three centres in Brisbane, two on the Gold Coast, and one each in Ipswich, Moreton Bay, the Sunshine Coast and Rockhampton. There are no authorised locations currently listed in Townsville, Cairns, Toowoomba or Mackay.



Owners requiring verification must book an appointment and bring their e-bike to an approved retailer. The Department of Transport and Main Roads advises that appointments may take a couple of weeks, depending on individual store capacity.



The department expects additional retailers to join the program over the coming months. Alternative arrangements are also being developed for rural and remote residents without reasonable access to a verifier, with further details expected in early 2027.



Which e-bikes need inspection?



The scheme primarily covers eligible e-bikes manufactured before 1 July 2026 that do not meet the European EN 15194 standard or lack the required compliance label.



To qualify, these older bicycles must have pedals as their primary source of power, a maximum continuous rated motor output of 250 watts, and motor assistance that stops at 25 km/h. Where throttle control is fitted, throttle-only assistance must be limited to 6 km/h to help riders start moving.



Devices must also satisfy other technical and safety requirements before an authorised retailer can approve them. E-bikes that already meet EN 15194 and display the required compliance label do not need another inspection.



For eligible older bicycles, the initial pre-screening is free. A formal assessment may cost up to $50, with a further $20 permitted for issuing a permanent compliance label and recording the verification.



Owners covered by the transition arrangements have until 28 February 2027 to obtain the required label. From 1 March 2027, e-bikes that need verification must display the appropriate compliance label to continue being ridden legally in public.



The scheme cannot be used to legalise high-powered, high-speed or illegally modified devices. It also provides a separate pathway for certain e-bikes and e-trikes designed or adapted for people with disabilities or medical conditions.



A label issued through the scheme confirms that an eligible device has met Queensland's verification requirements. It does not certify full compliance with the European EN 15194 standard.






  
    Queensland E-Bike Inspections: What Owners Need to Know
  

  
    Queensland's new EPAC Assurance Scheme allows eligible older e-bikes to be inspected and approved for continued legal use.
  

  
    Scheme commenced: 2 November 2026
    Compliance deadline: 28 February 2027
    Initial screening: Free
    Formal inspection: Up to $50
    Compliance label: Up to $20
    Total possible cost: $70
    Authorised locations: Nine across Queensland at launch
    Already compliant? E-bikes meeting EN 15194 and displaying the required label do not need another inspection.
    Bookings: Appointments must be arranged with an authorised retailer.
  

  
    Important: The scheme does not legalise high-powered, high-speed or illegally modified devices.
  

  
    Source:
    
      Queensland Department of Transport and Main Roads – EPAC Assurance Scheme
    
  






Cycling advocates highlight the cost of compliance



Bicycle Queensland has supported clearer rules distinguishing lawful pedal-assisted bicycles from illegal high-powered devices, while the cost and accessibility of verification remain concerns for cycling advocates.



In its published explanation of the new laws, the organisation outlines the inspection process and the potential $70 charge facing owners whose existing bicycles require verification.



The fee applies to the formal assessment and labelling process rather than every e-bike owner. Riders whose bicycles already carry the correct EN 15194 label are not required to pay for another inspection.



The limited number of participating retailers also presents a practical question for people living far from an inspection centre, particularly those who rely on their e-bikes for everyday transport.



Bicycle Industries Australia has welcomed the scheme. Its general manager, Peter Bourke, has supported measures that help riders access safe, legal products and said the program would allow bicycle businesses to assist owners in establishing whether their devices meet Queensland's requirements.



The Department of Transport and Main Roads has described the scheme as a practical way for owners of legitimate existing e-bikes to continue riding, while keeping dangerous high-powered and high-speed devices off public roads and paths.



Research shows e-bikes are used across Queensland



The availability of inspection centres takes on wider significance when considered alongside new research into the growing number of Queenslanders using electric bicycles and other e-mobility devices.



A University of Queensland study, released on 21 October 2026, estimated that Queenslanders owned approximately 587,000 e-bikes, accounting for 61 per cent of privately owned e-mobility devices. The study also estimated 352,100 e-scooters and 30,400 other devices.



Researchers found that one in three Queensland households owned an e-mobility device, with total household spending on the devices estimated at $2.2 billion. Ownership was not confined to metropolitan areas. The study found that 28 per cent of households in remote Queensland reported owning an e-mobility device, reinforcing the importance of access to transport options outside major cities.



For one in four e-mobility users surveyed, a private car was their only alternative means of transport. More than half of the primary users of privately owned devices were aged 50 or older. The findings point to the role electric transport now plays in everyday travel, from commuting and shopping to recreation and maintaining independence.



However, the estimated 587,000 e-bikes do not represent the number requiring inspection under the new scheme. Many already meet the relevant standards, while others may be ineligible for verification.



The research also identified safety concerns. About half of privately owned e-mobility devices were classified as non-compliant based on owners' self-reported speed, motor power and throttle characteristics.



Researchers cautioned that the findings covered different types of e-mobility devices and did not establish how many existing e-bikes would require inspection or replacement compliance labels.



Safety reforms target illegal high-powered devices



The assurance scheme forms part of Queensland's broader e-mobility reforms, introduced amid concerns about serious injuries, unsafe riding and devices capable of travelling well beyond the permitted limits.



New rules introduced during 2026 include restrictions on motor power and speed, tighter age and licensing requirements, and expanded police enforcement powers.



Under the state's current e-bike rules, bicycles powered by motors exceeding 250 watts of maximum continuous rated output cannot legally be ridden on public roads or paths as ordinary e-bikes. Devices that depend entirely on throttle power, rather than pedalling, are also prohibited, apart from the limited starting assistance permitted under the rules. Police can issue significant fines and seize illegal devices.



Transport authorities say the verification process is intended to distinguish suitable older bicycles from machines that fail the state's safety requirements. The scheme gives owners of qualifying existing e-bikes a means of keeping their bicycles on the road without requiring them to meet every provision of the European standard introduced for newer devices.



Where owners can get their e-bikes checked



As of 11 November 2026, the Queensland Government lists nine authorised inspection centres, all operated by Trek Bicycle.



RegionAuthorised inspection centreBrisbaneTrek CarindaleBrisbaneTrek WindsorBrisbaneTrek WoolloongabbaIpswichTrek Ipswich, East IpswichMoreton BayTrek North LakesGold CoastTrek Ashmore, MolendinarGold CoastTrek Burleigh HeadsSunshine CoastTrek Sunshine Coast, MinyamaCentral QueenslandTrek Rockhampton, Norman Gardens



Source: Queensland Department of Transport and Main Roads, EPAC Assurance Scheme authorised verifier directory. The government has advised owners to check the directory regularly as more retailers join the scheme.



Owners must contact an authorised retailer to arrange an inspection before visiting. The department recommends bringing any available information about the bicycle's make, model, purchase date and technical specifications.



For eligible riders whose bicycles still need verification, the transition period provides an opportunity to arrange an inspection before the February deadline. Whether the expanding network reaches more regional communities before then remains an important question as the scheme progresses.



Published 10-Nov-2026Featured Image Credit: Brisbane City Council




]]></content:encoded>
</item><item>
<title><![CDATA[Tarragindi Kids Turn Cookie Stall into $1,000 Fundraiser for Children and Wildlife]]></title>
<link>https://tarragindinews.com.au/tarragindi-cookie-crew-fundraiser</link>
<media:content url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Tarragindi-Cookie-Crew-FI.png" medium="image"/>
<media:thumbnail url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Tarragindi-Cookie-Crew-FI.png"/>
<enclosure url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Tarragindi-Cookie-Crew-FI.png" length="1751420" type="image/png"/>
<pubDate>Mon, 09 Nov 2026 22:07:25 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[Children's Charities]]></category>
<category><![CDATA[Community Fundraising]]></category>
<category><![CDATA[Cookie Crew]]></category>
<category><![CDATA[Laura Street Park]]></category>
<category><![CDATA[School Holiday Activities]]></category>
<category><![CDATA[tarragindi]]></category>
<category><![CDATA[Tarragindi Fundraiser]]></category>
<category><![CDATA[toohey forest]]></category>
<category><![CDATA[Wildlife Warriors]]></category>
<category><![CDATA[Young Entrepreneurs]]></category>
<dc:creator><![CDATA[Tarragindi News]]></dc:creator>
<guid isPermaLink="true">https://tarragindinews.com.au/?page_id=19243</guid>
<description><![CDATA[
A group of young entrepreneurs in Tarragindi has raised more than $1,000 for children's health and wildlife causes through a school holiday cookie business run by local children, some just seven years old.



Read: Tarragindi’s Toohey Forest: A Bushwalker’s Paradise Just Minutes from the City 



Cookie Crew was launched in January 2026 after Tarragindi mother Jessica Kong-Vidas's daughter Tilda and her friends decided to sell homemade cookies during a school holiday playdate. The group now involves more than 10 children who spend their holidays baking, making signs, serving customers and handling money.



The children have also developed their own sales strategies. During one bake sale, Tilda and her friend Winnie noticed potential customers at the nearby dog park. They packed cookies into a separate box, collected some change and headed over to sell their treats directly to park visitors.



“Well… there were people at the dog park, so I thought we should just run over to them instead of waiting for them to come,” Tilda said.



The idea worked, bringing in a few extra sales and giving the children another reason to experiment with running their business.



Young entrepreneurs find their feet



On another occasion, Tilda and Ava arranged to deliver an order directly to a customer's car. Their enthusiasm quickly spread through the group, with nearly every child rushing to help with the delivery. This left the parents looking after the cookie stall until Iza and Zara decided to stay behind and keep things running.



There have been other challenges, particularly keeping the young bakers from eating their own products. Jess recalled children serving customers with chocolate-covered mouths after sampling the cookies and cupcakes meant for sale.



The children have taken different roles within the group, with some enjoying baking and preparing the stall while others have developed a knack for approaching customers and making sales.



Ava has emerged as one of the more confident sellers, while Claire particularly enjoys counting the money. The children also help advertise around the park and decide how to organise their next sale.



Photo Credit: Supplied



Pocket money gives way to fundraising



The children initially hoped to earn some extra pocket money from their baking efforts, but their priorities changed as they discovered how much they could achieve by pooling their earnings. Jess said the prospect of making a few dollars each became less exciting than raising money for people and animals needing help.



Children's health was a cause with personal significance for the families. Jess's youngest daughter has spent considerable time attending hospital, while other children in the group have also encountered serious childhood illness through people close to them.



Photo Credit: Supplied



Their connection to the natural environment around Toohey Forest inspired the decision to support wildlife care. According to Jess, Cookie Crew has now raised more than $1,000 for children's health and wildlife causes combined.



Tilda also had an opportunity to see the work of a wildlife hospital firsthand. The turtle's name caught her attention because it was also the name of one of her Cookie Crew friends, making the experience especially memorable.



"There was a turtle called Winnie, just like my friend! She swallowed plastic but she's getting better now,” Tilda said.



Confidence grows with every sale



For Jess, who works in finance, Cookie Crew has also become an opportunity to teach the children practical lessons about money. She said several were initially shy around unfamiliar adults, but regular bake sales have helped them become more comfortable approaching customers, answering questions and managing transactions.



The children practise adding prices, calculating change and counting their earnings, giving them a chance to use their classroom maths skills in everyday situations.



They are also learning to make decisions together, solve problems and take responsibility for different parts of the business.



Jess has been particularly pleased to see their growing confidence and willingness to try their own ideas, even when those ideas involve abandoning the stall to chase a possible sale at the dog park.



Support from Tarragindi families, neighbours and regular park visitors has helped the children continue their efforts. Customers have returned to buy cookies and cupcakes, encouraging the group to keep baking during the school holidays.



The young sellers have also become familiar faces around the park, where their enthusiasm and occasional attempts at persuading customers have become part of the experience.



Read: Community Walk and Talk Supports Local Mothers in Tarragindi 



Cookie Crew returns to Laura Street Park



Cookie Crew will hold its next bake sale at Laura Street Park in Tarragindi on Sunday 15 November 2026, from 10:30 a.m., with cookies and cupcakes available for local residents. The upcoming sale will support wildlife care through Wildlife Warriors, continuing the children's fundraising efforts for animals in need.





  Cookie Crew's Next Bake Sale
  Date: Sunday 15 November 2026
  Time: From 10:30 a.m.
  Location: Laura Street Park, Tarragindi
  What's available: Homemade cookies and cupcakes
  Cause: Wildlife care through Wildlife Warriors
  Support Cookie Crew's fundraiser





Jess hopes the activity will remain part of the children's school holidays, giving them further opportunities to work together, develop their confidence and support causes they care about.



Published 10-Nov-2026
]]></description>
<content:encoded><![CDATA[
A group of young entrepreneurs in Tarragindi has raised more than $1,000 for children's health and wildlife causes through a school holiday cookie business run by local children, some just seven years old.



Read: Tarragindi’s Toohey Forest: A Bushwalker’s Paradise Just Minutes from the City 



Cookie Crew was launched in January 2026 after Tarragindi mother Jessica Kong-Vidas's daughter Tilda and her friends decided to sell homemade cookies during a school holiday playdate. The group now involves more than 10 children who spend their holidays baking, making signs, serving customers and handling money.



The children have also developed their own sales strategies. During one bake sale, Tilda and her friend Winnie noticed potential customers at the nearby dog park. They packed cookies into a separate box, collected some change and headed over to sell their treats directly to park visitors.



“Well… there were people at the dog park, so I thought we should just run over to them instead of waiting for them to come,” Tilda said.



The idea worked, bringing in a few extra sales and giving the children another reason to experiment with running their business.



Young entrepreneurs find their feet



On another occasion, Tilda and Ava arranged to deliver an order directly to a customer's car. Their enthusiasm quickly spread through the group, with nearly every child rushing to help with the delivery. This left the parents looking after the cookie stall until Iza and Zara decided to stay behind and keep things running.



There have been other challenges, particularly keeping the young bakers from eating their own products. Jess recalled children serving customers with chocolate-covered mouths after sampling the cookies and cupcakes meant for sale.



The children have taken different roles within the group, with some enjoying baking and preparing the stall while others have developed a knack for approaching customers and making sales.



Ava has emerged as one of the more confident sellers, while Claire particularly enjoys counting the money. The children also help advertise around the park and decide how to organise their next sale.



Photo Credit: Supplied



Pocket money gives way to fundraising



The children initially hoped to earn some extra pocket money from their baking efforts, but their priorities changed as they discovered how much they could achieve by pooling their earnings. Jess said the prospect of making a few dollars each became less exciting than raising money for people and animals needing help.



Children's health was a cause with personal significance for the families. Jess's youngest daughter has spent considerable time attending hospital, while other children in the group have also encountered serious childhood illness through people close to them.



Photo Credit: Supplied



Their connection to the natural environment around Toohey Forest inspired the decision to support wildlife care. According to Jess, Cookie Crew has now raised more than $1,000 for children's health and wildlife causes combined.



Tilda also had an opportunity to see the work of a wildlife hospital firsthand. The turtle's name caught her attention because it was also the name of one of her Cookie Crew friends, making the experience especially memorable.



"There was a turtle called Winnie, just like my friend! She swallowed plastic but she's getting better now,” Tilda said.



Confidence grows with every sale



For Jess, who works in finance, Cookie Crew has also become an opportunity to teach the children practical lessons about money. She said several were initially shy around unfamiliar adults, but regular bake sales have helped them become more comfortable approaching customers, answering questions and managing transactions.



The children practise adding prices, calculating change and counting their earnings, giving them a chance to use their classroom maths skills in everyday situations.



They are also learning to make decisions together, solve problems and take responsibility for different parts of the business.



Jess has been particularly pleased to see their growing confidence and willingness to try their own ideas, even when those ideas involve abandoning the stall to chase a possible sale at the dog park.



Support from Tarragindi families, neighbours and regular park visitors has helped the children continue their efforts. Customers have returned to buy cookies and cupcakes, encouraging the group to keep baking during the school holidays.



The young sellers have also become familiar faces around the park, where their enthusiasm and occasional attempts at persuading customers have become part of the experience.



Read: Community Walk and Talk Supports Local Mothers in Tarragindi 



Cookie Crew returns to Laura Street Park



Cookie Crew will hold its next bake sale at Laura Street Park in Tarragindi on Sunday 15 November 2026, from 10:30 a.m., with cookies and cupcakes available for local residents. The upcoming sale will support wildlife care through Wildlife Warriors, continuing the children's fundraising efforts for animals in need.





  Cookie Crew's Next Bake Sale
  Date: Sunday 15 November 2026
  Time: From 10:30 a.m.
  Location: Laura Street Park, Tarragindi
  What's available: Homemade cookies and cupcakes
  Cause: Wildlife care through Wildlife Warriors
  Support Cookie Crew's fundraiser





Jess hopes the activity will remain part of the children's school holidays, giving them further opportunities to work together, develop their confidence and support causes they care about.



Published 10-Nov-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Tarragindi Water Ratz Keep a Friday Night Swimming Tradition Going Since 1964]]></title>
<link>https://tarragindinews.com.au/tarragindi-water-ratz-swimming-club</link>
<media:content url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Wellers-Ratz.png" medium="image"/>
<media:thumbnail url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Wellers-Ratz.png"/>
<enclosure url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Wellers-Ratz.png" length="1392432" type="image/png"/>
<pubDate>Wed, 04 Nov 2026 02:31:50 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[Brisbane swimming clubs]]></category>
<category><![CDATA[community swimming]]></category>
<category><![CDATA[Friday night swimming]]></category>
<category><![CDATA[junior swimming]]></category>
<category><![CDATA[swimming club history]]></category>
<category><![CDATA[Tarragindi sport]]></category>
<category><![CDATA[Tarragindi swimming club]]></category>
<category><![CDATA[Tarragindi Water Ratz]]></category>
<category><![CDATA[Wellers Hill State School]]></category>
<category><![CDATA[Wellers Hill Water Ratz]]></category>
<dc:creator><![CDATA[Tarragindi News]]></dc:creator>
<guid isPermaLink="true">https://tarragindinews.com.au/?page_id=19228</guid>
<description><![CDATA[
For generations of Tarragindi families, Friday nights at Wellers Hill State School have meant more than swimming races, with the Water Ratz club bringing children and parents together through a community tradition dating back to 1964.



Read: From Wellers Hill Water Ratz to Glasgow: Zac Stubblety-Cook Named in Australian Team



The club has published its 2026–27 season program, continuing a swimming tradition that welcomes children of different ages and abilities. Its regular Friday-night activities combine racing, opportunities to improve personal times and a shared meal around the pool.



Unlike school-only sporting programs, the Water Ratz welcomes children from Prep to Year 12 regardless of which school they attend. The club operates through the Wellers Hill State School Parents and Citizens Association, with activities scheduled during Terms 4 and 1.



A place for beginners and experienced swimmers



One of the club's distinguishing features is its approach to children who are still learning to swim independently.



Younger or less confident participants can enter supported half-lap events, where a senior swimmer helps them complete the distance. These untimed swims give children an introduction to club nights without requiring them to race a full lap.



More experienced swimmers can enter timed events over 25, 50 and 100 metres, with the program changing each week. The emphasis includes improving individual times rather than simply finishing ahead of other competitors.



According to the club's published arrangements, gates open at 5:45 p.m., followed by warm-ups from 6:00 p.m. Half-lap events begin at 6:15 p.m., with the main racing program scheduled from 6:30 p.m.



Photo Credit: Andrea Freddy/Facebook



Friday nights bring families together



The swimming is only part of the Water Ratz tradition. A barbecue and canteen provide dinner and refreshments, allowing families to spend time together while children participate in their events.



The club relies on parents and community volunteers to help organise activities, including timekeeping and canteen duties. Wellers Hill State School's parent handbook identifies family involvement as an important part of maintaining the Friday-night program.



For families new to Tarragindi, the gatherings offer an opportunity to meet other parents while children develop swimming skills and friendships outside the classroom.



A local club with a long history



The Wellers Hill Amateur Swimming Club dates back to 1964, according to both the school's official information and the Water Ratz website.



Over more than six decades, its activities have extended beyond weekly club nights to include championships and interclub competitions. The club's regular season runs from Term 4 into Term 1, with championships held towards the end of the season.



Water Ratz also has a connection to Australian swimming history. Olympic gold medallist Zac Stubblety-Cook began his swimming journey at the Tarragindi club before progressing to international competition.



While his achievements have brought attention to the club, its regular program continues to cater for children across a broad range of abilities.



How local families can participate



Water Ratz offers families an opportunity to try one club night before paying the full season registration fee for timed swimming events.



Its published information lists a season fee of $80 for swimmers entering 25, 50 and 100-metre races, with sibling discounts available. Half-lap swimmers do not pay a season registration fee, although the usual $2 family gate entry applies.



Read: Emily Drummond Swimming Helps Local Families Access Affordable Lessons



Families can check the 2026–27 season program, registration requirements and weekly race nominations through the official Water Ratz website.



For Tarragindi, the club remains an example of how a school pool, dedicated volunteers and a familiar Friday-night gathering can support community sport across generations.



Published 31-Oct-2026
]]></description>
<content:encoded><![CDATA[
For generations of Tarragindi families, Friday nights at Wellers Hill State School have meant more than swimming races, with the Water Ratz club bringing children and parents together through a community tradition dating back to 1964.



Read: From Wellers Hill Water Ratz to Glasgow: Zac Stubblety-Cook Named in Australian Team



The club has published its 2026–27 season program, continuing a swimming tradition that welcomes children of different ages and abilities. Its regular Friday-night activities combine racing, opportunities to improve personal times and a shared meal around the pool.



Unlike school-only sporting programs, the Water Ratz welcomes children from Prep to Year 12 regardless of which school they attend. The club operates through the Wellers Hill State School Parents and Citizens Association, with activities scheduled during Terms 4 and 1.



A place for beginners and experienced swimmers



One of the club's distinguishing features is its approach to children who are still learning to swim independently.



Younger or less confident participants can enter supported half-lap events, where a senior swimmer helps them complete the distance. These untimed swims give children an introduction to club nights without requiring them to race a full lap.



More experienced swimmers can enter timed events over 25, 50 and 100 metres, with the program changing each week. The emphasis includes improving individual times rather than simply finishing ahead of other competitors.



According to the club's published arrangements, gates open at 5:45 p.m., followed by warm-ups from 6:00 p.m. Half-lap events begin at 6:15 p.m., with the main racing program scheduled from 6:30 p.m.



Photo Credit: Andrea Freddy/Facebook



Friday nights bring families together



The swimming is only part of the Water Ratz tradition. A barbecue and canteen provide dinner and refreshments, allowing families to spend time together while children participate in their events.



The club relies on parents and community volunteers to help organise activities, including timekeeping and canteen duties. Wellers Hill State School's parent handbook identifies family involvement as an important part of maintaining the Friday-night program.



For families new to Tarragindi, the gatherings offer an opportunity to meet other parents while children develop swimming skills and friendships outside the classroom.



A local club with a long history



The Wellers Hill Amateur Swimming Club dates back to 1964, according to both the school's official information and the Water Ratz website.



Over more than six decades, its activities have extended beyond weekly club nights to include championships and interclub competitions. The club's regular season runs from Term 4 into Term 1, with championships held towards the end of the season.



Water Ratz also has a connection to Australian swimming history. Olympic gold medallist Zac Stubblety-Cook began his swimming journey at the Tarragindi club before progressing to international competition.



While his achievements have brought attention to the club, its regular program continues to cater for children across a broad range of abilities.



How local families can participate



Water Ratz offers families an opportunity to try one club night before paying the full season registration fee for timed swimming events.



Its published information lists a season fee of $80 for swimmers entering 25, 50 and 100-metre races, with sibling discounts available. Half-lap swimmers do not pay a season registration fee, although the usual $2 family gate entry applies.



Read: Emily Drummond Swimming Helps Local Families Access Affordable Lessons



Families can check the 2026–27 season program, registration requirements and weekly race nominations through the official Water Ratz website.



For Tarragindi, the club remains an example of how a school pool, dedicated volunteers and a familiar Friday-night gathering can support community sport across generations.



Published 31-Oct-2026
]]></content:encoded>
</item><item>
<title><![CDATA[Before Tarragindi: How Sandy Creek Became a Brisbane Suburb]]></title>
<link>https://tarragindinews.com.au/tarragindi-history-sandy-creek</link>
<media:content url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Tarragindi-FI.png" medium="image"/>
<media:thumbnail url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Tarragindi-FI.png"/>
<enclosure url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Tarragindi-FI.png" length="1924926" type="image/png"/>
<pubDate>Wed, 04 Nov 2026 02:16:27 +0000</pubDate>
<category><![CDATA[Homepage Latest News]]></category>
<category><![CDATA[Andrew Clarke Memorial]]></category>
<category><![CDATA[Brisbane suburb history]]></category>
<category><![CDATA[Sandy Creek]]></category>
<category><![CDATA[tarragindi brisbane]]></category>
<category><![CDATA[Tarragindi heritage]]></category>
<category><![CDATA[Tarragindi history]]></category>
<category><![CDATA[Tarragindi Road]]></category>
<category><![CDATA[Tarragindi Tasserone]]></category>
<category><![CDATA[Toohey Mountain]]></category>
<dc:creator><![CDATA[Tarragindi News]]></dc:creator>
<guid isPermaLink="true">https://tarragindinews.com.au/?page_id=19217</guid>
<description><![CDATA[
Long before Tarragindi became a residential suburb, the district was known as Sandy Creek, a rural pocket of Brisbane where a waterway, scattered farms and a growing community shaped the streets residents know today.



The change from Sandy Creek to Tarragindi took several decades. Land sales began in the 1860s, but the district remained largely undeveloped until roads, public transport and new services encouraged residential growth in the early 20th century.



Although the name Tarragindi was formally adopted for the district in 1931, traces of its earlier identity remain in the local landscape and historical records.



A suburb that took its first name from a creek



Sandy Creek begins around the foothills of Toohey Mountain and flows north through Tarragindi towards Ekibin Creek. Its course helped define the district long before today's residential streets appeared.



Brisbane City Council's heritage records show that land in the Sandy Creek district was offered for freehold purchase by the 1860s. In December 1862, property developer Robert Davidson bought a 55-acre parcel for £49 and 10 shillings.



The land was subsequently divided and sold, although development progressed slowly. Steep terrain, bushland and limited transport connections made Sandy Creek less accessible than established parts of Brisbane.



The district remained predominantly rural for decades, with small-scale farming gradually appearing as transport connections improved.



How a man's name travelled from a house to a suburb



The name Tarragindi came from Tarragindi Tasserone, an Australian South Sea Islander originally from the Loyalty Islands, now part of New Caledonia.



Photo Credit: State Library of Queensland



According to the State Library of Queensland, historical accounts describe Tasserone being taken from his homeland and brought to Queensland during the period of Pacific Islander labour recruitment and exploitation. He reportedly escaped from a plantation and was later taken in by the Foote family.



Tasserone also worked clearing land for the Grimes family, who were establishing a home in Sandy Creek. The family reportedly adopted his name for the property, after he suggested calling it Tarragindi.



The familiar explanation that Tarragindi means camp on the hill comes from this account. However, historical research has not conclusively established the phrase as a translation from a particular Aboriginal language.



The name spread beyond the house. Tarragindi Road was recorded by 1895, while the wider district continued to be known as Sandy Creek for several more decades.



Residents began building their own community



Sandy Creek's transformation accelerated after the First World War, when residents organised to improve local facilities.



The Sandy Creek Progress Association, formed around 1919, campaigned for better access and community infrastructure. Its efforts helped bring attention to the needs of a district increasingly occupied by families rather than isolated landholders.



The Tarragindi Hill reservoir connected the district to Brisbane's expanding water supply system in the early 1920s. Bus services also reached Tarragindi Hill during the decade.



In September 1925, Andrew Avenue was officially opened and named in honour of Andrew Clarke, a local soldier believed to have been the district's only First World War fatality.



Andrew Clarke World War I MemorialPhoto Credit: BCC



The community later gained Tarragindi Memorial Hall, built near the intersection of Fernvale Road and Andrew Avenue in 1932. It provided a gathering place for a neighbourhood that had previously lacked a public hall.



From Sandy Creek to Tarragindi



By the 1920s, Tarragindi Hill was already appearing as a destination on bus services, indicating that the name had become familiar beyond the original Grimes property.



In 1931, Tarragindi was formally adopted as the district's name, replacing Sandy Creek in local usage. The suburb's residential development continued through the following decades, particularly after the Second World War.



Housing estates and new streets gradually changed the former farming district, while the surrounding hills and creek corridors remained important parts of its character.





.tarragindi-history-box{border:1px solid #d7ddd8;background:#f8faf8;border-radius:8px;padding:22px 24px;margin:28px 0;color:#26332b;font-family:inherit}
.tarragindi-history-box h3{font-size:1.4rem;line-height:1.3;margin:0 0 8px}
.tarragindi-history-box .intro{margin:0 0 18px;color:#526357}
.tarragindi-history-box ul{list-style:none;padding:0;margin:0;border-left:3px solid #477b60}
.tarragindi-history-box li{position:relative;padding:0 0 16px 20px;line-height:1.55}
.tarragindi-history-box li:last-child{padding-bottom:0}
.tarragindi-history-box li:before{content:"";position:absolute;left:-7px;top:7px;width:11px;height:11px;border-radius:50%;background:#477b60}
.tarragindi-history-box strong{color:#315f46}
.tarragindi-history-box .source{margin:16px 0 0;font-size:.85rem;color:#526357}

From Sandy Creek to Tarragindi
Key milestones in the district's transformation.

1862 — Early land sale: Robert Davidson purchases a 55-acre parcel in Sandy Creek.
1895 — Tarragindi Road: The name appears in historical property records.
Around 1919 — Community organisation: The Sandy Creek Progress Association forms.
1923 — Water supply: Tarragindi Hill reservoir opens.
1925 — Andrew Avenue: The road is opened and named for Andrew Clarke.
1931 — New district name: Tarragindi is formally adopted.
1932 — Community hall: A hall is built near Fernvale Road and Andrew Avenue.

Source: Brisbane City Council heritage records.




Where Sandy Creek's history survives



Residents can still find evidence of the district's earlier identity in places that predate its suburban expansion.



Sandy Creek continues through local parkland, while the Andrew Clarke memorial near Fernvale Road preserves a connection to the community that campaigned for better facilities a century ago.



Another surviving landmark is Onival at 55 Tarragindi Road. Built around 1919, the heritage-listed house reflects the period when Sandy Creek was beginning its transition from bushland and smallholdings to a residential neighbourhood.



Although Sandy Creek disappeared as the district's recognised name, its waterway, early houses and community landmarks remain part of Tarragindi's history.



Published 28-Oct-2026




]]></description>
<content:encoded><![CDATA[
Long before Tarragindi became a residential suburb, the district was known as Sandy Creek, a rural pocket of Brisbane where a waterway, scattered farms and a growing community shaped the streets residents know today.



The change from Sandy Creek to Tarragindi took several decades. Land sales began in the 1860s, but the district remained largely undeveloped until roads, public transport and new services encouraged residential growth in the early 20th century.



Although the name Tarragindi was formally adopted for the district in 1931, traces of its earlier identity remain in the local landscape and historical records.



A suburb that took its first name from a creek



Sandy Creek begins around the foothills of Toohey Mountain and flows north through Tarragindi towards Ekibin Creek. Its course helped define the district long before today's residential streets appeared.



Brisbane City Council's heritage records show that land in the Sandy Creek district was offered for freehold purchase by the 1860s. In December 1862, property developer Robert Davidson bought a 55-acre parcel for £49 and 10 shillings.



The land was subsequently divided and sold, although development progressed slowly. Steep terrain, bushland and limited transport connections made Sandy Creek less accessible than established parts of Brisbane.



The district remained predominantly rural for decades, with small-scale farming gradually appearing as transport connections improved.



How a man's name travelled from a house to a suburb



The name Tarragindi came from Tarragindi Tasserone, an Australian South Sea Islander originally from the Loyalty Islands, now part of New Caledonia.



Photo Credit: State Library of Queensland



According to the State Library of Queensland, historical accounts describe Tasserone being taken from his homeland and brought to Queensland during the period of Pacific Islander labour recruitment and exploitation. He reportedly escaped from a plantation and was later taken in by the Foote family.



Tasserone also worked clearing land for the Grimes family, who were establishing a home in Sandy Creek. The family reportedly adopted his name for the property, after he suggested calling it Tarragindi.



The familiar explanation that Tarragindi means camp on the hill comes from this account. However, historical research has not conclusively established the phrase as a translation from a particular Aboriginal language.



The name spread beyond the house. Tarragindi Road was recorded by 1895, while the wider district continued to be known as Sandy Creek for several more decades.



Residents began building their own community



Sandy Creek's transformation accelerated after the First World War, when residents organised to improve local facilities.



The Sandy Creek Progress Association, formed around 1919, campaigned for better access and community infrastructure. Its efforts helped bring attention to the needs of a district increasingly occupied by families rather than isolated landholders.



The Tarragindi Hill reservoir connected the district to Brisbane's expanding water supply system in the early 1920s. Bus services also reached Tarragindi Hill during the decade.



In September 1925, Andrew Avenue was officially opened and named in honour of Andrew Clarke, a local soldier believed to have been the district's only First World War fatality.



Andrew Clarke World War I MemorialPhoto Credit: BCC



The community later gained Tarragindi Memorial Hall, built near the intersection of Fernvale Road and Andrew Avenue in 1932. It provided a gathering place for a neighbourhood that had previously lacked a public hall.



From Sandy Creek to Tarragindi



By the 1920s, Tarragindi Hill was already appearing as a destination on bus services, indicating that the name had become familiar beyond the original Grimes property.



In 1931, Tarragindi was formally adopted as the district's name, replacing Sandy Creek in local usage. The suburb's residential development continued through the following decades, particularly after the Second World War.



Housing estates and new streets gradually changed the former farming district, while the surrounding hills and creek corridors remained important parts of its character.





.tarragindi-history-box{border:1px solid #d7ddd8;background:#f8faf8;border-radius:8px;padding:22px 24px;margin:28px 0;color:#26332b;font-family:inherit}
.tarragindi-history-box h3{font-size:1.4rem;line-height:1.3;margin:0 0 8px}
.tarragindi-history-box .intro{margin:0 0 18px;color:#526357}
.tarragindi-history-box ul{list-style:none;padding:0;margin:0;border-left:3px solid #477b60}
.tarragindi-history-box li{position:relative;padding:0 0 16px 20px;line-height:1.55}
.tarragindi-history-box li:last-child{padding-bottom:0}
.tarragindi-history-box li:before{content:"";position:absolute;left:-7px;top:7px;width:11px;height:11px;border-radius:50%;background:#477b60}
.tarragindi-history-box strong{color:#315f46}
.tarragindi-history-box .source{margin:16px 0 0;font-size:.85rem;color:#526357}

From Sandy Creek to Tarragindi
Key milestones in the district's transformation.

1862 — Early land sale: Robert Davidson purchases a 55-acre parcel in Sandy Creek.
1895 — Tarragindi Road: The name appears in historical property records.
Around 1919 — Community organisation: The Sandy Creek Progress Association forms.
1923 — Water supply: Tarragindi Hill reservoir opens.
1925 — Andrew Avenue: The road is opened and named for Andrew Clarke.
1931 — New district name: Tarragindi is formally adopted.
1932 — Community hall: A hall is built near Fernvale Road and Andrew Avenue.

Source: Brisbane City Council heritage records.




Where Sandy Creek's history survives



Residents can still find evidence of the district's earlier identity in places that predate its suburban expansion.



Sandy Creek continues through local parkland, while the Andrew Clarke memorial near Fernvale Road preserves a connection to the community that campaigned for better facilities a century ago.



Another surviving landmark is Onival at 55 Tarragindi Road. Built around 1919, the heritage-listed house reflects the period when Sandy Creek was beginning its transition from bushland and smallholdings to a residential neighbourhood.



Although Sandy Creek disappeared as the district's recognised name, its waterway, early houses and community landmarks remain part of Tarragindi's history.



Published 28-Oct-2026




]]></content:encoded>
</item><item>
<title><![CDATA[Brisbane Metro Expansion Survey Opens as Residents Asked About Local Transport Problems]]></title>
<link>https://tarragindinews.com.au/brisbane-metro-expansion-survey-opens-as-residents-asked-about-local-transport-problems/brisbane-metro-expansion-survey-opens-as-residents-asked-about-local-transport-problems</link>
<media:content url="https://tarragindinews.com.au/wp-content/uploads/2026/10/Brisbane-Metro-FI.png" medium="image"/>
<media:thumbnail url="https://tarragindinews.com.au/wp-content/uploads/2026/10/Brisbane-Metro-FI.png"/>
<enclosure url="https://tarragindinews.com.au/wp-content/uploads/2026/10/Brisbane-Metro-FI.png" length="1526806" type="image/png"/>
<pubDate>Wed, 28 Oct 2026 00:12:56 +0000</pubDate>
<dc:creator><![CDATA[Tarragindi News]]></dc:creator>
<guid isPermaLink="true">https://tarragindinews.com.au/brisbane-metro-expansion-survey-opens-as-residents-asked-about-local-transport-problems/</guid>
<description><![CDATA[


Brisbane residents are being invited to share their public transport concerns and suggest improvements as community consultation begins on proposed Metro expansions across the city's northern, eastern, southern and airport corridors.



Submissions close on Sunday, 13 December 2026, giving commuters an opportunity to describe difficulties with existing services and suggest improvements. Their feedback will help inform a business case examining how Brisbane Metro could reach more suburbs.



Four corridors bring different transport questions



The proposed Northern Metro would connect the CBD with Carseldine, extending services through Lutwyche, Kedron, Chermside and Aspley. Gympie Road has been identified as a potential corridor, raising questions about how dedicated bus infrastructure could improve journeys along one of Brisbane's major northern transport routes.



For residents in these suburbs, the consultation provides an opportunity to describe existing problems involving bus connections, journey reliability and access to public transport. Final station locations and the infrastructure needed for a northern extension remain undecided.



The Eastern Metro proposal would connect central Brisbane with Capalaba through the eastern suburbs, with Old Cleveland Road identified as a potential route. Commuters travelling through areas including Coorparoo could provide feedback about existing services, transfers and difficulties encountered during their journeys.



South of the city, the proposed Southern Metro would connect the CBD with Springwood, complementing the South East Busway extension and linking with the existing M1 service at Eight Mile Plains busway station.



The fourth corridor would create express Metro connections between Brisbane Airport's domestic and international terminals and the CBD. Planning will examine how those services could fit into the wider public transport network.



All four corridors remain proposals, with their potential alignments and infrastructure needs to be examined through the business case.



Photo Credit: BCC



Population growth adds pressure to existing routes



Council forecasts substantial population growth along the three residential corridors over the next 20 years.



Its projections indicate increases of 60 per cent along the CBD-to-Carseldine corridor, 29 per cent towards Capalaba and 96 per cent towards Springwood. Approximately 88,000 additional residents are expected in areas surrounding those corridors.



Brisbane's latest expansion proposals also revisit ambitions from the South East Queensland Integrated Regional Transport Plan developed in the 1990s. The earlier plan proposed approximately 75 kilometres of busways, but only about 25 kilometres were ultimately built.



Infrastructure Australia has identified the Metro expansion as an early-stage investment proposal that could improve public transport capacity, interchange connections and service reliability. Potential benefits remain subject to further planning and assessment.



Council wants to hear where journeys fall short



The consultation focuses on residents' current travel experiences and suggestions for improving bus services along the proposed corridors, rather than asking them to comment on completed designs.



Issues such as unreliable travel times, inconvenient transfers, access to stops and gaps in service coverage could be raised by residents. Council has not indicated that participants will be able to vote on final station locations or select specific route alignments.



The consultation follows the introduction of Brisbane Metro's M1 and M2 services in 2025, alongside changes to the city's wider bus network. Council is now investigating how similar high-capacity services could operate beyond the existing network.



LM Adrian Schrinner has encouraged residents to contribute to the expansion plans, arguing that the Metro model should be extended into other parts of Brisbane.



Civic Cabinet Chair for Transport Cr Andrew Wines has also sought feedback from regular passengers and people who would consider using public transport if better services were available.







Construction funding and 2032 timetable remain uncertain



Brisbane City Council is working with the Queensland and Australian governments on the Brisbane Metro Expansions Business Case, with Jacobs Group (Australia) engaged to undertake the work.



The business case will investigate possible route alignments, depot locations, network improvements, infrastructure requirements and the order in which different sections could be delivered.



The Australian Government has committed $50 million to support development of the final business case and related expansion planning. However, construction funding for the proposed corridors has not been secured, and major infrastructure works would require substantial additional investment.



Mr Schrinner has declined to guarantee that any of the proposed extensions will be completed before the Brisbane 2032 Olympic and Paralympic Games.



The distinction between long-term expansion plans and present-day transport needs has also attracted criticism. Opposition Leader Cr Jared Cassidy has called for more suburban bus services now, rather than waiting years for major infrastructure projects.



Council expects the expansion business case to be completed in late 2027. Any subsequent construction would depend on funding availability, relevant approvals and decisions about which sections should proceed.



How residents can have their say



The survey is open until Sunday, 13 December 2026. Council has also provided an option for residents to register for project updates as the business case progresses.




HAVE YOUR SAY










.bson-metro-box {
  box-sizing: border-box;
  max-width: 100%;
  padding: 20px;
  margin: 24px 0;
  border: 1px solid #d5dee8;
  border-left: 4px solid #235b87;
  border-radius: 6px;
  background: #f6f9fc;
  color: #1e293b;
  font-family: inherit;
  line-height: 1.6;
}
.bson-metro-box * { box-sizing: border-box; }
.bson-metro-box h3 {
  margin: 0 0 12px;
  font-size: 1.3rem;
  line-height: 1.35;
  color: #163c5c;
}
.bson-metro-box p { margin: 0 0 12px; }
.bson-metro-box ul {
  margin: 8px 0 16px;
  padding-left: 22px;
}
.bson-metro-box li { margin: 4px 0; }
.bson-metro-box a.bson-metro-link {
  display: inline-block;
  max-width: 100%;
  padding: 10px 15px;
  border-radius: 4px;
  background: #235b87;
  color: #fff;
  font-weight: 700;
  text-decoration: none;
  overflow-wrap: anywhere;
}
.bson-metro-box a.bson-metro-link:hover,
.bson-metro-box a.bson-metro-link:focus {
  background: #163c5c;
  color: #fff;
  text-decoration: underline;
}
.bson-metro-box .bson-metro-note {
  margin: 12px 0 0;
  font-size: .87rem;
  color: #475569;
}
@media (max-width: 480px) {
  .bson-metro-box { padding: 15px; }
  .bson-metro-box h3 { font-size: 1.15rem; }
  .bson-metro-box a.bson-metro-link {
    display: block;
    text-align: center;
  }
}



  Have Your Say on Brisbane Metro

  Survey closes:
  Sunday, 13 December 2026

  Brisbane City Council is seeking feedback
  about current travel experiences and
  potential bus network improvements.

  Proposed expansion corridors:
  
    Northern: CBD to Carseldine
    Eastern: CBD to Capalaba
    Southern: CBD to Springwood
    Airport: CBD to Brisbane Airport
  

  
    
      View Consultation and Survey
    
  

  
    The proposed corridors remain subject to
    the business case, funding and approvals.
    No final routes or construction timetable
    have been confirmed.
  





The&nbsp;online community survey&nbsp;can be accessed directly, while questions about the project can be sent to&nbsp;metroexpansions@brisbane.qld.gov.au.



Feedback gathered during the consultation will contribute to the business case, which is expected to provide more detailed information about potential routes, infrastructure requirements and delivery stages in late 2027.



Published 28-Oct-2026



Featured Image Credit: Wikipedia/Kyethepie21/CC0




]]></description>
<content:encoded><![CDATA[


Brisbane residents are being invited to share their public transport concerns and suggest improvements as community consultation begins on proposed Metro expansions across the city's northern, eastern, southern and airport corridors.



Submissions close on Sunday, 13 December 2026, giving commuters an opportunity to describe difficulties with existing services and suggest improvements. Their feedback will help inform a business case examining how Brisbane Metro could reach more suburbs.



Four corridors bring different transport questions



The proposed Northern Metro would connect the CBD with Carseldine, extending services through Lutwyche, Kedron, Chermside and Aspley. Gympie Road has been identified as a potential corridor, raising questions about how dedicated bus infrastructure could improve journeys along one of Brisbane's major northern transport routes.



For residents in these suburbs, the consultation provides an opportunity to describe existing problems involving bus connections, journey reliability and access to public transport. Final station locations and the infrastructure needed for a northern extension remain undecided.



The Eastern Metro proposal would connect central Brisbane with Capalaba through the eastern suburbs, with Old Cleveland Road identified as a potential route. Commuters travelling through areas including Coorparoo could provide feedback about existing services, transfers and difficulties encountered during their journeys.



South of the city, the proposed Southern Metro would connect the CBD with Springwood, complementing the South East Busway extension and linking with the existing M1 service at Eight Mile Plains busway station.



The fourth corridor would create express Metro connections between Brisbane Airport's domestic and international terminals and the CBD. Planning will examine how those services could fit into the wider public transport network.



All four corridors remain proposals, with their potential alignments and infrastructure needs to be examined through the business case.



Photo Credit: BCC



Population growth adds pressure to existing routes



Council forecasts substantial population growth along the three residential corridors over the next 20 years.



Its projections indicate increases of 60 per cent along the CBD-to-Carseldine corridor, 29 per cent towards Capalaba and 96 per cent towards Springwood. Approximately 88,000 additional residents are expected in areas surrounding those corridors.



Brisbane's latest expansion proposals also revisit ambitions from the South East Queensland Integrated Regional Transport Plan developed in the 1990s. The earlier plan proposed approximately 75 kilometres of busways, but only about 25 kilometres were ultimately built.



Infrastructure Australia has identified the Metro expansion as an early-stage investment proposal that could improve public transport capacity, interchange connections and service reliability. Potential benefits remain subject to further planning and assessment.



Council wants to hear where journeys fall short



The consultation focuses on residents' current travel experiences and suggestions for improving bus services along the proposed corridors, rather than asking them to comment on completed designs.



Issues such as unreliable travel times, inconvenient transfers, access to stops and gaps in service coverage could be raised by residents. Council has not indicated that participants will be able to vote on final station locations or select specific route alignments.



The consultation follows the introduction of Brisbane Metro's M1 and M2 services in 2025, alongside changes to the city's wider bus network. Council is now investigating how similar high-capacity services could operate beyond the existing network.



LM Adrian Schrinner has encouraged residents to contribute to the expansion plans, arguing that the Metro model should be extended into other parts of Brisbane.



Civic Cabinet Chair for Transport Cr Andrew Wines has also sought feedback from regular passengers and people who would consider using public transport if better services were available.







Construction funding and 2032 timetable remain uncertain



Brisbane City Council is working with the Queensland and Australian governments on the Brisbane Metro Expansions Business Case, with Jacobs Group (Australia) engaged to undertake the work.



The business case will investigate possible route alignments, depot locations, network improvements, infrastructure requirements and the order in which different sections could be delivered.



The Australian Government has committed $50 million to support development of the final business case and related expansion planning. However, construction funding for the proposed corridors has not been secured, and major infrastructure works would require substantial additional investment.



Mr Schrinner has declined to guarantee that any of the proposed extensions will be completed before the Brisbane 2032 Olympic and Paralympic Games.



The distinction between long-term expansion plans and present-day transport needs has also attracted criticism. Opposition Leader Cr Jared Cassidy has called for more suburban bus services now, rather than waiting years for major infrastructure projects.



Council expects the expansion business case to be completed in late 2027. Any subsequent construction would depend on funding availability, relevant approvals and decisions about which sections should proceed.



How residents can have their say



The survey is open until Sunday, 13 December 2026. Council has also provided an option for residents to register for project updates as the business case progresses.




HAVE YOUR SAY










.bson-metro-box {
  box-sizing: border-box;
  max-width: 100%;
  padding: 20px;
  margin: 24px 0;
  border: 1px solid #d5dee8;
  border-left: 4px solid #235b87;
  border-radius: 6px;
  background: #f6f9fc;
  color: #1e293b;
  font-family: inherit;
  line-height: 1.6;
}
.bson-metro-box * { box-sizing: border-box; }
.bson-metro-box h3 {
  margin: 0 0 12px;
  font-size: 1.3rem;
  line-height: 1.35;
  color: #163c5c;
}
.bson-metro-box p { margin: 0 0 12px; }
.bson-metro-box ul {
  margin: 8px 0 16px;
  padding-left: 22px;
}
.bson-metro-box li { margin: 4px 0; }
.bson-metro-box a.bson-metro-link {
  display: inline-block;
  max-width: 100%;
  padding: 10px 15px;
  border-radius: 4px;
  background: #235b87;
  color: #fff;
  font-weight: 700;
  text-decoration: none;
  overflow-wrap: anywhere;
}
.bson-metro-box a.bson-metro-link:hover,
.bson-metro-box a.bson-metro-link:focus {
  background: #163c5c;
  color: #fff;
  text-decoration: underline;
}
.bson-metro-box .bson-metro-note {
  margin: 12px 0 0;
  font-size: .87rem;
  color: #475569;
}
@media (max-width: 480px) {
  .bson-metro-box { padding: 15px; }
  .bson-metro-box h3 { font-size: 1.15rem; }
  .bson-metro-box a.bson-metro-link {
    display: block;
    text-align: center;
  }
}



  Have Your Say on Brisbane Metro

  Survey closes:
  Sunday, 13 December 2026

  Brisbane City Council is seeking feedback
  about current travel experiences and
  potential bus network improvements.

  Proposed expansion corridors:
  
    Northern: CBD to Carseldine
    Eastern: CBD to Capalaba
    Southern: CBD to Springwood
    Airport: CBD to Brisbane Airport
  

  
    
      View Consultation and Survey
    
  

  
    The proposed corridors remain subject to
    the business case, funding and approvals.
    No final routes or construction timetable
    have been confirmed.
  





The&nbsp;online community survey&nbsp;can be accessed directly, while questions about the project can be sent to&nbsp;metroexpansions@brisbane.qld.gov.au.



Feedback gathered during the consultation will contribute to the business case, which is expected to provide more detailed information about potential routes, infrastructure requirements and delivery stages in late 2027.



Published 28-Oct-2026



Featured Image Credit: Wikipedia/Kyethepie21/CC0




]]></content:encoded>
</item><item>
<title><![CDATA[Queensland’s Smoke Alarm Deadline Is Near — Is Your Family Really Protected?]]></title>
<link>https://tarragindinews.com.au/queensland-smoke-alarm-deadline-2027-home-safety/queensland-smoke-alarm-deadline-2027-home-safety</link>
<media:content url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Brooks-Kenmore-1.jpeg" medium="image"/>
<media:thumbnail url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Brooks-Kenmore-1.jpeg"/>
<enclosure url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Brooks-Kenmore-1.jpeg" length="298570" type="image/jpeg"/>
<pubDate>Wed, 11 Nov 2026 10:18:59 +0000</pubDate>
<dc:creator><![CDATA[Tarragindi News]]></dc:creator>
<guid isPermaLink="true">https://tarragindinews.com.au/queensland-smoke-alarm-deadline-2027-home-safety/</guid>
<description><![CDATA[




By Cathy Brand | Fire Safety Advocate and CEO of Brooks Australia



A Queensland homeowner could have several working smoke alarms throughout their property and still fall short of the state's requirements when the final stage of its smoke alarm reforms takes effect on 1 January 2027.



The changes go well beyond replacing ageing devices. They affect where alarms must be installed, how they communicate with one another and the type of technology permitted. For households that have relied on the same arrangement for years, becoming compliant may involve a more substantial upgrade than expected.



With just over two months remaining, the approaching deadline also presents an opportunity to consider whether the warning system provides everyone in the home with the best possible chance of escaping a fire.



A decade of reform reaches its final deadline



Queensland's smoke alarm reforms have been introduced progressively over the past decade, beginning with new homes and substantial renovations in 2017. Properties being sold or leased were required to meet the upgraded standards from January 2022, while the final stage, commencing on 1 January 2027, applies to the remaining domestic dwellings.




  
    .cb-history-box,
    .cb-history-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-history-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px 26px;
      background: #f5f6f7;
      border: 1px solid #d9dee2;
      border-left: 5px solid #40566a;
      border-radius: 7px;
      color: #26323b;
      font: 16px/1.65 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-history-box h3 {
      margin: 0 0 17px;
      color: #203b50;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
      hyphens: none;
    }

    .cb-history-box p {
      margin: 0 0 14px;
      line-height: 1.65;
      hyphens: none;
    }

    .cb-history-box p:last-child {
      margin-bottom: 0;
    }

    .cb-history-box strong {
      color: #203b50;
    }

    .cb-history-box a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-history-box a:hover,
    .cb-history-box a:focus {
      color: #40566a;
    }

    @media (max-width: 600px) {
      .cb-history-box {
        padding: 19px 16px;
        margin: 22px 0;
        font-size: 15px;
      }

      .cb-history-box h3 {
        font-size: 19px;
      }
    }
  

  The Slacks Creek Tragedy That Changed Queensland's Smoke Alarm Laws

  
    On 24 August 2011, a house fire at Slacks Creek,
    south of Brisbane, claimed 11 lives, including
    eight children. The disaster became
    a defining tragedy in Queensland's
    approach to residential fire safety,
    ultimately helping drive some of the country's
    most significant smoke alarm reforms.
  

  
    The coronial inquest, whose findings were
    delivered on 28 November 2014, examined
    the failure of the home's smoke alarms.
    The coroner concluded there was a reasonable
    prospect that some or all of those who died
    could have escaped had the alarms been working.
  

  
    The coroner's recommendations helped shape
    sweeping changes to Queensland's smoke alarm
    laws. Legislation passed in 2016 introduced
    a ten-year transition towards photoelectric,
    interconnected alarms installed in bedrooms,
    connecting hallways and on every storey.
  

  
    The reforms began taking effect in January 2017,
    with the final stage due on 1 January 2027.
  

  
    The changes reflect a fundamental lesson from
    the tragedy: providing an earlier warning
    throughout a home can give occupants more
    time to escape.
  




The legislation requires photoelectric smoke alarms complying with Australian Standard AS 3786:2014, without an ionisation sensor. They must be less than ten years old, operate when tested and be interconnected so that when one alarm activates, all connected alarms sound.



Placement is equally important. Alarms are required in every bedroom, in hallways connecting bedrooms to the rest of the dwelling and on each storey, with additional provisions for levels without bedrooms. A home with functioning alarms in its hallways, for example, may still need additional units inside bedrooms to satisfy the requirements.



One common misconception is that compliance necessarily involves extensive rewiring. Queensland permits compliant alarms powered by non-removable ten-year batteries in existing dwellings where appropriate, and wireless interconnection can provide an alternative to running interconnect cables throughout a property.



However, an existing hardwired smoke alarm must be replaced with another hardwired unit, with the electrical work undertaken by a licensed electrician. New homes and substantial renovations have separate hardwiring requirements. Depending on the home's existing installation, a combination of hardwired and compatible wireless interconnected alarms may also be suitable.





  
    .cb-compliance-box,
    .cb-compliance-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-compliance-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px;
      background: #fff7f8;
      border: 1px solid #e8cbd1;
      border-left: 5px solid #CF0A2C;
      border-radius: 7px;
      color: #2E2A25;
      font: 16px/1.55 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-box h3 {
      margin: 0 0 12px;
      color: #CF0A2C;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-box .cb-intro {
      margin: 0 0 19px;
      line-height: 1.6;
    }

    .cb-compliance-grid {
      display: grid;
      grid-template-columns: repeat(2, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-compliance-item {
      min-width: 0;
      padding: 14px 15px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-item strong {
      display: block;
      margin-bottom: 5px;
      color: #CF0A2C;
      font-size: 15px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-item p {
      margin: 0;
      color: #2E2A25;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-install-section {
      margin-top: 24px;
      padding-top: 19px;
      border-top: 2px solid #e8cbd1;
    }

    .cb-install-section h4 {
      margin: 0 0 8px;
      color: #CF0A2C;
      font-size: 19px;
      line-height: 1.35;
      font-weight: 700;
    }

    .cb-install-intro {
      margin: 0 0 15px;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-install-grid {
      display: grid;
      grid-template-columns: repeat(3, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-install-item {
      min-width: 0;
      padding: 14px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
    }

    .cb-install-item strong {
      display: block;
      margin-bottom: 7px;
      color: #CF0A2C;
      font-size: 15px;
      line-height: 1.4;
    }

    .cb-install-item p {
      margin: 0;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-compliance-note {
      margin: 20px 0 0;
      padding-top: 14px;
      border-top: 1px solid #e8cbd1;
      color: #403a37;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-compliance-note strong {
      color: #CF0A2C;
    }

    @media (max-width: 650px) {
      .cb-compliance-box {
        padding: 18px 15px;
        margin: 22px 0;
      }

      .cb-compliance-box h3 {
        font-size: 19px;
      }

      .cb-compliance-grid,
      .cb-install-grid {
        grid-template-columns: minmax(0, 1fr);
        gap: 9px;
      }

      .cb-compliance-item,
      .cb-install-item {
        padding: 12px 13px;
      }

      .cb-install-section h4 {
        font-size: 18px;
      }

      .cb-compliance-note {
        font-size: 13px;
      }
    }
  

  
    Queensland's 2027 Smoke Alarm Rules:
    A Homeowner's Checklist
  

  
    By 1 January 2027, all remaining private homes,
    townhouses and units in Queensland must comply
    with the state's upgraded smoke alarm requirements.
  

  

    
      Alarm type
      
        Required alarms must be photoelectric,
        comply with AS 3786:2014 and contain
        no ionisation sensor.
      
    

    
      Age
      
        Alarms must be less than ten years old
        from their manufacture date.
      
    

    
      Interconnection
      
        All required alarms must be interconnected
        so that when one activates, they all sound.
      
    

    
      Bedrooms
      
        An alarm must be installed in every bedroom.
      
    

    
      Hallways
      
        Alarms must be installed in hallways connecting
        bedrooms to the rest of the dwelling. Where
        there is no hallway, an alarm must be installed
        between the bedrooms and other parts
        of the storey.
      
    

    
      Every storey
      
        Each level requires appropriate coverage.
        On storeys without bedrooms, an alarm must
        be installed in the most likely path of
        travel to an exit.
      
    

    
      Power source
      
        Alarms must be hardwired or use a
        non-removable ten-year battery, as permitted
        for the property. New homes and substantial
        renovations require hardwired alarms.
      
    

    
      Hardwired replacements
      
        Existing 240V hardwired smoke alarms must
        be replaced with compliant hardwired
        photoelectric alarms, not battery-only models.
        A licensed electrician must carry out
        the electrical replacement.
      
    

    
      Operation
      
        All alarms must work when tested.
      
    

  

  

    Who Can Install Your Smoke Alarms?

    
      Queensland law does not require every smoke
      alarm to be installed by an electrician.
      The requirements depend on the alarm's
      power source and whether electrical work
      is involved.
    

    

      
        1. New hardwired alarms
        
          A licensed electrician is required
          to install 240V hardwired smoke alarms.
          This includes electrical wiring and
          connections to mains power.
        
      

      
        2. Battery-powered alarms
        
          Homeowners can generally install compliant
          photoelectric alarms powered by non-removable
          ten-year batteries themselves, provided
          no electrical work is required. All alarms
          must be correctly positioned and interconnected
          in accordance with Queensland's prescribed
          placement distances and installation requirements.
        
      

      
        3. Replacing hardwired alarms
        
          Existing 240V hardwired smoke alarms
          must be replaced with compliant
          hardwired photoelectric alarms,
          not battery-only models.
          A licensed electrician must carry
          out the electrical replacement.
        
      

    

  

  
    Important:
    Smoke alarm placement and power-source requirements
    depend on the dwelling's layout and existing
    installation. Consult the
    
      Queensland Fire Department's official guidance
    
    or a suitably qualified installer if uncertain.
  






A fire doesn't wait for smoke to reach your bedroom



A fire may begin in a part of the house far removed from where occupants are sleeping. In a conventional arrangement of independent alarms, someone at the opposite end of the property may not receive a warning until smoke reaches an alarm closer to their bedroom.



Interconnected alarms address that delay by activating throughout the home when any one of the connected devices detects smoke.



The practical importance becomes particularly clear in larger houses, multi-storey properties and homes where bedroom doors are kept closed overnight. A fire starting in one sleeping area can trigger alarms elsewhere, alerting other occupants who may be able to assist.



In my own home, our bedroom is at one end of the house and our children's bedrooms are at the other. They sleep with their doors closed, as many children do. If a fire were to start in one of their rooms, I would want to know immediately, rather than wait for smoke to reach an alarm closer to where we sleep.



That is why interconnection matters. We want the warning travelling through the house faster than the smoke, giving everyone the earliest possible opportunity to respond.



The last-minute rush Queenslanders could do without



Despite years of public information campaigns, awareness of the legislation has not necessarily translated into completed installations.



The Queensland Fire Department's 2025 Community Insights Survey found that 72 per cent of respondents were aware of the interconnected smoke alarm legislation, but only 54 per cent knew about the 1 January 2027 deadline. At the time of the survey, 52 per cent reported having interconnected alarms installed.



These figures reflect what respondents reported rather than independently verified compliance, but they indicate that a substantial number of Queensland households may still need to review their arrangements.



A concentrated rush in the final weeks could also place pressure on product availability and electrician appointments. While shortages are not inevitable, households that act earlier have more time to understand their options, obtain advice and arrange any necessary installation work.



An initial assessment need not be complicated. Homeowners can begin by checking the location and manufacture date of their existing alarms, confirming whether they are photoelectric and interconnected, and testing that they operate correctly. They should also establish whether every required sleeping area and storey has appropriate coverage.



For households with existing hardwired systems, advice from a licensed electrician can help determine what needs replacing and how additional alarms can be incorporated.



A compliant home isn't necessarily a safer home for everyone



Queensland's legislation establishes a minimum standard for residential smoke alarm protection, but the circumstances of the people living in each home can be just as important as the building itself.



An audible warning, for example, may not be sufficient for someone who is deaf or hard of hearing, while a person with limited mobility may require additional time or assistance to evacuate. These considerations do not change the legal requirements, but they can influence whether a household needs supplementary warning equipment or other safety arrangements.



Families should also develop and practise an escape plan that accounts for the needs of everyone living in the home, including children, older residents and people who may require assistance. Installing compliant alarms is important, but knowing how to respond when they sound is another essential part of household fire safety.



Homeowners who have yet to complete their upgrades should begin by reviewing their existing alarms, checking the requirements for their property and arranging professional advice where needed. Leaving the work until the final weeks of December may unnecessarily limit their options.



Queensland's smoke alarm reforms were introduced to improve the warning people receive when fire breaks out at home. Meeting the requirements before 1 January 2027 is an important step, but the greater responsibility is ensuring that everyone in the household knows what to do when those alarms sound.




  
    .cb-author-box,
    .cb-author-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-author-box {
      width: 100%;
      max-width: 100%;
      margin: 30px 0;
      padding: 23px;
      background: #f7f8f9;
      border: 1px solid #dce1e5;
      border-radius: 7px;
      color: #283740;
      font: 15px/1.6 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      hyphens: none;
    }

    .cb-author-main {
      display: grid;
      grid-template-columns: 145px minmax(0, 1fr);
      gap: 22px;
      align-items: start;
    }

    .cb-author-photo {
      width: 145px;
      max-width: 100%;
      height: auto;
      display: block;
      border-radius: 5px;
      object-fit: contain;
    }

    .cb-author-copy h3 {
      margin: 0 0 10px;
      color: #203b50;
      font-size: 21px;
      line-height: 1.3;
      font-weight: 700;
    }

    .cb-author-copy p {
      margin: 0;
      line-height: 1.65;
    }

    .cb-author-copy a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-author-copy a:hover,
    .cb-author-copy a:focus {
      color: #40566a;
    }

    .cb-author-box .cb-series-note {
      margin: 19px 0 0;
      padding: 13px 0 0;
      border-top: 1px solid #dce1e5;
      color: #586670;
      font-size: 13px;
      line-height: 1.6;
      font-style: italic;
    }

    @media (max-width: 600px) {
      .cb-author-box {
        padding: 19px 16px;
        margin: 24px 0;
      }

      .cb-author-main {
        grid-template-columns: minmax(0, 1fr);
        gap: 15px;
      }

      .cb-author-photo {
        width: 150px;
        max-width: 65%;
        height: auto;
        margin: 0 auto;
      }

      .cb-author-copy h3 {
        font-size: 20px;
      }
    }
  

  

    
      
    

    
      About Cathy Brand

      
        Cathy Brand is the Chief
        Executive Officer of
        Brooks Australia,
        a provider of fire detection and warning
        technology. Through her work in the fire
        safety industry, she advocates for greater
        awareness of residential fire protection,
        interconnected smoke alarm systems and
        solutions that consider the needs of
        different households.
      
    

  

  
    Home Fire Safety with Cathy Brand is a five-part
    sponsored editorial series presented in
    partnership with Brooks Australia.
  




Published 27-October-2026




]]></description>
<content:encoded><![CDATA[




By Cathy Brand | Fire Safety Advocate and CEO of Brooks Australia



A Queensland homeowner could have several working smoke alarms throughout their property and still fall short of the state's requirements when the final stage of its smoke alarm reforms takes effect on 1 January 2027.



The changes go well beyond replacing ageing devices. They affect where alarms must be installed, how they communicate with one another and the type of technology permitted. For households that have relied on the same arrangement for years, becoming compliant may involve a more substantial upgrade than expected.



With just over two months remaining, the approaching deadline also presents an opportunity to consider whether the warning system provides everyone in the home with the best possible chance of escaping a fire.



A decade of reform reaches its final deadline



Queensland's smoke alarm reforms have been introduced progressively over the past decade, beginning with new homes and substantial renovations in 2017. Properties being sold or leased were required to meet the upgraded standards from January 2022, while the final stage, commencing on 1 January 2027, applies to the remaining domestic dwellings.




  
    .cb-history-box,
    .cb-history-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-history-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px 26px;
      background: #f5f6f7;
      border: 1px solid #d9dee2;
      border-left: 5px solid #40566a;
      border-radius: 7px;
      color: #26323b;
      font: 16px/1.65 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-history-box h3 {
      margin: 0 0 17px;
      color: #203b50;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
      hyphens: none;
    }

    .cb-history-box p {
      margin: 0 0 14px;
      line-height: 1.65;
      hyphens: none;
    }

    .cb-history-box p:last-child {
      margin-bottom: 0;
    }

    .cb-history-box strong {
      color: #203b50;
    }

    .cb-history-box a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-history-box a:hover,
    .cb-history-box a:focus {
      color: #40566a;
    }

    @media (max-width: 600px) {
      .cb-history-box {
        padding: 19px 16px;
        margin: 22px 0;
        font-size: 15px;
      }

      .cb-history-box h3 {
        font-size: 19px;
      }
    }
  

  The Slacks Creek Tragedy That Changed Queensland's Smoke Alarm Laws

  
    On 24 August 2011, a house fire at Slacks Creek,
    south of Brisbane, claimed 11 lives, including
    eight children. The disaster became
    a defining tragedy in Queensland's
    approach to residential fire safety,
    ultimately helping drive some of the country's
    most significant smoke alarm reforms.
  

  
    The coronial inquest, whose findings were
    delivered on 28 November 2014, examined
    the failure of the home's smoke alarms.
    The coroner concluded there was a reasonable
    prospect that some or all of those who died
    could have escaped had the alarms been working.
  

  
    The coroner's recommendations helped shape
    sweeping changes to Queensland's smoke alarm
    laws. Legislation passed in 2016 introduced
    a ten-year transition towards photoelectric,
    interconnected alarms installed in bedrooms,
    connecting hallways and on every storey.
  

  
    The reforms began taking effect in January 2017,
    with the final stage due on 1 January 2027.
  

  
    The changes reflect a fundamental lesson from
    the tragedy: providing an earlier warning
    throughout a home can give occupants more
    time to escape.
  




The legislation requires photoelectric smoke alarms complying with Australian Standard AS 3786:2014, without an ionisation sensor. They must be less than ten years old, operate when tested and be interconnected so that when one alarm activates, all connected alarms sound.



Placement is equally important. Alarms are required in every bedroom, in hallways connecting bedrooms to the rest of the dwelling and on each storey, with additional provisions for levels without bedrooms. A home with functioning alarms in its hallways, for example, may still need additional units inside bedrooms to satisfy the requirements.



One common misconception is that compliance necessarily involves extensive rewiring. Queensland permits compliant alarms powered by non-removable ten-year batteries in existing dwellings where appropriate, and wireless interconnection can provide an alternative to running interconnect cables throughout a property.



However, an existing hardwired smoke alarm must be replaced with another hardwired unit, with the electrical work undertaken by a licensed electrician. New homes and substantial renovations have separate hardwiring requirements. Depending on the home's existing installation, a combination of hardwired and compatible wireless interconnected alarms may also be suitable.





  
    .cb-compliance-box,
    .cb-compliance-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-compliance-box {
      width: 100%;
      max-width: 100%;
      margin: 28px 0;
      padding: 24px;
      background: #fff7f8;
      border: 1px solid #e8cbd1;
      border-left: 5px solid #CF0A2C;
      border-radius: 7px;
      color: #2E2A25;
      font: 16px/1.55 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-box h3 {
      margin: 0 0 12px;
      color: #CF0A2C;
      font-size: 22px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-box .cb-intro {
      margin: 0 0 19px;
      line-height: 1.6;
    }

    .cb-compliance-grid {
      display: grid;
      grid-template-columns: repeat(2, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-compliance-item {
      min-width: 0;
      padding: 14px 15px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
      overflow-wrap: break-word;
      word-break: normal;
      hyphens: none;
    }

    .cb-compliance-item strong {
      display: block;
      margin-bottom: 5px;
      color: #CF0A2C;
      font-size: 15px;
      font-weight: 700;
      line-height: 1.35;
    }

    .cb-compliance-item p {
      margin: 0;
      color: #2E2A25;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-install-section {
      margin-top: 24px;
      padding-top: 19px;
      border-top: 2px solid #e8cbd1;
    }

    .cb-install-section h4 {
      margin: 0 0 8px;
      color: #CF0A2C;
      font-size: 19px;
      line-height: 1.35;
      font-weight: 700;
    }

    .cb-install-intro {
      margin: 0 0 15px;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-install-grid {
      display: grid;
      grid-template-columns: repeat(3, minmax(0, 1fr));
      gap: 11px;
    }

    .cb-install-item {
      min-width: 0;
      padding: 14px;
      background: #ffffff;
      border: 1px solid #ecd9dd;
      border-radius: 5px;
    }

    .cb-install-item strong {
      display: block;
      margin-bottom: 7px;
      color: #CF0A2C;
      font-size: 15px;
      line-height: 1.4;
    }

    .cb-install-item p {
      margin: 0;
      font-size: 14px;
      line-height: 1.55;
    }

    .cb-compliance-note {
      margin: 20px 0 0;
      padding-top: 14px;
      border-top: 1px solid #e8cbd1;
      color: #403a37;
      font-size: 14px;
      line-height: 1.6;
    }

    .cb-compliance-note strong {
      color: #CF0A2C;
    }

    @media (max-width: 650px) {
      .cb-compliance-box {
        padding: 18px 15px;
        margin: 22px 0;
      }

      .cb-compliance-box h3 {
        font-size: 19px;
      }

      .cb-compliance-grid,
      .cb-install-grid {
        grid-template-columns: minmax(0, 1fr);
        gap: 9px;
      }

      .cb-compliance-item,
      .cb-install-item {
        padding: 12px 13px;
      }

      .cb-install-section h4 {
        font-size: 18px;
      }

      .cb-compliance-note {
        font-size: 13px;
      }
    }
  

  
    Queensland's 2027 Smoke Alarm Rules:
    A Homeowner's Checklist
  

  
    By 1 January 2027, all remaining private homes,
    townhouses and units in Queensland must comply
    with the state's upgraded smoke alarm requirements.
  

  

    
      Alarm type
      
        Required alarms must be photoelectric,
        comply with AS 3786:2014 and contain
        no ionisation sensor.
      
    

    
      Age
      
        Alarms must be less than ten years old
        from their manufacture date.
      
    

    
      Interconnection
      
        All required alarms must be interconnected
        so that when one activates, they all sound.
      
    

    
      Bedrooms
      
        An alarm must be installed in every bedroom.
      
    

    
      Hallways
      
        Alarms must be installed in hallways connecting
        bedrooms to the rest of the dwelling. Where
        there is no hallway, an alarm must be installed
        between the bedrooms and other parts
        of the storey.
      
    

    
      Every storey
      
        Each level requires appropriate coverage.
        On storeys without bedrooms, an alarm must
        be installed in the most likely path of
        travel to an exit.
      
    

    
      Power source
      
        Alarms must be hardwired or use a
        non-removable ten-year battery, as permitted
        for the property. New homes and substantial
        renovations require hardwired alarms.
      
    

    
      Hardwired replacements
      
        Existing 240V hardwired smoke alarms must
        be replaced with compliant hardwired
        photoelectric alarms, not battery-only models.
        A licensed electrician must carry out
        the electrical replacement.
      
    

    
      Operation
      
        All alarms must work when tested.
      
    

  

  

    Who Can Install Your Smoke Alarms?

    
      Queensland law does not require every smoke
      alarm to be installed by an electrician.
      The requirements depend on the alarm's
      power source and whether electrical work
      is involved.
    

    

      
        1. New hardwired alarms
        
          A licensed electrician is required
          to install 240V hardwired smoke alarms.
          This includes electrical wiring and
          connections to mains power.
        
      

      
        2. Battery-powered alarms
        
          Homeowners can generally install compliant
          photoelectric alarms powered by non-removable
          ten-year batteries themselves, provided
          no electrical work is required. All alarms
          must be correctly positioned and interconnected
          in accordance with Queensland's prescribed
          placement distances and installation requirements.
        
      

      
        3. Replacing hardwired alarms
        
          Existing 240V hardwired smoke alarms
          must be replaced with compliant
          hardwired photoelectric alarms,
          not battery-only models.
          A licensed electrician must carry
          out the electrical replacement.
        
      

    

  

  
    Important:
    Smoke alarm placement and power-source requirements
    depend on the dwelling's layout and existing
    installation. Consult the
    
      Queensland Fire Department's official guidance
    
    or a suitably qualified installer if uncertain.
  






A fire doesn't wait for smoke to reach your bedroom



A fire may begin in a part of the house far removed from where occupants are sleeping. In a conventional arrangement of independent alarms, someone at the opposite end of the property may not receive a warning until smoke reaches an alarm closer to their bedroom.



Interconnected alarms address that delay by activating throughout the home when any one of the connected devices detects smoke.



The practical importance becomes particularly clear in larger houses, multi-storey properties and homes where bedroom doors are kept closed overnight. A fire starting in one sleeping area can trigger alarms elsewhere, alerting other occupants who may be able to assist.



In my own home, our bedroom is at one end of the house and our children's bedrooms are at the other. They sleep with their doors closed, as many children do. If a fire were to start in one of their rooms, I would want to know immediately, rather than wait for smoke to reach an alarm closer to where we sleep.



That is why interconnection matters. We want the warning travelling through the house faster than the smoke, giving everyone the earliest possible opportunity to respond.



The last-minute rush Queenslanders could do without



Despite years of public information campaigns, awareness of the legislation has not necessarily translated into completed installations.



The Queensland Fire Department's 2025 Community Insights Survey found that 72 per cent of respondents were aware of the interconnected smoke alarm legislation, but only 54 per cent knew about the 1 January 2027 deadline. At the time of the survey, 52 per cent reported having interconnected alarms installed.



These figures reflect what respondents reported rather than independently verified compliance, but they indicate that a substantial number of Queensland households may still need to review their arrangements.



A concentrated rush in the final weeks could also place pressure on product availability and electrician appointments. While shortages are not inevitable, households that act earlier have more time to understand their options, obtain advice and arrange any necessary installation work.



An initial assessment need not be complicated. Homeowners can begin by checking the location and manufacture date of their existing alarms, confirming whether they are photoelectric and interconnected, and testing that they operate correctly. They should also establish whether every required sleeping area and storey has appropriate coverage.



For households with existing hardwired systems, advice from a licensed electrician can help determine what needs replacing and how additional alarms can be incorporated.



A compliant home isn't necessarily a safer home for everyone



Queensland's legislation establishes a minimum standard for residential smoke alarm protection, but the circumstances of the people living in each home can be just as important as the building itself.



An audible warning, for example, may not be sufficient for someone who is deaf or hard of hearing, while a person with limited mobility may require additional time or assistance to evacuate. These considerations do not change the legal requirements, but they can influence whether a household needs supplementary warning equipment or other safety arrangements.



Families should also develop and practise an escape plan that accounts for the needs of everyone living in the home, including children, older residents and people who may require assistance. Installing compliant alarms is important, but knowing how to respond when they sound is another essential part of household fire safety.



Homeowners who have yet to complete their upgrades should begin by reviewing their existing alarms, checking the requirements for their property and arranging professional advice where needed. Leaving the work until the final weeks of December may unnecessarily limit their options.



Queensland's smoke alarm reforms were introduced to improve the warning people receive when fire breaks out at home. Meeting the requirements before 1 January 2027 is an important step, but the greater responsibility is ensuring that everyone in the household knows what to do when those alarms sound.




  
    .cb-author-box,
    .cb-author-box * {
      box-sizing: border-box;
      min-width: 0;
    }

    .cb-author-box {
      width: 100%;
      max-width: 100%;
      margin: 30px 0;
      padding: 23px;
      background: #f7f8f9;
      border: 1px solid #dce1e5;
      border-radius: 7px;
      color: #283740;
      font: 15px/1.6 Arial, Helvetica, sans-serif;
      overflow-wrap: break-word;
      hyphens: none;
    }

    .cb-author-main {
      display: grid;
      grid-template-columns: 145px minmax(0, 1fr);
      gap: 22px;
      align-items: start;
    }

    .cb-author-photo {
      width: 145px;
      max-width: 100%;
      height: auto;
      display: block;
      border-radius: 5px;
      object-fit: contain;
    }

    .cb-author-copy h3 {
      margin: 0 0 10px;
      color: #203b50;
      font-size: 21px;
      line-height: 1.3;
      font-weight: 700;
    }

    .cb-author-copy p {
      margin: 0;
      line-height: 1.65;
    }

    .cb-author-copy a {
      color: #203b50;
      text-decoration: underline;
      text-underline-offset: 2px;
    }

    .cb-author-copy a:hover,
    .cb-author-copy a:focus {
      color: #40566a;
    }

    .cb-author-box .cb-series-note {
      margin: 19px 0 0;
      padding: 13px 0 0;
      border-top: 1px solid #dce1e5;
      color: #586670;
      font-size: 13px;
      line-height: 1.6;
      font-style: italic;
    }

    @media (max-width: 600px) {
      .cb-author-box {
        padding: 19px 16px;
        margin: 24px 0;
      }

      .cb-author-main {
        grid-template-columns: minmax(0, 1fr);
        gap: 15px;
      }

      .cb-author-photo {
        width: 150px;
        max-width: 65%;
        height: auto;
        margin: 0 auto;
      }

      .cb-author-copy h3 {
        font-size: 20px;
      }
    }
  

  

    
      
    

    
      About Cathy Brand

      
        Cathy Brand is the Chief
        Executive Officer of
        Brooks Australia,
        a provider of fire detection and warning
        technology. Through her work in the fire
        safety industry, she advocates for greater
        awareness of residential fire protection,
        interconnected smoke alarm systems and
        solutions that consider the needs of
        different households.
      
    

  

  
    Home Fire Safety with Cathy Brand is a five-part
    sponsored editorial series presented in
    partnership with Brooks Australia.
  




Published 27-October-2026




]]></content:encoded>
</item><item>
<title><![CDATA[Brisbane Dawn Economy Consultation Opens as City Plans for Early Risers]]></title>
<link>https://tarragindinews.com.au/brisbane-dawn-economy-plan-2026/brisbane-dawn-economy-plan-2026</link>
<media:content url="https://tarragindinews.com.au/wp-content/uploads/2026/10/Brisbane-Dawn-Economy-FI.png" medium="image"/>
<media:thumbnail url="https://tarragindinews.com.au/wp-content/uploads/2026/10/Brisbane-Dawn-Economy-FI.png"/>
<enclosure url="https://tarragindinews.com.au/wp-content/uploads/2026/10/Brisbane-Dawn-Economy-FI.png" length="1624527" type="image/png"/>
<pubDate>Wed, 28 Oct 2026 01:47:56 +0000</pubDate>
<dc:creator><![CDATA[Tarragindi News]]></dc:creator>
<guid isPermaLink="true">https://tarragindinews.com.au/brisbane-dawn-economy-plan-2026/</guid>
<description><![CDATA[


Brisbane's early-morning routines could receive greater attention under a new citywide plan examining improvements to public facilities, walking and cycling routes, transport connections and opportunities for businesses trading before sunrise.



Brisbane City Council opened&nbsp;public consultation&nbsp;on 20 October 2026, inviting residents to share how they use the city between 4:00 a.m. and 7:00 a.m. The five-minute survey closes at 11:59 p.m. on Sunday, 22 November 2026, with responses intended to guide future planning and investment.




HAVE YOUR SAY




Better lighting, paths and public facilities under consideration



The proposed&nbsp;Dawn Economy Plan&nbsp;considers improved lighting along walking and running routes, more drinking fountains and public toilets, additional shade and seating in parks, and better connections between pedestrian and cycling paths.



Residents are being asked where they go, what activities they undertake and which improvements would make Brisbane easier to navigate in the early hours. Public transport connections and opportunities for early-trading businesses are also part of the consultation.



No suburb-specific upgrades have been approved through the plan. Council will use community feedback to help establish priorities, while businesses and precinct representatives will be consulted about opportunities to support morning activity.



Brisbane's early trading leads other capitals



Research by Ingenium&nbsp;found that one in eight Brisbane food and drink venues was trading at 5:00 a.m., compared with one in 25 in Sydney and one in 33 in Melbourne and Perth.



Further analysis by researcher Dr Anna Edwards found that approximately one-third of Brisbane's food and drink businesses were operating between 6:00 a.m. and 7:00 a.m., with around half open by 8:00 a.m.



Dr Edwards identified Brisbane's established early-trading patterns as an economic advantage, supported by the city's outdoor lifestyle and demand for morning hospitality and recreation.



Council has also highlighted Brisbane's 19 Saturday parkruns, which attract thousands of runners, walkers and volunteers, as evidence of the city's established appetite for early outdoor activity.



Lord Mayor Adrian Schrinner said the consultation would help identify practical improvements for residents who already use Brisbane's parks, pathways, pools and hospitality venues before the conventional working day begins.



Five precinct connections proposed across Brisbane



The&nbsp;Committee for Brisbane's Dawn Economy Position Paper, released on 18 October, examines economic activity between 5:00 a.m. and 9:00 a.m. and proposes stronger connections between major recreation, cultural, education and business precincts.



Its recommendations identify five potential corridors spanning the Brisbane River, education and research centres, recreation areas, cultural destinations and sporting facilities.



The proposed connections include South Bank and Kangaroo Point along the river, Mt Coot-tha and Victoria Park through the recreation corridor, and Fortitude Valley, New Farm and West End through the cultural corridor. No construction commitments have been announced for these recommendations.





  Five Proposed Dawn Economy Connections Across Brisbane

  
    The Committee for Brisbane has identified five potential
    connections between major activity precincts.
  

  
    River corridor
    Howard Smith Wharves, CBD, Botanic Gardens,
    South Bank and Kangaroo Point.
  

  
    Knowledge corridor
    Herston, Kelvin Grove, Roma Street, CBD,
    Gardens Point and Boggo Road.
  

  
    Recreation corridor
    Mt Coot-tha, Victoria Park, Spring Hill,
    CBD and Kangaroo Point.
  

  
    Cultural corridor
    Fortitude Valley, New Farm, Howard Smith Wharves,
    Queensland Cultural Centre and West End.
  

  
    Sports corridor
    Ballymore, Victoria Park, RNA Showgrounds,
    Woolloongabba and Queensland Tennis Centre.
  

  
    Planning status:
    These connections are recommendations, not approved
    or funded construction projects.
  

  
    Source:
    
      Committee for Brisbane, Dawn Economy Position Paper
    , October 2026, page 13.
  



.bson-dawn-box {
  background: #f3f7fb;
  border: 1px solid #d5e1ed;
  border-left: 5px solid #23608c;
  border-radius: 6px;
  padding: 24px;
  margin: 28px 0;
  color: #263746;
  font-family: inherit;
  line-height: 1.65;
}

.bson-dawn-box h3 {
  font-size: 21px;
  line-height: 1.35;
  color: #183b56;
  margin: 0 0 12px;
  font-weight: 700;
}

.bson-dawn-intro {
  margin: 0 0 18px;
  font-size: 15px;
}

.bson-dawn-item {
  border-top: 1px solid #d5e1ed;
  padding: 13px 0;
}

.bson-dawn-item h4 {
  font-size: 16px;
  font-weight: 700;
  color: #205c83;
  margin: 0 0 4px;
}

.bson-dawn-item p {
  margin: 0;
  font-size: 15px;
}

.bson-dawn-box .bson-dawn-note {
  background: #e5eef6;
  border-radius: 4px;
  padding: 12px 14px;
  margin: 16px 0 12px;
  font-size: 13px;
}

.bson-dawn-source {
  font-size: 12px;
  color: #586a79;
  margin: 0;
}

.bson-dawn-source a {
  color: #205c83;
  text-decoration: underline;
}

@media (max-width: 600px) {
  .bson-dawn-box {
    padding: 18px;
  }

  .bson-dawn-box h3 {
    font-size: 19px;
  }

  .bson-dawn-item p,
  .bson-dawn-intro {
    font-size: 14px;
  }
}





The Committee also advocates a coordinated 24-hour economy strategy, opportunities in wellness tourism and greater use of Brisbane's outdoor lifestyle as the city prepares for the 2032 Olympic and Paralympic Games.



Committee for Brisbane chief executive Jen Williams has identified early-morning activity as an opportunity to strengthen the city's economy alongside its established night-time hospitality and entertainment sectors.



Queensland's&nbsp;draft State Planning Policy&nbsp;also recognises dawn and night-time economic activity as considerations in land-use planning. Public consultation on the draft closed on 26 October, with the final policy yet to be settled.



Existing recreation investment and transport priorities



Brisbane City Council has separately announced a $5.6 million investment in&nbsp;Move Well Brisbane, expanding its existing Active and Healthy programme. Council says the initiative will deliver 20,000 free and low-cost activity sessions over two years and involve approximately 400 local businesses.



Activities will be available across mornings, evenings and weekends, including fitness, nutrition and wellbeing programmes. Funding for Move Well Brisbane is separate from any future infrastructure commitments arising from the Dawn Economy Plan.



Council Opposition Leader Jared Cassidy criticised the survey as unnecessary, arguing that council should prioritise earlier public transport services and improved lighting in parks and along bikeways, particularly during winter mornings.



The Dawn Economy Plan remains in development, with no confirmed list of suburb-specific upgrades, construction timetable or dedicated infrastructure budget. Feedback from residents, businesses and precinct representatives will help inform the council's next steps.



Published 27-Oct-2026Featured Image Credit: Committee for Brisbane




]]></description>
<content:encoded><![CDATA[


Brisbane's early-morning routines could receive greater attention under a new citywide plan examining improvements to public facilities, walking and cycling routes, transport connections and opportunities for businesses trading before sunrise.



Brisbane City Council opened&nbsp;public consultation&nbsp;on 20 October 2026, inviting residents to share how they use the city between 4:00 a.m. and 7:00 a.m. The five-minute survey closes at 11:59 p.m. on Sunday, 22 November 2026, with responses intended to guide future planning and investment.




HAVE YOUR SAY




Better lighting, paths and public facilities under consideration



The proposed&nbsp;Dawn Economy Plan&nbsp;considers improved lighting along walking and running routes, more drinking fountains and public toilets, additional shade and seating in parks, and better connections between pedestrian and cycling paths.



Residents are being asked where they go, what activities they undertake and which improvements would make Brisbane easier to navigate in the early hours. Public transport connections and opportunities for early-trading businesses are also part of the consultation.



No suburb-specific upgrades have been approved through the plan. Council will use community feedback to help establish priorities, while businesses and precinct representatives will be consulted about opportunities to support morning activity.



Brisbane's early trading leads other capitals



Research by Ingenium&nbsp;found that one in eight Brisbane food and drink venues was trading at 5:00 a.m., compared with one in 25 in Sydney and one in 33 in Melbourne and Perth.



Further analysis by researcher Dr Anna Edwards found that approximately one-third of Brisbane's food and drink businesses were operating between 6:00 a.m. and 7:00 a.m., with around half open by 8:00 a.m.



Dr Edwards identified Brisbane's established early-trading patterns as an economic advantage, supported by the city's outdoor lifestyle and demand for morning hospitality and recreation.



Council has also highlighted Brisbane's 19 Saturday parkruns, which attract thousands of runners, walkers and volunteers, as evidence of the city's established appetite for early outdoor activity.



Lord Mayor Adrian Schrinner said the consultation would help identify practical improvements for residents who already use Brisbane's parks, pathways, pools and hospitality venues before the conventional working day begins.



Five precinct connections proposed across Brisbane



The&nbsp;Committee for Brisbane's Dawn Economy Position Paper, released on 18 October, examines economic activity between 5:00 a.m. and 9:00 a.m. and proposes stronger connections between major recreation, cultural, education and business precincts.



Its recommendations identify five potential corridors spanning the Brisbane River, education and research centres, recreation areas, cultural destinations and sporting facilities.



The proposed connections include South Bank and Kangaroo Point along the river, Mt Coot-tha and Victoria Park through the recreation corridor, and Fortitude Valley, New Farm and West End through the cultural corridor. No construction commitments have been announced for these recommendations.





  Five Proposed Dawn Economy Connections Across Brisbane

  
    The Committee for Brisbane has identified five potential
    connections between major activity precincts.
  

  
    River corridor
    Howard Smith Wharves, CBD, Botanic Gardens,
    South Bank and Kangaroo Point.
  

  
    Knowledge corridor
    Herston, Kelvin Grove, Roma Street, CBD,
    Gardens Point and Boggo Road.
  

  
    Recreation corridor
    Mt Coot-tha, Victoria Park, Spring Hill,
    CBD and Kangaroo Point.
  

  
    Cultural corridor
    Fortitude Valley, New Farm, Howard Smith Wharves,
    Queensland Cultural Centre and West End.
  

  
    Sports corridor
    Ballymore, Victoria Park, RNA Showgrounds,
    Woolloongabba and Queensland Tennis Centre.
  

  
    Planning status:
    These connections are recommendations, not approved
    or funded construction projects.
  

  
    Source:
    
      Committee for Brisbane, Dawn Economy Position Paper
    , October 2026, page 13.
  



.bson-dawn-box {
  background: #f3f7fb;
  border: 1px solid #d5e1ed;
  border-left: 5px solid #23608c;
  border-radius: 6px;
  padding: 24px;
  margin: 28px 0;
  color: #263746;
  font-family: inherit;
  line-height: 1.65;
}

.bson-dawn-box h3 {
  font-size: 21px;
  line-height: 1.35;
  color: #183b56;
  margin: 0 0 12px;
  font-weight: 700;
}

.bson-dawn-intro {
  margin: 0 0 18px;
  font-size: 15px;
}

.bson-dawn-item {
  border-top: 1px solid #d5e1ed;
  padding: 13px 0;
}

.bson-dawn-item h4 {
  font-size: 16px;
  font-weight: 700;
  color: #205c83;
  margin: 0 0 4px;
}

.bson-dawn-item p {
  margin: 0;
  font-size: 15px;
}

.bson-dawn-box .bson-dawn-note {
  background: #e5eef6;
  border-radius: 4px;
  padding: 12px 14px;
  margin: 16px 0 12px;
  font-size: 13px;
}

.bson-dawn-source {
  font-size: 12px;
  color: #586a79;
  margin: 0;
}

.bson-dawn-source a {
  color: #205c83;
  text-decoration: underline;
}

@media (max-width: 600px) {
  .bson-dawn-box {
    padding: 18px;
  }

  .bson-dawn-box h3 {
    font-size: 19px;
  }

  .bson-dawn-item p,
  .bson-dawn-intro {
    font-size: 14px;
  }
}





The Committee also advocates a coordinated 24-hour economy strategy, opportunities in wellness tourism and greater use of Brisbane's outdoor lifestyle as the city prepares for the 2032 Olympic and Paralympic Games.



Committee for Brisbane chief executive Jen Williams has identified early-morning activity as an opportunity to strengthen the city's economy alongside its established night-time hospitality and entertainment sectors.



Queensland's&nbsp;draft State Planning Policy&nbsp;also recognises dawn and night-time economic activity as considerations in land-use planning. Public consultation on the draft closed on 26 October, with the final policy yet to be settled.



Existing recreation investment and transport priorities



Brisbane City Council has separately announced a $5.6 million investment in&nbsp;Move Well Brisbane, expanding its existing Active and Healthy programme. Council says the initiative will deliver 20,000 free and low-cost activity sessions over two years and involve approximately 400 local businesses.



Activities will be available across mornings, evenings and weekends, including fitness, nutrition and wellbeing programmes. Funding for Move Well Brisbane is separate from any future infrastructure commitments arising from the Dawn Economy Plan.



Council Opposition Leader Jared Cassidy criticised the survey as unnecessary, arguing that council should prioritise earlier public transport services and improved lighting in parks and along bikeways, particularly during winter mornings.



The Dawn Economy Plan remains in development, with no confirmed list of suburb-specific upgrades, construction timetable or dedicated infrastructure budget. Feedback from residents, businesses and precinct representatives will help inform the council's next steps.



Published 27-Oct-2026Featured Image Credit: Committee for Brisbane




]]></content:encoded>
</item><item>
<title><![CDATA[Tarragindi Tigers Keep Junior Football Going Through Spring]]></title>
<link>https://tarragindinews.com.au/tarragindi-tigers-spring-football-2026</link>
<media:content url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Tarragindi-Tigers-FI.png" medium="image"/>
<media:thumbnail url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Tarragindi-Tigers-FI.png"/>
<enclosure url="https://tarragindinews.com.au/wp-content/uploads/2026/11/Tarragindi-Tigers-FI.png" length="1246195" type="image/png"/>
<pubDate>Wed, 04 Nov 2026 02:00:23 +0000</pubDate>
<dc:creator><![CDATA[Tarragindi News]]></dc:creator>
<guid isPermaLink="true">https://tarragindinews.com.au/?page_id=19213</guid>
<description><![CDATA[
Junior football remains on the calendar in Tarragindi this spring, with Tarragindi Tigers Football Club running an eight-week small-sided competition at its Esher Street grounds for local children and teenagers.




Read: Tarragindi Clubs Join Statewide Push for Transparency in Football Fees
    



The 2026 programme is scheduled from 5 October to 28 November, allowing young players to continue developing their skills beyond the regular winter season. The club has organised separate age divisions for boys and girls, alongside competitions for adult players.



Rather than simply extending the traditional football season, the spring format offers shorter matches, smaller teams and opportunities for children to keep playing with friends or join new groups.



Smaller teams offer more time on the ball



The competition uses five-a-side and seven-a-side formats, depending on the players' ages.



Boys aged five to seven compete in five-a-side matches lasting 30 minutes, while boys aged eight to 17 play seven-a-side games lasting 40 minutes. Girls' divisions also offer five-a-side matches for younger age groups, with seven-a-side available for older teenagers.



With fewer players sharing the field, the format is designed to encourage more involvement in matches and continued development of football skills.



The club's published competition rules place an emphasis on enjoyment, participation and skill development. They also encourage experienced players to support newcomers rather than treating every match as a contest that must be won.







Weeknight football brings families back to Esher Street



Junior competitions are scheduled across Monday, Wednesday and Thursday evenings, with different age groups allocated to specific nights.



Monday includes several younger boys' and girls' divisions, Wednesday features boys aged eight to nine and older teenage girls, and Thursday is allocated to boys aged 12 to 17.



For Tarragindi families, the programme provides a local option for organised sport during spring without requiring children to wait until the next outdoor season.



Players can register with an organised group or nominate friends they would like to join. The club also accepts individual registrations and attempts to place players into suitable teams, although preferred placements are not guaranteed.



A community club extending the football season



Tarragindi Tigers operates as a not-for-profit community football club, with parent volunteers contributing to coaching, team management, canteen operations and other activities throughout the year.



Its regular programmes cater for young beginners through to senior players. The spring competition builds on that structure by providing another opportunity for families to remain involved outside the main football season.



The club's competition guidelines also set expectations for player and spectator conduct, including respect for referees and appropriate behaviour around the grounds.




Read: From 530 Runners to a Sell-Out: Ten Years on the Trails of Toohey Forest



The eight-week programme is scheduled to conclude on 28 November. Families seeking competition information, including fixtures, ladders and registration requirements, can consult the club's official seven-a-side competition page.



Published 25-Oct-2026




]]></description>
<content:encoded><![CDATA[
Junior football remains on the calendar in Tarragindi this spring, with Tarragindi Tigers Football Club running an eight-week small-sided competition at its Esher Street grounds for local children and teenagers.




Read: Tarragindi Clubs Join Statewide Push for Transparency in Football Fees
    



The 2026 programme is scheduled from 5 October to 28 November, allowing young players to continue developing their skills beyond the regular winter season. The club has organised separate age divisions for boys and girls, alongside competitions for adult players.



Rather than simply extending the traditional football season, the spring format offers shorter matches, smaller teams and opportunities for children to keep playing with friends or join new groups.



Smaller teams offer more time on the ball



The competition uses five-a-side and seven-a-side formats, depending on the players' ages.



Boys aged five to seven compete in five-a-side matches lasting 30 minutes, while boys aged eight to 17 play seven-a-side games lasting 40 minutes. Girls' divisions also offer five-a-side matches for younger age groups, with seven-a-side available for older teenagers.



With fewer players sharing the field, the format is designed to encourage more involvement in matches and continued development of football skills.



The club's published competition rules place an emphasis on enjoyment, participation and skill development. They also encourage experienced players to support newcomers rather than treating every match as a contest that must be won.







Weeknight football brings families back to Esher Street



Junior competitions are scheduled across Monday, Wednesday and Thursday evenings, with different age groups allocated to specific nights.



Monday includes several younger boys' and girls' divisions, Wednesday features boys aged eight to nine and older teenage girls, and Thursday is allocated to boys aged 12 to 17.



For Tarragindi families, the programme provides a local option for organised sport during spring without requiring children to wait until the next outdoor season.



Players can register with an organised group or nominate friends they would like to join. The club also accepts individual registrations and attempts to place players into suitable teams, although preferred placements are not guaranteed.



A community club extending the football season



Tarragindi Tigers operates as a not-for-profit community football club, with parent volunteers contributing to coaching, team management, canteen operations and other activities throughout the year.



Its regular programmes cater for young beginners through to senior players. The spring competition builds on that structure by providing another opportunity for families to remain involved outside the main football season.



The club's competition guidelines also set expectations for player and spectator conduct, including respect for referees and appropriate behaviour around the grounds.




Read: From 530 Runners to a Sell-Out: Ten Years on the Trails of Toohey Forest



The eight-week programme is scheduled to conclude on 28 November. Families seeking competition information, including fixtures, ladders and registration requirements, can consult the club's official seven-a-side competition page.



Published 25-Oct-2026




]]></content:encoded>
</item>
</channel>
</rss>
<!--
Performance optimized by W3 Total Cache. Learn more: https://www.boldgrid.com/w3-total-cache/?utm_source=w3tc&utm_medium=footer_comment&utm_campaign=free_plugin

Page Caching using Disk: Enhanced 

Served from: forestlakenews.com.au @ 2026-11-17 01:01:09 by W3 Total Cache
-->